{"ok":true,"source":"autobahn","apiBase":"https://verkehr.autobahn.de/o/autobahn","roads":["A1"],"events":[{"id":"6aa5cbe58cface7d44ed332b","source":"mobilithek","sourceId":"hamburg_baustellen:hamburg_baustellen-140-9f9ebd484a28350f50f68b416496e0ba070edbfe","service":"hamburg_baustellen","type":"roadwork","category":"roadworks","subType":"hamburg-baustellen","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A 1, HH-Stillhorn / Wochenendsperrung","description":"Es erfolgt eine Sperrung der A1 in Fahrtrichtung Bremen zwischen den Anschlussstellen HH-Stillhorn (37) und HH-Harburg (38).\nDie Richtungsfahrbahn Bremen wird von Freitag, 18. September 2026, 22:00 Uhr, bis Montag, 21. September 2026, 5:00 Uhr gesperrt.","road":"A1","direction":"Bremen","locationText":"A 1, HH-Stillhorn / Wochenendsperrung","lat":53.469408048081554,"lng":10.023918907478034,"geometry":{"type":"Point","coordinates":[10.023918907478034,53.469408048081554]},"startTime":"2026-09-18T12:00:00.000Z","endTime":"2026-09-21T12:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:17:07.379Z","updatedAt":"2026-09-13T15:17:13.516Z"},{"id":"6a9fc7f18cface7d44e812ad","source":"autobahn","sourceId":"2026-045619--vi-bs.2026-09-23_10-00-00-000.devi-zus.2026-09-23_10-00-00-000.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Westhofener Kreuz - Schwerte","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n23.09.26 von 10:00 bis 14:00 Uhr\nA1: Köln -> Dortmund, zwischen 3.0 km hinter AK Westhofener Kreuz und 0.3 km vor AS Schwerte\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m\nA1 - Bauwerksarbeiten - AkD 45619","road":"A1","direction":"Köln -> Dortmund","locationText":"Schwerte - Westhofener Kreuz","lat":51.454522645364094,"lng":7.551814986974963,"geometry":{"type":"LineString","coordinates":[[7.551814987,51.454522645],[7.5535416,51.454985501],[7.555083131,51.455395271]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.266Z"},{"id":"6aa004008cface7d44e84768","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de161","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)\nLänge: 0.16 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (aus Richtung Unna-Ost)","locationText":"","lat":51.527512643575314,"lng":7.659786716788224,"geometry":{"type":"LineString","coordinates":[[7.659786717,51.527512644],[7.659844,51.527604101],[7.6600033,51.527790801],[7.6601331,51.527914001],[7.6602954,51.528045601],[7.6605403,51.528199201],[7.6607721,51.528289901],[7.6610404,51.528351201],[7.6612807,51.528363601],[7.661424106,51.528345839]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.581Z"},{"id":"6a9fc7f18cface7d44e812ae","source":"autobahn","sourceId":"2026-045619--vi-bs.2026-09-23_10-00-00-000.devi-zus.2026-09-23_10-00-00-000.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Schwerte - Westhofener Kreuz","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n23.09.26 von 10:00 bis 14:00 Uhr\nA1: Dortmund -> Köln, zwischen 0.3 km hinter AS Schwerte und 3.0 km vor AK Westhofener Kreuz\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m\nA1 - Bauwerksarbeiten - AkD 45619","road":"A1","direction":"Dortmund -> Köln","locationText":"Westhofener Kreuz - Schwerte","lat":51.45552601745467,"lng":7.554993710058543,"geometry":{"type":"LineString","coordinates":[[7.55499371,51.455526017],[7.554853,51.455488301],[7.5536909,51.455179801],[7.551725719,51.454652565]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.275Z"},{"id":"6a9fc7f18cface7d44e812af","source":"autobahn","sourceId":"2026-045834--vi-bs.2026-09-20_22-00-00-000.devi-bs.2026-09-15_09-00-00-000_001.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Hamm-Bockum/Werne - Hasenkämpe","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n20.09.26 22:00 bis zum 21.09.26 06:00 Uhr.\nA1: Dortmund -> Münster, zwischen 0.8 km hinter AS Hamm-Bockum/Werne und 4.6 km vor Hasenkämpe\nLänge: 0.65 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7 m\nA1 - Beschilderungsarbeiten - AkD 45834","road":"A1","direction":"Dortmund -> Münster","locationText":"Hasenkämpe - Hamm-Bockum/Werne","lat":51.70279733671484,"lng":7.663150140910347,"geometry":{"type":"LineString","coordinates":[[7.663150141,51.702797337],[7.6629487,51.703141801],[7.6627832,51.703419901],[7.6609876,51.706617001],[7.660130115,51.708318723]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.338Z"},{"id":"6a9fc7f18cface7d44e812b0","source":"autobahn","sourceId":"2026-045834--vi-bs.2026-09-15_09-00-00-000.devi-bs.2026-09-15_09-00-00-000_001.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Hamm-Bockum/Werne - Hasenkämpe","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 09:00 bis 15:00 Uhr\nA1: Dortmund -> Münster, zwischen 0.8 km hinter AS Hamm-Bockum/Werne und 4.6 km vor Hasenkämpe\nLänge: 0.65 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7 m\nA1 - Beschilderungsarbeiten - AkD 45834","road":"A1","direction":"Dortmund -> Münster","locationText":"Hasenkämpe - Hamm-Bockum/Werne","lat":51.70279733671484,"lng":7.663150140910347,"geometry":{"type":"LineString","coordinates":[[7.663150141,51.702797337],[7.6629487,51.703141801],[7.6627832,51.703419901],[7.6609876,51.706617001],[7.660130115,51.708318723]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.339Z"},{"id":"6a9fc7f18cface7d44e812b3","source":"autobahn","sourceId":"2026-045779--vi-bs.2026-09-15_09-00-00-000.devi-bs.2026-09-15_09-00-00-000.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Sandrup - Münster-Süd","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 09:00 bis 15:00 Uhr\nA1: Osnabrück -> Dortmund, zwischen 2.9 km hinter Sandrup und 1.7 km vor AK Münster-Süd\nLänge: 9.58 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m\nA1 - Beschilderungsarbeiten - Wanderbaustelle - AkD 45779","road":"A1","direction":"Osnabrück -> Dortmund","locationText":"Münster-Süd - Sandrup","lat":52.01044471468095,"lng":7.580048999248286,"geometry":{"type":"LineString","coordinates":[[7.580048999,52.010444715],[7.579629,52.010093301],[7.5791864,52.009716001],[7.5784126,52.009040801],[7.5776736,52.008372101],[7.5772619,52.007988301],[7.5766718,52.007431001],[7.5762682,52.007038201],[7.575611,52.006383401],[7.575033,52.005790701],[7.574506,52.005234201],[7.5741814,52.004882501],[7.5741103,52.004806601],[7.5734693,52.004094101],[7.5727424,52.003252001],[7.5721818,52.002577501],[7.5715984,52.001854201],[7.5714053,52.001611501],[7.5706811,52.000690101],[7.5702131,52.000084001],[7.569501,51.999179101],[7.5680338,51.997400101],[7.5668673,51.996106601],[7.5664387,51.995631301],[7.5650315,51.994209401],[7.5638607,51.993096901],[7.5630414,51.992349101],[7.5609616,51.990504801],[7.5592164,51.988922701],[7.5588937,51.988615301],[7.5579762,51.987707101],[7.5572028,51.986916201],[7.5561657,51.985789901],[7.5552636,51.984760501],[7.5551512,51.984629101],[7.5542866,51.983576501],[7.5538091,51.982966801],[7.5522055,51.980722201],[7.5518328,51.980152201],[7.5513786,51.979446701],[7.5509575,51.978734701],[7.5501409,51.977302801],[7.5497113,51.976484301],[7.5492127,51.975468301],[7.548747,51.974447001],[7.5484295,51.973688001],[7.5481278,51.972928801],[7.5478336,51.972126701],[7.5475269,51.971224301],[7.5472641,51.970358501],[7.5470274,51.969491801],[7.546895,51.968992701],[7.5467531,51.968374601],[7.5466031,51.967694201],[7.5465285,51.967325401],[7.5463428,51.966280901],[7.5462965,51.965952101],[7.5462475,51.965636901],[7.5462093,51.965326601],[7.5461657,51.964999801],[7.5461322,51.964678301],[7.5460839,51.964202401],[7.5460121,51.963261501],[7.5460096,51.963221001],[7.5459686,51.962273701],[7.5459572,51.961791101],[7.5459559,51.961310101],[7.5459599,51.960825001],[7.5459713,51.960504801],[7.5460733,51.958697601],[7.5461639,51.957789401],[7.5465089,51.955505901],[7.5467445,51.954253801],[7.5470909,51.952631101],[7.5476727,51.950151501],[7.547761,51.949774501],[7.5481097,51.948284501],[7.5489286,51.945329501],[7.5494103,51.943591301],[7.5496461,51.942753001],[7.5500792,51.941285501],[7.5502017,51.940890701],[7.5503646,51.940353101],[7.5513131,51.937399701],[7.5516133,51.936480601],[7.5516499,51.936374001],[7.5519937,51.935391001],[7.5524799,51.933933601],[7.5531419,51.932081401],[7.5533739,51.931432201],[7.5536761,51.930569801],[7.55394011,51.929897451]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.352Z"},{"id":"6a9fc7f18cface7d44e812b4","source":"autobahn","sourceId":"2026-045779--vi-bs.2026-09-15_09-00-00-000.devi-bs.2026-09-15_09-00-00-000.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Sandrup - Münster-Süd","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 09:00 bis 15:00 Uhr\nA1: Osnabrück -> Dortmund, zwischen 2.9 km hinter Sandrup und 1.7 km vor AK Münster-Süd\nLänge: 9.58 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m\nA1 - Beschilderungsarbeiten - Wanderbaustelle - AkD 45779","road":"A1","direction":"Osnabrück -> Dortmund","locationText":"Münster-Süd - Sandrup","lat":52.01044471468095,"lng":7.580048999248286,"geometry":{"type":"LineString","coordinates":[[7.580048999,52.010444715],[7.579629,52.010093301],[7.5791864,52.009716001],[7.5784126,52.009040801],[7.5776736,52.008372101],[7.5772619,52.007988301],[7.5766718,52.007431001],[7.5762682,52.007038201],[7.575611,52.006383401],[7.575033,52.005790701],[7.574506,52.005234201],[7.5741814,52.004882501],[7.5741103,52.004806601],[7.5734693,52.004094101],[7.5727424,52.003252001],[7.5721818,52.002577501],[7.5715984,52.001854201],[7.5714053,52.001611501],[7.5706811,52.000690101],[7.5702131,52.000084001],[7.569501,51.999179101],[7.5680338,51.997400101],[7.5668673,51.996106601],[7.5664387,51.995631301],[7.5650315,51.994209401],[7.5638607,51.993096901],[7.5630414,51.992349101],[7.5609616,51.990504801],[7.5592164,51.988922701],[7.5588937,51.988615301],[7.5579762,51.987707101],[7.5572028,51.986916201],[7.5561657,51.985789901],[7.5552636,51.984760501],[7.5551512,51.984629101],[7.5542866,51.983576501],[7.5538091,51.982966801],[7.5522055,51.980722201],[7.5518328,51.980152201],[7.5513786,51.979446701],[7.5509575,51.978734701],[7.5501409,51.977302801],[7.5497113,51.976484301],[7.5492127,51.975468301],[7.548747,51.974447001],[7.5484295,51.973688001],[7.5481278,51.972928801],[7.5478336,51.972126701],[7.5475269,51.971224301],[7.5472641,51.970358501],[7.5470274,51.969491801],[7.546895,51.968992701],[7.5467531,51.968374601],[7.5466031,51.967694201],[7.5465285,51.967325401],[7.5463428,51.966280901],[7.5462965,51.965952101],[7.5462475,51.965636901],[7.5462093,51.965326601],[7.5461657,51.964999801],[7.5461322,51.964678301],[7.5460839,51.964202401],[7.5460121,51.963261501],[7.5460096,51.963221001],[7.5459686,51.962273701],[7.5459572,51.961791101],[7.5459559,51.961310101],[7.5459599,51.960825001],[7.5459713,51.960504801],[7.5460733,51.958697601],[7.5461639,51.957789401],[7.5465089,51.955505901],[7.5467445,51.954253801],[7.5470909,51.952631101],[7.5476727,51.950151501],[7.547761,51.949774501],[7.5481097,51.948284501],[7.5489286,51.945329501],[7.5494103,51.943591301],[7.5496461,51.942753001],[7.5500792,51.941285501],[7.5502017,51.940890701],[7.5503646,51.940353101],[7.5513131,51.937399701],[7.5516133,51.936480601],[7.5516499,51.936374001],[7.5519937,51.935391001],[7.5524799,51.933933601],[7.5531419,51.932081401],[7.5533739,51.931432201],[7.5536761,51.930569801],[7.55394011,51.929897451]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.354Z"},{"id":"6a9fc7f28cface7d44e812b6","source":"autobahn","sourceId":"2026-045837--vi-fbm.2026-09-14_09-00-00-000_002.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Baustelleneinrichtung - AkD 45837","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 16:00 Uhr\n15.09.26 von 09:00 bis 16:00 Uhr\n16.09.26 von 09:00 bis 16:00 Uhr\nAbfahrt von der A2: AK Kamener Kreuz (aus Richtung Kamen/Bergkamen)\nLänge: 0.11 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Baustelleneinrichtung - AkD 45837","road":"A1","direction":"AK Kamener Kreuz (aus Richtung Kamen/Bergkamen)","locationText":"","lat":51.60083848220603,"lng":7.679816576427236,"geometry":{"type":"LineString","coordinates":[[7.679816576,51.600838482],[7.6800747,51.600826001],[7.6806615,51.600800101],[7.681399095,51.600794845]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.552Z"},{"id":"6a9ffe2b8cface7d44e84322","source":"autobahn","sourceId":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de175","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Bakumer Wiesen - Cappeln Hagelage-Ost","description":"Zeitraum dieser Bauphase:\nBeginn: 11.09.26 um 19:00 Uhr\nEnde: 30.10.26 um 19:00 Uhr\n(Ende der Gesamtmaßnahme: 30.10.26)\nA1: Osnabrück -> Bremen, zwischen 0.3 km hinter Bakumer Wiesen und 3.7 km vor Cappeln Hagelage-Ost\nLänge: 4.1 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m\nA1 - 6 Brückenersatzneubauten - AlD 4447","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Cappeln Hagelage-Ost - Bakumer Wiesen","lat":52.7145860136506,"lng":8.172925738573374,"geometry":{"type":"LineString","coordinates":[[8.172925739,52.714586014],[8.1729207,52.714772801],[8.1728903,52.716776401],[8.1728845,52.717465901],[8.172887,52.717867301],[8.1729153,52.720676201],[8.1729807,52.722447501],[8.1731501,52.725199901],[8.1732781,52.726549701],[8.1734995,52.728487201],[8.1741477,52.732441301],[8.1743015,52.733228101],[8.1746492,52.734785601],[8.1748436,52.735569701],[8.1751323,52.736694201],[8.1755168,52.738063401],[8.1758053,52.739002301],[8.1762569,52.740401501],[8.1769301,52.742311601],[8.1771991,52.743035601],[8.1776056,52.744062701],[8.1780274,52.745088001],[8.1783294,52.745805901],[8.1788238,52.746930001],[8.1795105,52.748424801],[8.1799962,52.749451701],[8.1807098,52.750892301],[8.180734333,52.750939999]]},"startTime":"2026-09-11T17:00:00.000Z","endTime":"2026-10-30T19:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.448Z"},{"id":"6a9ffe2b8cface7d44e84323","source":"autobahn","sourceId":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de177","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Vechta - Cloppenburg","description":"Zeitraum dieser Bauphase:\nBeginn: 11.09.26 um 19:00 Uhr\nEnde: 30.10.26 um 19:00 Uhr\n(Ende der Gesamtmaßnahme: 30.10.26)\nA1: Osnabrück -> Bremen, zwischen 5.7 km hinter AS Vechta und 2.1 km vor AS Cloppenburg\nLänge: 2.3 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m\nA1 - 6 Brückenersatzneubauten - AlD 4447","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Cloppenburg - Vechta","lat":52.77466851084272,"lng":8.194549640402776,"geometry":{"type":"LineString","coordinates":[[8.19454964,52.774668511],[8.1950843,52.775583601],[8.1965443,52.778186601],[8.1970188,52.779044401],[8.1974698,52.779876401],[8.1984592,52.781750101],[8.1989469,52.782693801],[8.1998104,52.784391801],[8.2008382,52.786495101],[8.2018434,52.788601201],[8.2028259,52.790765201],[8.2038098,52.793013501],[8.204405049,52.794442225]]},"startTime":"2026-09-11T17:00:00.000Z","endTime":"2026-10-30T19:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.452Z"},{"id":"6a9ffe2b8cface7d44e84324","source":"autobahn","sourceId":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de181","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Cappeln Hagelage-Ost - Vechta","description":"Zeitraum dieser Bauphase:\nBeginn: 11.09.26 um 19:00 Uhr\nEnde: 30.10.26 um 19:00 Uhr\n(Ende der Gesamtmaßnahme: 30.10.26)\nA1: Bremen -> Osnabrück, zwischen 2.6 km hinter Cappeln Hagelage-Ost und 0.2 km vor AS Vechta\nLänge: 3.73 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m\nA1 - 6 Brückenersatzneubauten - AlD 4447","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Vechta - Cappeln Hagelage-Ost","lat":52.759718834823325,"lng":8.185348049023899,"geometry":{"type":"LineString","coordinates":[[8.185348049,52.759718835],[8.1849617,52.759066301],[8.1842883,52.757899301],[8.1840204,52.757441801],[8.1833973,52.756341301],[8.1827837,52.755237801],[8.1817903,52.753417701],[8.1813951,52.752672201],[8.180869,52.751664501],[8.1804956,52.750928101],[8.1797817,52.749483501],[8.1792904,52.748462001],[8.1786007,52.746954401],[8.178111,52.745835701],[8.1778042,52.745111801],[8.1773859,52.744086001],[8.1769791,52.743060801],[8.176709,52.742337201],[8.1760329,52.740415301],[8.1755808,52.739012201],[8.1752957,52.738071001],[8.1749114,52.736700001],[8.1746162,52.735577701],[8.1744198,52.734779801],[8.1740753,52.733241501],[8.1739414,52.732479301],[8.1734663,52.729773401],[8.1732964,52.728656501],[8.1732632,52.728391101],[8.173123031,52.727162956]]},"startTime":"2026-09-11T17:00:00.000Z","endTime":"2026-10-30T19:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.454Z"},{"id":"6a9ffe2b8cface7d44e84325","source":"autobahn","sourceId":"2026-045929--vi-bs.2026-09-22_09-00-00-000_001.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Cappeln Hagelage-West - Cloppenburg","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n22.09.26 von 09:00 bis 15:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.2 km hinter Cappeln Hagelage-West und 0.4 km vor AS Cloppenburg\nLänge: 0.7 km | Maximale Durchfahrtsbreite: 12 m\nA1 - Vermessungsarbeiten - AkD 45929","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Cloppenburg - Cappeln Hagelage-West","lat":52.803218696588424,"lng":8.207763940013175,"geometry":{"type":"LineString","coordinates":[[8.20776394,52.803218697],[8.2084419,52.805190001],[8.2092593,52.807731101],[8.2095046,52.808549901],[8.2095365,52.808656301],[8.209752673,52.809377887]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.456Z"},{"id":"6a9ffe2b8cface7d44e84326","source":"autobahn","sourceId":"2023-004447--vi-bs.2026-09-11_19-00-00-000.devi-zus.2024-05-02_19-00-00-000_018.f.de179","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Cloppenburg - Cappeln Hagelage-West","description":"Zeitraum dieser Bauphase:\nBeginn: 11.09.26 um 19:00 Uhr\nEnde: 30.10.26 um 19:00 Uhr\n(Ende der Gesamtmaßnahme: 30.10.26)\nA1: Bremen -> Osnabrück, zwischen 0.6 km hinter AS Cloppenburg und 0.7 km vor Cappeln Hagelage-West\nLänge: 2 km | Max. 120 km/h | Maximale Durchfahrtsbreite: 10.75 m\nA1 - 6 Brückenersatzneubauten - AlD 4447","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Cappeln Hagelage-West - Cloppenburg","lat":52.80765172794196,"lng":8.209007207686371,"geometry":{"type":"LineString","coordinates":[[8.209007208,52.807651728],[8.2082189,52.805196801],[8.2072176,52.802294201],[8.2062877,52.799753501],[8.2056295,52.798024101],[8.2047904,52.795908501],[8.2035895,52.793036201],[8.2026068,52.790789501],[8.202309926,52.790148007]]},"startTime":"2026-09-11T17:00:00.000Z","endTime":"2026-10-30T19:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.459Z"},{"id":"6aa004008cface7d44e8475e","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de139","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Lichtendorf - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Köln -> Münster, zwischen 7.3 km hinter Lichtendorf und 0.4 km vor AS Unna\nLänge: 0.35 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Köln -> Münster","locationText":"Unna - Lichtendorf","lat":51.52011554894408,"lng":7.6572940343554805,"geometry":{"type":"LineString","coordinates":[[7.657294034,51.520115549],[7.6575551,51.520679501],[7.6579126,51.521477201],[7.658036,51.521790201],[7.6583571,51.522687401],[7.6585048,51.523145201],[7.658506253,51.523150934]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.286Z"},{"id":"6aa004008cface7d44e8475f","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de141","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Dortmund/Unna - Kamen-Zentrum","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Dortmund -> Münster, zwischen 0.1 km hinter AK Dortmund/Unna und 5.4 km vor AS Kamen-Zentrum\nLänge: 0.55 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Dortmund -> Münster","locationText":"Kamen-Zentrum - Dortmund/Unna","lat":51.523150934357034,"lng":7.658506253175489,"geometry":{"type":"LineString","coordinates":[[7.658506253,51.523150934],[7.6586696,51.523795401],[7.659594785,51.528021224]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.293Z"},{"id":"6aa004008cface7d44e84760","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de143","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Unna - Kamen-Zentrum","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Dortmund -> Münster, zwischen 0.2 km hinter AS Unna und 4.2 km vor AS Kamen-Zentrum\nLänge: 1.2 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Dortmund -> Münster","locationText":"Kamen-Zentrum - Unna","lat":51.528021224289745,"lng":7.659594784598197,"geometry":{"type":"LineString","coordinates":[[7.659594785,51.528021224],[7.6596232,51.528151001],[7.6599689,51.529711001],[7.6604344,51.531820701],[7.6608321,51.533678301],[7.6613998,51.536336501],[7.6617604,51.537943301],[7.6618199,51.538205101],[7.661922731,51.538684932]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.299Z"},{"id":"6aa004008cface7d44e84761","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de173","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamen-Zentrum - Lichtendorf","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Köln, zwischen 4.6 km hinter AS Kamen-Zentrum und 7.3 km vor Lichtendorf\nLänge: 1.64 km | Maximale Durchfahrtsbreite: 6.1 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Köln","locationText":"Lichtendorf - Kamen-Zentrum","lat":51.534697933083436,"lng":7.660792116765035,"geometry":{"type":"LineString","coordinates":[[7.660792117,51.534697933],[7.6606224,51.533943701],[7.6605195,51.533380101],[7.660249,51.532127501],[7.6601147,51.531467901],[7.659834,51.530173501],[7.6584509,51.523794501],[7.6582511,51.522961101],[7.6576962,51.521493601],[7.6573724,51.520748501],[7.657095294,51.520161026]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.304Z"},{"id":"6aa004008cface7d44e84762","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de171","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamen-Zentrum - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Dortmund, zwischen 4.2 km hinter AS Kamen-Zentrum und 0.9 km vor AS Unna\nLänge: 0.45 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Dortmund","locationText":"Unna - Kamen-Zentrum","lat":51.53870589158548,"lng":7.661669793519102,"geometry":{"type":"LineString","coordinates":[[7.661669794,51.538705892],[7.6615908,51.538332901],[7.6615296,51.538071901],[7.6611478,51.536341501],[7.6609411,51.535369201],[7.6607967,51.534718301],[7.660792117,51.534697933]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.306Z"},{"id":"6aa004008cface7d44e84763","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de169","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamen-Zentrum - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Dortmund, zwischen 3.7 km hinter AS Kamen-Zentrum und 1.4 km vor AS Unna\nLänge: 0.5 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Dortmund","locationText":"Unna - Kamen-Zentrum","lat":51.543161175750306,"lng":7.662630148908579,"geometry":{"type":"LineString","coordinates":[[7.662630149,51.543161176],[7.6625776,51.542913201],[7.6621581,51.540988301],[7.6620714,51.540602101],[7.661669794,51.538705892]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.308Z"},{"id":"6aa004008cface7d44e84764","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de167","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamen-Zentrum - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Dortmund, zwischen 3.1 km hinter AS Kamen-Zentrum und 1.9 km vor AS Unna\nLänge: 0.55 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Dortmund","locationText":"Unna - Kamen-Zentrum","lat":51.54807762491685,"lng":7.66338581658675,"geometry":{"type":"LineString","coordinates":[[7.663385817,51.548077625],[7.663182,51.546327901],[7.6630105,51.545175201],[7.6626733,51.543364801],[7.662630149,51.543161176]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.310Z"},{"id":"6aa004008cface7d44e84765","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de155","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)\nLänge: 0.57 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Kamen-Zentrum)","locationText":"","lat":51.526064892427755,"lng":7.6587703454363725,"geometry":{"type":"LineString","coordinates":[[7.658770345,51.526064892],[7.6585413,51.525069001],[7.6582441,51.523742801],[7.6580498,51.523000401],[7.6579071,51.522646401],[7.6575484,51.521660301],[7.657265517,51.521018666]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.556Z"},{"id":"6aa004008cface7d44e84766","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de165","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)\nLänge: 0.16 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Dortmund/Unna)","locationText":"","lat":51.52380678939381,"lng":7.658824591311105,"geometry":{"type":"LineString","coordinates":[[7.658824591,51.523806789],[7.6590778,51.524865101],[7.659149627,51.525211634]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.577Z"},{"id":"6aa004008cface7d44e84767","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de163","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)\nLänge: 0.12 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Dortmund/Unna)","locationText":"","lat":51.528513456440436,"lng":7.661033837547566,"geometry":{"type":"LineString","coordinates":[[7.661033838,51.528513456],[7.6609004,51.528542101],[7.6606938,51.528614801],[7.6605377,51.528699401],[7.6604068,51.528821101],[7.6603288,51.528935501],[7.6602725,51.529090401],[7.6602312,51.529336001],[7.660227883,51.529381099]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.579Z"},{"id":"6a9970c88cface7d44e2de4f","source":"autobahn","sourceId":"2026-045143--vi-bs.2026-09-15_08-00-00-000.devi-bs.2026-09-08_08-00-00-000_003.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Dortmund/Unna - Lichtendorf","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 08:00 bis 16:00 Uhr\n16.09.26 von 08:00 bis 16:00 Uhr\nA1: Münster -> Köln, zwischen 3.4 km hinter AK Dortmund/Unna und 3.9 km vor Lichtendorf\nLänge: 0.3 km | Maximale Durchfahrtsbreite: 9.5 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 45143","road":"A1","direction":"Münster -> Köln","locationText":"Lichtendorf - Dortmund/Unna","lat":51.49571636905636,"lng":7.6361202353292255,"geometry":{"type":"LineString","coordinates":[[7.636120235,51.495716369],[7.6351372,51.495027801],[7.63466,51.494689501],[7.63325641,51.493696108]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.290Z"},{"id":"6a9a6f5f8cface7d44e389b6","source":"autobahn","sourceId":"2026-045297--vi-fbm.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_002.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Haus Reck - Kamener Kreuz","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\n15.09.26 von 09:00 bis 15:00 Uhr\n16.09.26 von 09:00 bis 15:00 Uhr\nA1: Münster -> Dortmund, zwischen 0.1 km hinter Haus Reck und 1.2 km vor AK Kamener Kreuz\nLänge: 0.93 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Baustelleneinrichtung - Wanderbaustelle - AkD 45297","road":"A1","direction":"Münster -> Dortmund","locationText":"Kamener Kreuz - Haus Reck","lat":51.61984515309781,"lng":7.689336416374088,"geometry":{"type":"LineString","coordinates":[[7.689336416,51.619845153],[7.6893954,51.619656401],[7.6895107,51.619214501],[7.6896358,51.618701001],[7.6897735,51.617952001],[7.6898074,51.617783401],[7.6898901,51.617291001],[7.6899856,51.616443801],[7.690026,51.615879001],[7.6900539,51.615323901],[7.6900488,51.614450601],[7.6900354,51.614042401],[7.6899845,51.613339001],[7.6898746,51.612448501],[7.6897401,51.611661801],[7.68971365,51.611538029]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.326Z"},{"id":"6a6bcb63aded52c38df04704","source":"autobahn","sourceId":"2026-034771--vi-bs.2026-08-15_00-00-00-000.devi-zus.2026-08-15_00-00-00-000.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A602 Arbeiten an Schutzeinrichtungen","description":"Zeitraum dieser Bauphase:\nBeginn: 15.08.26 um 00:00 Uhr\nEnde: 01.12.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 01.12.26)\nAbfahrt von der A1: AD Moseltal (aus Richtung Rioler Wald)\nLänge: 0.26 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.75 m\nA602 Arbeiten an Schutzeinrichtungen","road":"A1","direction":"AD Moseltal (aus Richtung Rioler Wald)","locationText":"","lat":49.80431379845844,"lng":6.760217650164019,"geometry":{"type":"LineString","coordinates":[[6.76021765,49.804313798],[6.7602114,49.804322601],[6.7601538,49.804423801],[6.7601141,49.804523801],[6.7600767,49.804631301],[6.7600707,49.804740601],[6.7600653,49.804810701],[6.7600693,49.804887801],[6.7600826,49.804967601],[6.760119,49.805079401],[6.7601826,49.805218901],[6.7602561,49.805349801],[6.7603261,49.805471201],[6.7603896,49.805549601],[6.7604449,49.805617901],[6.7605354,49.805718501],[6.7606575,49.805815801],[6.7611725,49.806162901],[6.761354,49.806288801],[6.761411064,49.806339587]]},"startTime":"2026-08-14T22:00:00.000Z","endTime":"2026-12-01T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.629Z"},{"id":"6a9970c88cface7d44e2de52","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de11","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Klaterberg - Maestruper Brook","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Münster -> Osnabrück, zwischen 2.0 km hinter Klaterberg und 1.3 km vor Maestruper Brook\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Münster -> Osnabrück","locationText":"Maestruper Brook - Klaterberg","lat":52.08225842434876,"lng":7.641813182288144,"geometry":{"type":"LineString","coordinates":[[7.641813182,52.082258424],[7.6423734,52.082700901],[7.6435681,52.083599401],[7.644105662,52.083994785]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.356Z"},{"id":"6a9970c88cface7d44e2de53","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de9","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Klaterberg - Maestruper Brook","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Münster -> Osnabrück, zwischen 2.0 km hinter Klaterberg und 1.3 km vor Maestruper Brook\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Münster -> Osnabrück","locationText":"Maestruper Brook - Klaterberg","lat":52.08225842434876,"lng":7.641813182288144,"geometry":{"type":"LineString","coordinates":[[7.641813182,52.082258424],[7.6423734,52.082700901],[7.6435681,52.083599401],[7.644105662,52.083994785]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.358Z"},{"id":"6a9970c88cface7d44e2de54","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de15","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Maestruper Brook - Klaterberg","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Osnabrück -> Münster, zwischen 1.1 km hinter Maestruper Brook und 2.3 km vor Klaterberg\nLänge: 0.27 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Osnabrück -> Münster","locationText":"Klaterberg - Maestruper Brook","lat":52.085760844577464,"lng":7.64636949879491,"geometry":{"type":"LineString","coordinates":[[7.646369499,52.085760845],[7.6458662,52.085423401],[7.6440623,52.084138601],[7.64373777,52.083900794]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.360Z"},{"id":"6a9970c88cface7d44e2de55","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de13","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Maestruper Brook - Klaterberg","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Osnabrück -> Münster, zwischen 1.1 km hinter Maestruper Brook und 2.3 km vor Klaterberg\nLänge: 0.27 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Osnabrück -> Münster","locationText":"Klaterberg - Maestruper Brook","lat":52.085760844577464,"lng":7.64636949879491,"geometry":{"type":"LineString","coordinates":[[7.646369499,52.085760845],[7.6458662,52.085423401],[7.6440623,52.084138601],[7.64373777,52.083900794]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.362Z"},{"id":"6a9970c88cface7d44e2de56","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Flughafen Münster/Osnabrück - Mühlenbach","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Münster -> Osnabrück, zwischen 0.8 km hinter AS Flughafen Münster/Osnabrück und 1.4 km vor Mühlenbach\nLänge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Münster -> Osnabrück","locationText":"Mühlenbach - Flughafen Münster/Osnabrück","lat":52.11947550648156,"lng":7.707587277113918,"geometry":{"type":"LineString","coordinates":[[7.707587277,52.119475506],[7.7087745,52.120508701],[7.7096655,52.121299901],[7.710090785,52.121690821]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.364Z"},{"id":"6a9970c88cface7d44e2de57","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Flughafen Münster/Osnabrück - Mühlenbach","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:15 Uhr.\nA1: Münster -> Osnabrück, zwischen 0.8 km hinter AS Flughafen Münster/Osnabrück und 1.4 km vor Mühlenbach\nLänge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Münster -> Osnabrück","locationText":"Mühlenbach - Flughafen Münster/Osnabrück","lat":52.11947550648156,"lng":7.707587277113918,"geometry":{"type":"LineString","coordinates":[[7.707587277,52.119475506],[7.7087745,52.120508701],[7.7096655,52.121299901],[7.710090785,52.121690821]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.366Z"},{"id":"6a9970c88cface7d44e2de58","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mühlenbach - Flughafen Münster/Osnabrück","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Osnabrück -> Münster, zwischen 1.3 km hinter Mühlenbach und 0.9 km vor AS Flughafen Münster/Osnabrück\nLänge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Osnabrück -> Münster","locationText":"Flughafen Münster/Osnabrück - Mühlenbach","lat":52.12253118365363,"lng":7.710678580519501,"geometry":{"type":"LineString","coordinates":[[7.710678581,52.122531184],[7.7096396,52.121588101],[7.7087411,52.120791701],[7.708197525,52.120309799]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.367Z"},{"id":"6a9970c88cface7d44e2de59","source":"autobahn","sourceId":"2026-045186--vi-bs.2026-09-16_20-00-00-000.devi-zus.2026-09-16_20-00-00-000.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mühlenbach - Flughafen Münster/Osnabrück","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Osnabrück -> Münster, zwischen 1.3 km hinter Mühlenbach und 0.9 km vor AS Flughafen Münster/Osnabrück\nLänge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Bauwerksarbeiten - AkD 45186","road":"A1","direction":"Osnabrück -> Münster","locationText":"Flughafen Münster/Osnabrück - Mühlenbach","lat":52.12253118365363,"lng":7.710678580519501,"geometry":{"type":"LineString","coordinates":[[7.710678581,52.122531184],[7.7096396,52.121588101],[7.7087411,52.120791701],[7.708197525,52.120309799]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.369Z"},{"id":"6a9a5cd88cface7d44e37c23","source":"autobahn","sourceId":"2026-045282--vi-fbm.2026-09-14_09-00-00-000.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamener Kreuz - Kamen-Zentrum","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\n15.09.26 von 09:00 bis 15:00 Uhr\n16.09.26 von 09:00 bis 15:00 Uhr\nA1: Münster -> Dortmund, zwischen 1.4 km hinter AK Kamener Kreuz und 1.1 km vor AS Kamen-Zentrum\nLänge: 0.58 km | Maximale Durchfahrtsbreite: 6 m\nA1 - Baustelleneinrichtung - AkD 45282","road":"A1","direction":"Münster -> Dortmund","locationText":"Kamen-Zentrum - Kamener Kreuz","lat":51.588447333070846,"lng":7.683352801072117,"geometry":{"type":"LineString","coordinates":[[7.683352801,51.588447333],[7.6828909,51.587766101],[7.6824579,51.587183301],[7.6817905,51.586327901],[7.6813866,51.585829801],[7.6803807,51.584618001],[7.679659759,51.583789096]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.323Z"},{"id":"6a9a6f5f8cface7d44e389b5","source":"autobahn","sourceId":"2026-045297--vi-fbm.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_002.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Haus Reck - Kamener Kreuz","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\n15.09.26 von 09:00 bis 15:00 Uhr\n16.09.26 von 09:00 bis 15:00 Uhr\nA1: Münster -> Dortmund, zwischen 0.1 km hinter Haus Reck und 1.2 km vor AK Kamener Kreuz\nLänge: 0.9 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Baustelleneinrichtung - Wanderbaustelle - AkD 45297","road":"A1","direction":"Münster -> Dortmund","locationText":"Kamener Kreuz - Haus Reck","lat":51.61984515309781,"lng":7.689336416374088,"geometry":{"type":"LineString","coordinates":[[7.689336416,51.619845153],[7.6893954,51.619656401],[7.6895107,51.619214501],[7.6896358,51.618701001],[7.6897735,51.617952001],[7.6898074,51.617783401],[7.6898901,51.617291001],[7.6899856,51.616443801],[7.690026,51.615879001],[7.6900539,51.615323901],[7.6900488,51.614450601],[7.6900354,51.614042401],[7.6899845,51.613339001],[7.6898746,51.612448501],[7.689764487,51.611804444]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.325Z"},{"id":"6a9f91fe8cface7d44e7e655","source":"autobahn","sourceId":"2026-013716--vi-bs.2026-09-23_06-00-00-000.devi-zus.2026-08-31_20-00-00-000.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1, AK Maschen, Bauwerksarbeiten, BW432a","description":"Zeitraum dieser Bauphase:\nBeginn: 23.09.26 um 06:00 Uhr\nEnde: 04.11.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 04.11.26)\nAuffahrt auf die A1: AD Horster Dreieck (aus Richtung Maschener Kreuz)\nLänge: 0.13 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4 m\nA1, AK Maschen, Bauwerksarbeiten, BW432a","road":"A1","direction":"AD Horster Dreieck (aus Richtung Maschener Kreuz)","locationText":"","lat":53.38685903678484,"lng":10.02031199050014,"geometry":{"type":"LineString","coordinates":[[10.020311991,53.386859037],[10.0201479,53.386579101],[10.019937,53.386286501],[10.0197234,53.386022701],[10.0196025,53.385886701],[10.019476003,53.385757966]]},"startTime":"2026-09-23T04:00:00.000Z","endTime":"2026-11-04T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.572Z"},{"id":"6a9a6f5f8cface7d44e389b8","source":"autobahn","sourceId":"2026-045335--vi-bs.2026-09-07_08-00-00-000.devi-zus.2026-09-07_08-00-00-000_010.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Barsbüttel - Bargteheide","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 08:00 bis 15:00 Uhr\n15.09.26 von 08:00 bis 15:00 Uhr\n16.09.26 von 08:00 bis 15:00 Uhr\nA1: Hamburg -> Lübeck, zwischen 1.7 km hinter AS Barsbüttel und 2.2 km vor AK Bargteheide\nLänge: 14.72 km | Maximale Durchfahrtsbreite: 7.5 m\nA1 von Stapelfeld (AS) Bauwerksprüfungen","road":"A1","direction":"Hamburg -> Lübeck","locationText":"Bargteheide - Barsbüttel","lat":53.58757417256885,"lng":10.212955088191606,"geometry":{"type":"LineString","coordinates":[[10.212955088,53.587574173],[10.2132344,53.587816301],[10.2136752,53.588192401],[10.2213433,53.594805401],[10.2229406,53.596204201],[10.2230795,53.596326201],[10.2248141,53.597820801],[10.2256456,53.598548201],[10.2264382,53.599290701],[10.2269241,53.599791501],[10.2274027,53.600298601],[10.227668,53.600620601],[10.2279322,53.600950101],[10.2284139,53.601594201],[10.2287583,53.602096101],[10.2290234,53.602530201],[10.2292398,53.602898201],[10.2294409,53.603273001],[10.2297695,53.603936901],[10.2300391,53.604546201],[10.2302694,53.605154001],[10.2310074,53.607786301],[10.2310751,53.608032101],[10.2320254,53.611298701],[10.2320363,53.611336201],[10.2321367,53.611681301],[10.2325997,53.613316001],[10.2332286,53.615478901],[10.2333872,53.616047801],[10.2334911,53.616353501],[10.2336037,53.616632001],[10.2339583,53.617386001],[10.2343246,53.618038001],[10.2347042,53.618609501],[10.2352309,53.619306801],[10.2357996,53.619939601],[10.2366314,53.620760501],[10.2374018,53.621412501],[10.2384263,53.622178801],[10.2473433,53.628208401],[10.2517985,53.631224101],[10.2553046,53.633592001],[10.2564414,53.634359601],[10.2579468,53.635371401],[10.2582422,53.635570701],[10.2586877,53.635864901],[10.2593374,53.636271201],[10.2598403,53.636564401],[10.2604842,53.636899901],[10.2610661,53.637189201],[10.2617413,53.637495001],[10.2628609,53.637962401],[10.2633011,53.638134301],[10.2640642,53.638400301],[10.2645779,53.638570001],[10.2651089,53.638735401],[10.2657755,53.638930901],[10.2693723,53.639922301],[10.2719233,53.640630601],[10.2737218,53.641129201],[10.2745352,53.641355001],[10.2753983,53.641604301],[10.2762499,53.641875301],[10.2772301,53.642222401],[10.2778367,53.642454101],[10.2784954,53.642729301],[10.2791064,53.643006101],[10.2798503,53.643364501],[10.2801363,53.643513001],[10.2806019,53.643754801],[10.2811845,53.644087801],[10.2817563,53.644432001],[10.2826854,53.645077001],[10.283581,53.645736201],[10.286411,53.647814501],[10.2882405,53.649184601],[10.2894964,53.650133601],[10.2913213,53.651483701],[10.2925884,53.652465001],[10.2936216,53.653310101],[10.2948312,53.654451601],[10.2960838,53.655860901],[10.297473,53.657837601],[10.2975949,53.658011101],[10.2995014,53.660723701],[10.3021272,53.664459401],[10.3052153,53.668852501],[10.3069114,53.671265101],[10.3092416,53.674579401],[10.310602,53.676514301],[10.3124045,53.679077901],[10.3141717,53.681591001],[10.3153922,53.683326601],[10.3170035,53.685617901],[10.3184266,53.687641401],[10.3206709,53.690832401],[10.3215192,53.692049101],[10.322176,53.692991301],[10.3233698,53.694703701],[10.3236765,53.695198301],[10.3243632,53.696279501],[10.3247055,53.696868001],[10.32506,53.697477301],[10.325066614,53.697488673]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.500Z"},{"id":"6a9a6f5f8cface7d44e389b9","source":"autobahn","sourceId":"2026-045335--vi-bs.2026-09-07_08-00-00-000.devi-zus.2026-09-07_08-00-00-000_010.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Bargteheide - Barsbüttel","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 17:00 Uhr\n15.09.26 von 09:00 bis 17:00 Uhr\n16.09.26 von 09:00 bis 17:00 Uhr\nA1: Lübeck -> Hamburg, zwischen 2.1 km hinter AK Bargteheide und 1.7 km vor AS Barsbüttel\nLänge: 14.75 km | Maximale Durchfahrtsbreite: 7.5 m\nA1 von Stapelfeld (AS) Bauwerksprüfungen","road":"A1","direction":"Lübeck -> Hamburg","locationText":"Barsbüttel - Bargteheide","lat":53.698014410665174,"lng":10.325099553934859,"geometry":{"type":"LineString","coordinates":[[10.325099554,53.698014411],[10.3248097,53.697517201],[10.3244675,53.696928301],[10.3240818,53.696283701],[10.3236275,53.695504501],[10.3231924,53.694843801],[10.3219341,53.693045301],[10.3212726,53.692099901],[10.3204704,53.690987101],[10.3193889,53.689417601],[10.3181887,53.687713201],[10.3167611,53.685686001],[10.3151529,53.683402101],[10.314863,53.682990401],[10.3139206,53.681652001],[10.3121545,53.679143601],[10.3104034,53.676656401],[10.3089194,53.674523801],[10.3067468,53.671432601],[10.3049483,53.668907201],[10.3034417,53.666722601],[10.3019101,53.664536101],[10.2992941,53.660815801],[10.2972448,53.657886001],[10.2965498,53.656896501],[10.2958212,53.655916001],[10.2952301,53.655223501],[10.2945986,53.654545001],[10.2940057,53.653967701],[10.2933885,53.653398101],[10.2923247,53.652553101],[10.2911002,53.651633901],[10.2880107,53.649306301],[10.2862669,53.647951001],[10.2834244,53.645822001],[10.2825115,53.645177201],[10.2815771,53.644546601],[10.2810183,53.644201201],[10.2804486,53.643871601],[10.2799522,53.643610801],[10.2791531,53.643217601],[10.2783347,53.642844401],[10.2777012,53.642579401],[10.2772476,53.642403801],[10.2767983,53.642234301],[10.2760368,53.641966501],[10.2752691,53.641724901],[10.2744774,53.641496901],[10.2737613,53.641297601],[10.2707137,53.640455501],[10.2689562,53.639965501],[10.2677917,53.639652301],[10.2673593,53.639530701],[10.2656856,53.639059801],[10.2648032,53.638803701],[10.2639332,53.638530201],[10.2631697,53.638261501],[10.2624707,53.637983001],[10.2615813,53.637612701],[10.2609093,53.637306101],[10.2603258,53.637014201],[10.2596427,53.636656701],[10.2591705,53.636380201],[10.2584773,53.635960801],[10.2580026,53.635644201],[10.2577428,53.635468201],[10.2550734,53.633662101],[10.254366,53.633183501],[10.2527748,53.632104401],[10.2502076,53.630368601],[10.2494933,53.629876301],[10.246246,53.627684201],[10.2443988,53.626458601],[10.2393073,53.622999501],[10.2382199,53.622263801],[10.2371894,53.621494301],[10.2364424,53.620841501],[10.2356342,53.620079001],[10.2350097,53.619373001],[10.2344647,53.618657301],[10.2341814,53.618228601],[10.2339211,53.617798601],[10.2336113,53.617213101],[10.2333619,53.616667101],[10.2331067,53.615988001],[10.2329522,53.615424501],[10.2324444,53.613714901],[10.232331,53.613290201],[10.2318768,53.611708701],[10.2308116,53.607999401],[10.2307382,53.607743501],[10.2300035,53.605185001],[10.2297812,53.604577201],[10.229523,53.603967801],[10.2292066,53.603302601],[10.2288249,53.602639201],[10.2285263,53.602135001],[10.2282022,53.601635401],[10.2277055,53.601000201],[10.2274501,53.600677801],[10.2271827,53.600369901],[10.2267104,53.599868601],[10.2262359,53.599370201],[10.2257034,53.598872801],[10.2251577,53.598388501],[10.2229782,53.596503101],[10.2228378,53.596383901],[10.2211123,53.594889001],[10.2134731,53.588277801],[10.2130606,53.587901501],[10.213000529,53.587851923]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.502Z"},{"id":"6a9c96218cface7d44e5d5f8","source":"autobahn","sourceId":"2026-005834--vi-bs.2026-09-21_00-00-00-000.devi-zus.2026-06-08_00-00-00-000_002.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Gremersdorf - Heiligenhafen-Ost","description":"Zeitraum dieser Bauphase:\nBeginn: 21.09.26 um 00:00 Uhr\nEnde: 28.09.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 10.10.26)\nA1: Lübeck -> Fehmarn, zwischen 0.7 km hinter AS Gremersdorf und 0.2 km vor AS Heiligenhafen-Ost\nLänge: 6.02 km | Maximale Durchfahrtsbreite: 3.25 m\nA1, AS Gremersdorf bis AS Heiligenhafen-Ost, B207, Instandsetzung der Deckschicht","road":"A1","direction":"Lübeck -> Fehmarn","locationText":"Heiligenhafen-Ost - Gremersdorf","lat":54.33692821157297,"lng":10.93846141560033,"geometry":{"type":"LineString","coordinates":[[10.938461416,54.336928212],[10.9389843,54.337444701],[10.9393983,54.337842301],[10.9399725,54.338417401],[10.9411016,54.339534401],[10.9415007,54.339929101],[10.9418038,54.340228901],[10.9426078,54.341025301],[10.9432216,54.341627301],[10.9434879,54.341883101],[10.9444324,54.342837901],[10.9451392,54.343532501],[10.9457518,54.344134901],[10.9474874,54.345834701],[10.9476833,54.346019501],[10.9488012,54.347151701],[10.9505402,54.348868301],[10.9521385,54.350442201],[10.9532086,54.351510601],[10.954345,54.352632101],[10.9555863,54.353845901],[10.956242,54.354499001],[10.9574032,54.355655001],[10.9586209,54.356859001],[10.958758,54.356996901],[10.9596395,54.357870501],[10.9598648,54.358095701],[10.9599928,54.358223601],[10.9602884,54.358501701],[10.9606134,54.358795901],[10.9609343,54.359086401],[10.9610045,54.359148901],[10.9613721,54.359473901],[10.961695,54.359751201],[10.9622198,54.360175501],[10.962462,54.360357801],[10.9626472,54.360481501],[10.9630765,54.360742901],[10.9632888,54.360873001],[10.9635,54.360991801],[10.963809,54.361164901],[10.9643416,54.361424601],[10.9647937,54.361637001],[10.9655105,54.361933201],[10.9659809,54.362105901],[10.9664593,54.362259301],[10.9669612,54.362405101],[10.967462,54.362530901],[10.9679978,54.362643301],[10.9684948,54.362732401],[10.9690378,54.362813901],[10.9696032,54.362888101],[10.9701737,54.362942801],[10.9707145,54.362984201],[10.9713061,54.363010801],[10.9720911,54.363040401],[10.9732632,54.363035801],[10.9747484,54.362984501],[10.9756306,54.362938501],[10.9766048,54.362875201],[10.9777012,54.362793001],[10.9779101,54.362776201],[10.9790065,54.362686301],[10.9793,54.362659701],[10.9819443,54.362431601],[10.9849542,54.362192701],[10.9852827,54.362166801],[10.9876401,54.362007101],[10.9889312,54.361926501],[10.9915456,54.361797201],[10.9932309,54.361711601],[10.9944291,54.361661901],[10.9957586,54.361614201],[10.9969218,54.361573001],[10.9976129,54.361557601],[10.9987597,54.361544401],[10.9993679,54.361547101],[10.9999338,54.361554101],[11.0005291,54.361565001],[11.0010142,54.361577301],[11.0015681,54.361602601],[11.0023265,54.361642601],[11.0027322,54.361669401],[11.0031989,54.361710701],[11.0039125,54.361778001],[11.0045369,54.361853801],[11.0050849,54.361926701],[11.0058552,54.362040301],[11.0061901,54.362097601],[11.006672696,54.362182989]]},"startTime":"2026-09-20T22:00:00.000Z","endTime":"2026-09-28T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.521Z"},{"id":"6a9d3a828cface7d44e630a9","source":"autobahn","sourceId":"2026-038221--vi-bs.2026-09-21_09-00-00-000.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Dortmund/Unna - Lichtendorf","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n21.09.26 von 09:00 bis 15:00 Uhr\nA1: Münster -> Köln, zwischen 6.6 km hinter AK Dortmund/Unna und 0.4 km vor Lichtendorf\nLänge: 0.55 km | Maximale Durchfahrtsbreite: 6 m\nA1 - Bauwerksarbeiten - AkD 38221","road":"A1","direction":"Münster -> Köln","locationText":"Lichtendorf - Dortmund/Unna","lat":51.47518530477521,"lng":7.6040050061662825,"geometry":{"type":"LineString","coordinates":[[7.604005006,51.475185305],[7.6038845,51.475058801],[7.6034068,51.474555101],[7.6029195,51.474030701],[7.6023792,51.473438701],[7.6017385,51.472795401],[7.6015638,51.472615601],[7.6012859,51.472346901],[7.6011375,51.472212301],[7.6005788,51.471709701],[7.5999855,51.471209501],[7.599747236,51.471024676]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.292Z"},{"id":"6a9daddc8cface7d44e68aa3","source":"autobahn","sourceId":"2026-044910--vi-bs.2026-09-21_19-00-00-000.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bakumer Wiesen - Langwege-West","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n21.09.26 19:00 bis zum 22.09.26 06:00 Uhr.\n22.09.26 19:00 bis zum 23.09.26 06:00 Uhr.\nA1: Bremen -> Osnabrück, zwischen 4.5 km hinter Bakumer Wiesen und 2.8 km vor Langwege-West\nLänge: 4.17 km | Maximale Durchfahrtsbreite: 3.25 m\nA1  - Fahrbahninstandhaltung - AkD 44910","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Langwege-West - Bakumer Wiesen","lat":52.67160635468142,"lng":8.16936041950305,"geometry":{"type":"LineString","coordinates":[[8.16936042,52.671606355],[8.1692015,52.671121901],[8.1687256,52.669784601],[8.1682232,52.668449601],[8.1679107,52.667629101],[8.1675734,52.666805401],[8.166949,52.665339401],[8.166308,52.663895001],[8.165708,52.662606001],[8.1654891,52.662155401],[8.1651418,52.661444101],[8.1650719,52.661308101],[8.1641959,52.659608801],[8.1635761,52.658444401],[8.1630255,52.657457101],[8.1626763,52.656840001],[8.16213,52.655890401],[8.1612894,52.654477401],[8.1604678,52.653140701],[8.1592248,52.651265701],[8.1580934,52.649483701],[8.1578512,52.649157501],[8.1570037,52.647919501],[8.1568347,52.647680901],[8.1544572,52.644492401],[8.1525231,52.641929601],[8.1495751,52.638259301],[8.148162467,52.636599192]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.450Z"},{"id":"6a9e50bd8cface7d44e6e6d7","source":"autobahn","sourceId":"2025-055308--vi-bs.2026-09-22_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de90","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Osnabrück-Nord","description":"Zeitraum dieser Bauphase:\nBeginn: 22.09.26 um 06:00 Uhr\nEnde: 24.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 24.09.26)\nA1: Bremen -> Osnabrück, zwischen 2.9 km hinter AS Bramsche und 3.1 km vor AS Osnabrück-Nord\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 7 m\nA1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Osnabrück-Nord - Bramsche","lat":52.3692887237778,"lng":8.042753284154797,"geometry":{"type":"LineString","coordinates":[[8.042753284,52.369288724],[8.0426558,52.368887701],[8.0425156,52.368362201],[8.04174,52.366258301],[8.041520345,52.365775834]]},"startTime":"2026-09-22T04:00:00.000Z","endTime":"2026-09-24T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.391Z"},{"id":"6a9e50bd8cface7d44e6e6d8","source":"autobahn","sourceId":"2025-055308--vi-bs.2026-09-22_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de88","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Wallenhorster Straße","description":"Zeitraum dieser Bauphase:\nBeginn: 22.09.26 um 06:00 Uhr\nEnde: 24.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 24.09.26)\nA1: Bremen -> Osnabrück, zwischen 2.5 km hinter AS Bramsche und Wallenhorster Straße\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 7 m\nA1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wallenhorster Straße - Bramsche","lat":52.37285207569615,"lng":8.043478096531734,"geometry":{"type":"LineString","coordinates":[[8.043478097,52.372852076],[8.0432265,52.371235301],[8.042753284,52.369288724]]},"startTime":"2026-09-22T04:00:00.000Z","endTime":"2026-09-24T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.393Z"},{"id":"6a9e50bd8cface7d44e6e6d9","source":"autobahn","sourceId":"2025-055308--vi-bs.2026-09-22_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de86","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Wallenhorster Straße","description":"Zeitraum dieser Bauphase:\nBeginn: 22.09.26 um 06:00 Uhr\nEnde: 24.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 24.09.26)\nA1: Bremen -> Osnabrück, zwischen 2.5 km hinter AS Bramsche und Wallenhorster Straße\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 7.25 m\nA1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wallenhorster Straße - Bramsche","lat":52.37285207569615,"lng":8.043478096531734,"geometry":{"type":"LineString","coordinates":[[8.043478097,52.372852076],[8.0432265,52.371235301],[8.042753284,52.369288724]]},"startTime":"2026-09-22T04:00:00.000Z","endTime":"2026-09-24T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.394Z"},{"id":"6a9e61118cface7d44e6f35a","source":"autobahn","sourceId":"2026-038223--vi-bs.2026-09-22_09-00-00-000.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Lichtendorf - Dortmund/Unna","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n22.09.26 von 09:00 bis 15:00 Uhr\nA1: Köln -> Münster, zwischen 0.1 km hinter Lichtendorf und 6.8 km vor AK Dortmund/Unna\nLänge: 0.7 km | Maximale Durchfahrtsbreite: 6 m\nA1 - Brückenwartung - AkD 38223","road":"A1","direction":"Köln -> Münster","locationText":"Dortmund/Unna - Lichtendorf","lat":51.469243467593124,"lng":7.597541227065045,"geometry":{"type":"LineString","coordinates":[[7.597541227,51.469243468],[7.5980563,51.469569801],[7.5984288,51.469822901],[7.5989563,51.470187301],[7.5998215,51.470828801],[7.600678,51.471523201],[7.6012739,51.472062701],[7.6014061,51.472188201],[7.6017069,51.472473701],[7.6019587,51.472717101],[7.6025975,51.473359501],[7.6032409,51.474060101],[7.603477089,51.474315735]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.285Z"},{"id":"6a9f91fe8cface7d44e7e654","source":"autobahn","sourceId":"2026-013716--vi-bs.2026-09-23_06-00-00-000.devi-zus.2026-08-31_20-00-00-000.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1, AK Maschen, Bauwerksarbeiten, BW432a","description":"Zeitraum dieser Bauphase:\nBeginn: 23.09.26 um 06:00 Uhr\nEnde: 04.11.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 04.11.26)\nAbfahrt von der A1: AD Horster Dreieck (aus Richtung Horster Dreieck/A7)\nLänge: 0.05 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.9 m\nA1, AK Maschen, Bauwerksarbeiten, BW432a","road":"A1","direction":"AD Horster Dreieck (aus Richtung Horster Dreieck/A7)","locationText":"","lat":53.38586677849083,"lng":10.020982325490255,"geometry":{"type":"LineString","coordinates":[[10.020982325,53.385866778],[10.0209905,53.386092101],[10.021019407,53.386306208]]},"startTime":"2026-09-23T04:00:00.000Z","endTime":"2026-11-04T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.570Z"},{"id":"6aa3c2c68cface7d44eb8829","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Ahlhorner Heide - Engelmannsbäke-Süd","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 09:00 bis 11:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 0.3 km hinter AS Ahlhorner Heide und 3.8 km vor Engelmannsbäke-Süd\nLänge: 0.27 km | Maximale Durchfahrtsbreite: 7.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Engelmannsbäke-Süd - Ahlhorner Heide","lat":52.857629656615345,"lng":8.231657058142732,"geometry":{"type":"LineString","coordinates":[[8.231657058,52.857629657],[8.2328442,52.858877901],[8.2332767,52.859313301],[8.23370452,52.859734811]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.461Z"},{"id":"6aa392748cface7d44eb5cac","source":"autobahn","sourceId":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Hochwald-West - Mehring","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 09:00 bis 18:00 Uhr\nA1: Saarbrücken -> Trier, zwischen 2.4 km hinter Hochwald-West und 4.7 km vor AS Mehring\nLänge: 3.91 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten","road":"A1","direction":"Saarbrücken -> Trier","locationText":"Mehring - Hochwald-West","lat":49.71290872518976,"lng":6.894022988905685,"geometry":{"type":"LineString","coordinates":[[6.894022989,49.712908725],[6.8940309,49.712957901],[6.8940698,49.713345501],[6.8940899,49.713731401],[6.8940845,49.714139901],[6.894055,49.714642801],[6.8940202,49.714978401],[6.8939652,49.715315701],[6.8938887,49.715666001],[6.8938016,49.716001601],[6.8936594,49.716450801],[6.8935226,49.716797601],[6.8933429,49.717221701],[6.8931739,49.717566801],[6.8929553,49.717956101],[6.8927059,49.718374001],[6.8924859,49.718703501],[6.8921279,49.719213401],[6.8917839,49.719678901],[6.8917018,49.719787801],[6.8916133,49.719909701],[6.8906668,49.721159401],[6.8901498,49.721880601],[6.8898674,49.722307701],[6.889555,49.722815701],[6.8893559,49.723200901],[6.8891949,49.723530501],[6.8891253,49.723688301],[6.8889941,49.724037801],[6.8888546,49.724461301],[6.8887728,49.724770001],[6.8887054,49.725130001],[6.888667,49.725429201],[6.8886378,49.725827901],[6.8886339,49.726177801],[6.8886511,49.726507501],[6.888691,49.726925101],[6.888711,49.727055801],[6.8887548,49.727341701],[6.8888495,49.727819601],[6.8889902,49.728465001],[6.888998,49.728502401],[6.8891272,49.729119501],[6.8891863,49.729420501],[6.8892911,49.729954901],[6.8893478,49.730289201],[6.8893897,49.730600401],[6.8894181,49.730886101],[6.8894559,49.731387401],[6.889464,49.731744401],[6.8894531,49.732041601],[6.8894233,49.732383801],[6.8893843,49.732694001],[6.8893092,49.733066201],[6.8892294,49.733387301],[6.8891547,49.733649001],[6.889009,49.734035601],[6.888879,49.734341001],[6.888766,49.734585101],[6.8885348,49.735002301],[6.8882689,49.735424901],[6.8880495,49.735732401],[6.8877239,49.736136601],[6.8875011,49.736387501],[6.8871972,49.736690801],[6.8868428,49.737032701],[6.8864674,49.737361401],[6.8860785,49.737667301],[6.8857495,49.737905401],[6.885404,49.738139201],[6.8850795,49.738348901],[6.8846117,49.738628501],[6.8840695,49.738928201],[6.8837225,49.739110201],[6.8833192,49.739319801],[6.883248,49.739354501],[6.8824919,49.739723101],[6.8813849,49.740259201],[6.8800852,49.740861501],[6.8791361,49.741333601],[6.8786892,49.741575101],[6.8777806,49.742086401],[6.8773786,49.742335801],[6.8769684,49.742600101],[6.8767285,49.742769601],[6.876318,49.743073601],[6.8760213,49.743302001],[6.8757208,49.743567801],[6.8754441,49.743823801],[6.875441583,49.743826113]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.196Z"},{"id":"6aa392748cface7d44eb5cae","source":"autobahn","sourceId":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Rioler Wald - Föhren","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 09:00 bis 18:00 Uhr\nA1: Saarbrücken -> Köln/Koblenz, zwischen 5.6 km hinter Rioler Wald und 3.2 km vor AS Föhren\nLänge: 3.48 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten","road":"A1","direction":"Saarbrücken -> Köln/Koblenz","locationText":"Föhren - Rioler Wald","lat":49.80716492544129,"lng":6.7587853184948194,"geometry":{"type":"LineString","coordinates":[[6.758785318,49.807164925],[6.7587148,49.807455101],[6.7584477,49.808493101],[6.7583458,49.808960901],[6.7582971,49.809221401],[6.7581126,49.810318701],[6.7579895,49.811412901],[6.7579354,49.812121101],[6.7579157,49.812747301],[6.7579058,49.813204401],[6.7578928,49.813697501],[6.7579436,49.815024201],[6.7579731,49.815412501],[6.7580128,49.815818101],[6.7581428,49.816956601],[6.7582548,49.817588801],[6.7583671,49.818207201],[6.7585613,49.819155301],[6.7587954,49.820446401],[6.7589135,49.821053401],[6.7593421,49.823281201],[6.759566,49.824430801],[6.7597506,49.825354401],[6.7599753,49.826528601],[6.760087,49.827053801],[6.7602161,49.827677501],[6.7603669,49.828306401],[6.7604746,49.828676601],[6.7606997,49.829275601],[6.760854,49.829631801],[6.7610904,49.830099001],[6.7613911,49.830632301],[6.7617352,49.831154001],[6.7619698,49.831483101],[6.7623304,49.831950901],[6.7626459,49.832313601],[6.7629634,49.832656201],[6.7632857,49.832977501],[6.7634519,49.833135601],[6.7636181,49.833293701],[6.7637444,49.833396001],[6.764052,49.833645401],[6.7650543,49.834421701],[6.7655746,49.834774201],[6.7658453,49.834968301],[6.7660185,49.835084701],[6.7667804,49.835573801],[6.7675219,49.836009801],[6.768427726,49.836534122]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.213Z"},{"id":"6aa39d548cface7d44eb6923","source":"autobahn","sourceId":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mehring - Hochwald-West","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 08:00 bis 10:00 Uhr\nA1: Trier -> Saarbrücken, zwischen 0.4 km hinter AS Mehring und 10.4 km vor Hochwald-West\nLänge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m\nA1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen","road":"A1","direction":"Trier -> Saarbrücken","locationText":"Hochwald-West - Mehring","lat":49.77701552501748,"lng":6.849563970307254,"geometry":{"type":"LineString","coordinates":[[6.84956397,49.777015525],[6.849702,49.776944501],[6.850111,49.776717501],[6.8505013,49.776487201],[6.8508553,49.776266301],[6.8512322,49.775996101],[6.851551536,49.775755274]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.206Z"},{"id":"6aa39d548cface7d44eb6924","source":"autobahn","sourceId":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mehring - Hochwald-West","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 12:00 bis 14:00 Uhr\nA1: Trier -> Saarbrücken, zwischen 8.1 km hinter AS Mehring und 2.7 km vor Hochwald-West\nLänge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.75 m\nA1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen","road":"A1","direction":"Trier -> Saarbrücken","locationText":"Hochwald-West - Mehring","lat":49.71732967526481,"lng":6.893107828526869,"geometry":{"type":"LineString","coordinates":[[6.893107829,49.717329675],[6.8931763,49.717189901],[6.8933547,49.716768901],[6.8934901,49.716425601],[6.8936308,49.715981101],[6.8937171,49.715648901],[6.89373226,49.71557943]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.208Z"},{"id":"6aa39d548cface7d44eb6925","source":"autobahn","sourceId":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mehring - Hochwald-West","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 13:00 Uhr\nA1: Trier -> Saarbrücken, zwischen 1.8 km hinter AS Mehring und 9.0 km vor Hochwald-West\nLänge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.6 m\nA1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen","road":"A1","direction":"Trier -> Saarbrücken","locationText":"Hochwald-West - Mehring","lat":49.76556124211042,"lng":6.85642505648062,"geometry":{"type":"LineString","coordinates":[[6.856425056,49.765561242],[6.8566369,49.765235901],[6.8568876,49.764872101],[6.8570928,49.764600901],[6.8573396,49.764286501],[6.857625821,49.763945442]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.210Z"},{"id":"6aa39d558cface7d44eb6926","source":"autobahn","sourceId":"2026-046498--vi-bs.2026-09-14_08-00-00-000.devi-bs.2026-09-14_08-00-00-000_010.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Moseltal - Schweich","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 13:00 bis 17:00 Uhr\nA1: Trier -> Köln/Koblenz, zwischen 2.4 km hinter AD Moseltal und 0.3 km vor AS Schweich\nLänge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.75 m\nA1 zwischen Schweich (AS) und Reinsfeld (AS) Arbeiten an Schutzeinrichtungen","road":"A1","direction":"Trier -> Köln/Koblenz","locationText":"Schweich - Moseltal","lat":49.831403899977495,"lng":6.761913341015864,"geometry":{"type":"LineString","coordinates":[[6.761913341,49.8314039],[6.7619698,49.831483101],[6.7623304,49.831950901],[6.7626459,49.832313601],[6.7629634,49.832656201],[6.763271166,49.832963012]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.221Z"},{"id":"6aa3a85c8cface7d44eb72de","source":"autobahn","sourceId":"2026-046537--vi-bs.2026-09-18_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Osnabrück-Nord - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n18.09.26 20:00 bis zum 19.09.26 05:00 Uhr.\nA1: Osnabrück -> Bremen, zwischen 2.3 km hinter AS Osnabrück-Nord und 1.5 km vor AS Bramsche\nLänge: 2.6 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Fahrbahninstandsetzung - AkD 46537","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Bramsche - Osnabrück-Nord","lat":52.35893894986097,"lng":8.03796250973876,"geometry":{"type":"LineString","coordinates":[[8.03796251,52.35893895],[8.0388316,52.360216501],[8.0394197,52.361150301],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.0418412,52.365941101],[8.0421676,52.366810901],[8.0427704,52.368469501],[8.0429335,52.368999801],[8.0431925,52.369946501],[8.0434603,52.371278801],[8.0438268,52.373425201],[8.0439801,52.375870001],[8.0438472,52.378065001],[8.0435047,52.380515501],[8.04321289,52.381811085]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.376Z"},{"id":"6aa3a85c8cface7d44eb72df","source":"autobahn","sourceId":"2026-046537--vi-bs.2026-09-16_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Wallenhorster Straße","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 20:00 bis zum 17.09.26 05:00 Uhr.\nA1: Bremen -> Osnabrück, zwischen 2.1 km hinter Bramsche und 1.7 km vor Wallenhorster Straße\nLänge: 1.99 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Fahrbahninstandsetzung - AkD 46537","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wallenhorster Straße - Bramsche","lat":52.40131121510004,"lng":8.035084509438882,"geometry":{"type":"LineString","coordinates":[[8.035084509,52.401311215],[8.0357571,52.399778201],[8.0364786,52.398230901],[8.036643,52.397878401],[8.03768,52.395691901],[8.0385941,52.393771401],[8.0387253,52.393476701],[8.0392371,52.392337201],[8.0404018,52.389744201],[8.0407351,52.388957401],[8.0415236,52.386987801],[8.042528957,52.384026487]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.405Z"},{"id":"6aa3a85c8cface7d44eb72e0","source":"autobahn","sourceId":"2026-046537--vi-bs.2026-09-15_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Wallenhorster Straße","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 20:00 bis zum 16.09.26 05:00 Uhr.\nA1: Bremen -> Osnabrück, zwischen 1.1 km hinter Bramsche und 2.8 km vor Wallenhorster Straße\nLänge: 1.9 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Fahrbahninstandsetzung - AkD 46537","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wallenhorster Straße - Bramsche","lat":52.41016968439139,"lng":8.031975857255178,"geometry":{"type":"LineString","coordinates":[[8.031975857,52.410169684],[8.0320557,52.409834501],[8.0321674,52.409399201],[8.0322801,52.408959301],[8.0324975,52.408190201],[8.0327752,52.407283701],[8.0332605,52.405826501],[8.0335119,52.405121101],[8.033633,52.404798401],[8.0338619,52.404188501],[8.0339311,52.404004201],[8.0341913,52.403375001],[8.0343924,52.402888601],[8.0357571,52.399778201],[8.0364786,52.398230901],[8.036643,52.397878401],[8.03768,52.395691901],[8.0385941,52.393771401],[8.038661255,52.393620559]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.407Z"},{"id":"6aa3a85c8cface7d44eb72e1","source":"autobahn","sourceId":"2026-046537--vi-bs.2026-09-14_20-00-00-000.devi-bs.2026-09-14_20-00-00-000_011.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 20:00 bis zum 15.09.26 05:00 Uhr.\nA1: Bremen -> Osnabrück, zwischen 1.1 km hinter Bramsche und AS Bramsche\nLänge: 1.74 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Fahrbahninstandsetzung - AkD 46537","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Bramsche","lat":52.41016968439139,"lng":8.031975857255178,"geometry":{"type":"LineString","coordinates":[[8.031975857,52.410169684],[8.0320557,52.409834501],[8.0321674,52.409399201],[8.0322801,52.408959301],[8.0324975,52.408190201],[8.0327752,52.407283701],[8.0332605,52.405826501],[8.0335119,52.405121101],[8.033633,52.404798401],[8.0338619,52.404188501],[8.0339311,52.404004201],[8.0341913,52.403375001],[8.0343924,52.402888601],[8.0357571,52.399778201],[8.0364786,52.398230901],[8.036643,52.397878401],[8.03768,52.395691901],[8.038023349,52.394970554]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.409Z"},{"id":"6aa3c2c68cface7d44eb8828","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Cloppenburg - Drantumer Mühle","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 07:00 bis 09:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 0.4 km hinter AS Cloppenburg und 1.2 km vor Drantumer Mühle\nLänge: 0.23 km | Maximale Durchfahrtsbreite: 7.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Drantumer Mühle - Cloppenburg","lat":52.816471227674306,"lng":8.2117566745376,"geometry":{"type":"LineString","coordinates":[[8.211756675,52.816471228],[8.2118741,52.816946201],[8.2121216,52.817904101],[8.212295907,52.818557465]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.458Z"},{"id":"6aa38d3a8cface7d44eb585f","source":"autobahn","sourceId":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Reinsfeld - Mehring","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 09:00 bis 18:00 Uhr\nA1: Saarbrücken -> Trier, zwischen 0.8 km hinter AS Reinsfeld und 8.6 km vor AS Mehring\nLänge: 4 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten","road":"A1","direction":"Saarbrücken -> Trier","locationText":"Mehring - Reinsfeld","lat":49.68170916887956,"lng":6.908614043141642,"geometry":{"type":"LineString","coordinates":[[6.908614043,49.681709169],[6.9079488,49.682285101],[6.9060101,49.684041501],[6.9051661,49.684781501],[6.9041094,49.685687701],[6.9040012,49.685780001],[6.9027511,49.686836701],[6.9011998,49.688094401],[6.9002271,49.688866801],[6.8992752,49.689605601],[6.898783,49.689983901],[6.8982906,49.690354101],[6.8972931,49.691100401],[6.8966138,49.691601501],[6.8959217,49.692096801],[6.8945393,49.693087901],[6.8940804,49.693419801],[6.8936003,49.693779901],[6.8932618,49.694039301],[6.8928492,49.694362401],[6.8924839,49.694656101],[6.8919763,49.695095001],[6.8915042,49.695536601],[6.8912172,49.695824601],[6.8909088,49.696155101],[6.8906647,49.696431801],[6.8903885,49.696794201],[6.8902332,49.697022601],[6.8900049,49.697330501],[6.8898882,49.697532601],[6.8897581,49.697761601],[6.8895503,49.698179801],[6.8894188,49.698492001],[6.8893035,49.698813001],[6.8891962,49.699156501],[6.8891157,49.699487801],[6.889038,49.699930201],[6.8890031,49.700281501],[6.8889856,49.700576501],[6.8889897,49.700971101],[6.8890178,49.701359701],[6.8890594,49.701691001],[6.8891238,49.702071801],[6.8892244,49.702499401],[6.8893665,49.702980801],[6.8895221,49.703408401],[6.8896588,49.703749401],[6.8898279,49.704155201],[6.8900451,49.704620101],[6.8902637,49.705048601],[6.8904957,49.705480501],[6.8907894,49.705996501],[6.8910687,49.706498601],[6.8911583,49.706649501],[6.8914198,49.707081501],[6.8917792,49.707668701],[6.8921319,49.708285301],[6.8924792,49.708888101],[6.8929312,49.709718001],[6.89319,49.710248801],[6.8933804,49.710688401],[6.8936058,49.711271201],[6.893756,49.711712601],[6.8938834,49.712174801],[6.8939638,49.712540801],[6.894022989,49.712908725]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.194Z"},{"id":"6aa3c2c68cface7d44eb882a","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de16","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Wildeshausen-West - Engelmannsbäke-Nord","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n18.09.26 von 05:00 bis 06:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 2.8 km hinter AS Wildeshausen-West und 0.6 km vor Engelmannsbäke-Nord\nLänge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Engelmannsbäke-Nord - Wildeshausen-West","lat":52.88704155668775,"lng":8.29753616572971,"geometry":{"type":"LineString","coordinates":[[8.297536166,52.887041557],[8.2964891,52.886898201],[8.294347,52.886643701],[8.2938996,52.886593082]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.465Z"},{"id":"6aa3c2c68cface7d44eb882b","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de14","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Wildeshausen - Wildeshausen-West","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n18.09.26 von 03:00 bis 04:30 Uhr\nA1: Bremen -> Osnabrück, zwischen 6.1 km hinter Wildeshausen und 0.1 km vor AS Wildeshausen-West\nLänge: 0.23 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wildeshausen-West - Wildeshausen","lat":52.90063493919617,"lng":8.338690551181664,"geometry":{"type":"LineString","coordinates":[[8.338690551,52.900634939],[8.3375996,52.900194101],[8.3359372,52.899497801],[8.33587794,52.899472048]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.467Z"},{"id":"6aa3c2c68cface7d44eb882c","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de8","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Wildeshausen-Nord - Delmetal-Süd","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 20:00 bis 22:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.4 km hinter AS Wildeshausen-Nord und 4.1 km vor Delmetal-Süd\nLänge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Delmetal-Süd - Wildeshausen-Nord","lat":52.9235346436171,"lng":8.485472225659725,"geometry":{"type":"LineString","coordinates":[[8.485472226,52.923534644],[8.4862705,52.923900501],[8.488374788,52.924941737]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.470Z"},{"id":"6aa3c2c68cface7d44eb882d","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de12","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Delmetal-Süd - Wildeshausen-Nord","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n18.09.26 von 00:30 bis 02:30 Uhr\nA1: Bremen -> Osnabrück, zwischen 6.1 km hinter Delmetal-Süd und 0.4 km vor AS Wildeshausen-Nord\nLänge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wildeshausen-Nord - Delmetal-Süd","lat":52.9169873910009,"lng":8.461901501417184,"geometry":{"type":"LineString","coordinates":[[8.461901501,52.916987391],[8.4610677,52.916851801],[8.4593432,52.916603001],[8.458276292,52.91646026]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.472Z"},{"id":"6aa3c2c68cface7d44eb882e","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de10","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Delmetal-Süd - Wildeshausen-Nord","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 22:30 bis 24:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 4.1 km hinter Delmetal-Süd und 2.5 km vor AS Wildeshausen-Nord\nLänge: 0.25 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Wildeshausen-Nord - Delmetal-Süd","lat":52.92517434323735,"lng":8.488553796722925,"geometry":{"type":"LineString","coordinates":[[8.488553797,52.925174343],[8.4884432,52.925113801],[8.4861687,52.923992901],[8.485658784,52.923757498]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.474Z"},{"id":"6aa3c2c68cface7d44eb882f","source":"autobahn","sourceId":"2026-046582--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-16_07-00-00-000_002.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mackenstedter Heide - Delmenhorst-Ost","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 11:30 bis 13:30 Uhr\nA1: Osnabrück -> Bremen, zwischen 0.7 km hinter Mackenstedter Heide und 1.4 km vor AS Delmenhorst-Ost\nLänge: 0.25 km | Maximale Durchfahrtsbreite: 7.5 m\nA1 Beseitigung Unfallfolgen- Schutzplankenrep.","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Delmenhorst-Ost - Mackenstedter Heide","lat":53.00078856483988,"lng":8.676848907280727,"geometry":{"type":"LineString","coordinates":[[8.676848907,53.000788565],[8.6775214,53.000970601],[8.6786018,53.001242701],[8.6797276,53.001526101],[8.680279626,53.001660259]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.478Z"},{"id":"6aa3c77a8cface7d44eb8cc8","source":"autobahn","sourceId":"2026-046604--vi-bs.2026-09-14_09-00-00-000_018.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neustadt i.H.-Mitte - Neustadt i.H.-Pelzerhaken","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 16:00 Uhr\n15.09.26 von 09:00 bis 16:00 Uhr\nA1: Lübeck -> Fehmarn, zwischen 0.9 km hinter AS Neustadt i.H.-Mitte und 4.4 km vor AS Neustadt i.H.-Pelzerhaken\nLänge: 0.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.5 m\nA1 zwischen Neustadt i.H.-Mitte (AS) und Neustadt i.H.-Pelzerhaken (AS) Leitungsarbeiten","road":"A1","direction":"Lübeck -> Fehmarn","locationText":"Neustadt i.H.-Pelzerhaken - Neustadt i.H.-Mitte","lat":54.10222953547594,"lng":10.78062315474663,"geometry":{"type":"LineString","coordinates":[[10.780623155,54.102229535],[10.7807108,54.102473901],[10.7810707,54.103604101],[10.7810907,54.103673701],[10.781185955,54.104007674]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.515Z"},{"id":"6aa3d8c78cface7d44eb9d1e","source":"autobahn","sourceId":"2023-001712--vi-fbm.2026-09-15_07-00-00-000.devi-zus.2017-11-15_09-00-00-000_005.de159","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Köln-Niehl - Leverkusen","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 09:00 bis 15:00 Uhr\n16.09.26 von 09:00 bis 15:00 Uhr\n19.09.26 von 16:00 bis 20:00 Uhr\nA1: Köln -> Dortmund, zwischen 1.3 km hinter AS Köln-Niehl und 0.6 km vor AK Leverkusen\nLänge: 3.33 km | Maximale Durchfahrtsbreite: 7 m\nRheinbrücke Leverkusen","road":"A1","direction":"Köln -> Dortmund","locationText":"Leverkusen - Köln-Niehl","lat":51.0318841489946,"lng":6.956066269993338,"geometry":{"type":"LineString","coordinates":[[6.95606627,51.031884149],[6.9626396,51.035540301],[6.9642841,51.036412301],[6.9649133,51.036749901],[6.9654008,51.036977201],[6.9658376,51.037159801],[6.9663209,51.037341501],[6.9669481,51.037559601],[6.9673115,51.037675101],[6.9676575,51.037762801],[6.9681215,51.037838701],[6.9685909,51.037887601],[6.9691032,51.037901101],[6.9695834,51.037902401],[6.9699776,51.037939901],[6.970455,51.038015401],[6.971536,51.038184101],[6.97281,51.038292401],[6.9740917,51.038359601],[6.9750449,51.038372901],[6.9756981,51.038357601],[6.9761647,51.038339101],[6.9766866,51.038305901],[6.9778807,51.038210301],[6.9785803,51.038136901],[6.9802119,51.037952401],[6.9826419,51.037688201],[6.9832354,51.037631101],[6.9840731,51.037556901],[6.9847174,51.037504601],[6.9853585,51.037475901],[6.986331,51.037454601],[6.987181,51.037450701],[6.9879281,51.037434301],[6.9885607,51.037433601],[6.9891932,51.037442601],[6.9898251,51.037461501],[6.9904561,51.037490101],[6.9910857,51.037528501],[6.9917137,51.037576701],[6.9923396,51.037634601],[6.9929631,51.037702201],[6.9935838,51.037779401],[6.9941112,51.037853001],[6.9946361,51.037933601],[6.9951582,51.038021001],[6.9956772,51.038115401],[6.9961929,51.038216601],[6.9967052,51.038324601],[6.9972136,51.038439401],[6.9977181,51.038560901],[6.9982185,51.038689001],[6.9987826,51.038838101],[6.9996504,51.039094401],[6.999688854,51.039106092]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.237Z"},{"id":"6aa3d8c78cface7d44eb9d1f","source":"autobahn","sourceId":"2026-046630--vi-bs.2026-09-14_20-00-00-000_016.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Westhofener Kreuz - Lennhof","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 20:00 bis zum 15.09.26 05:00 Uhr.\nA1: Dortmund -> Köln, zwischen 2.2 km hinter AK Westhofener Kreuz und 0.6 km vor Lennhof\nLänge: 0.5 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.5 m\nA1 - Markierungsarbeiten - AkD 46630","road":"A1","direction":"Dortmund -> Köln","locationText":"Lennhof - Westhofener Kreuz","lat":51.41832415949328,"lng":7.512210581101073,"geometry":{"type":"LineString","coordinates":[[7.512210581,51.418324159],[7.512175,51.418295201],[7.5111705,51.417531001],[7.5105794,51.417093201],[7.5098912,51.416614601],[7.5082307,51.415523301],[7.507379315,51.4150143]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.264Z"},{"id":"6aa3d8c78cface7d44eb9d20","source":"autobahn","sourceId":"2026-046622--vi-bs.2026-09-17_20-00-00-000_003.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Wallenhorster Straße - Osnabrück-Nord","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\nA1: Bremen -> Osnabrück, zwischen 0.1 km hinter Wallenhorster Straße und 2.9 km vor AS Osnabrück-Nord\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Fahrbahninstandsetzung - AkD 46622","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Osnabrück-Nord - Wallenhorster Straße","lat":52.36796718336731,"lng":8.042369971608863,"geometry":{"type":"LineString","coordinates":[[8.042369972,52.367967183],[8.04174,52.366258301],[8.040929025,52.364476958]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.387Z"},{"id":"6aa5d4388cface7d44ed3c10","source":"autobahn","sourceId":"2026-005834--vi-bs.2026-09-28_00-00-00-000.devi-zus.2026-06-08_00-00-00-000_002.de12","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Heiligenhafen-Ost - Gremersdorf","description":"Zeitraum dieser Bauphase:\nBeginn: 28.09.26 um 00:00 Uhr\nEnde: 05.10.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 10.10.26)\nA1: Fehmarn -> Lübeck, zwischen 0.1 km hinter AS Heiligenhafen-Ost und 0.7 km vor AS Gremersdorf\nLänge: 6.15 km | Maximale Durchfahrtsbreite: 3.25 m\nA1, AS Gremersdorf bis AS Heiligenhafen-Ost, B207, Instandsetzung der Deckschicht","road":"A1","direction":"Fehmarn -> Lübeck","locationText":"Gremersdorf - Heiligenhafen-Ost","lat":54.3626357107574,"lng":11.008498524156595,"geometry":{"type":"LineString","coordinates":[[11.008498524,54.362635711],[11.0083514,54.362611401],[11.0075236,54.362460301],[11.0067255,54.362299901],[11.0059649,54.362161101],[11.005415,54.362078001],[11.0049305,54.362006901],[11.0044964,54.361952501],[11.0040647,54.361900001],[11.0035504,54.361844901],[11.0030432,54.361798901],[11.0025603,54.361761701],[11.0019733,54.361728501],[11.0015763,54.361712201],[11.0010318,54.361682901],[11.0004972,54.361666901],[10.9998878,54.361657701],[10.9991553,54.361650501],[10.9987548,54.361657701],[10.997551,54.361664201],[10.9969786,54.361678101],[10.995806,54.361713901],[10.9944852,54.361764501],[10.9932719,54.361818301],[10.9923695,54.361860701],[10.9910614,54.361934001],[10.9901259,54.361981001],[10.9889745,54.362039801],[10.9878261,54.362106401],[10.9872174,54.362148201],[10.9863312,54.362209401],[10.9852282,54.362280501],[10.9849732,54.362298901],[10.9796924,54.362731301],[10.979559,54.362742901],[10.9778945,54.362885301],[10.9776828,54.362901201],[10.9774633,54.362920801],[10.97685,54.362966501],[10.9762929,54.363006601],[10.9757203,54.363046601],[10.9752035,54.363075801],[10.9746512,54.363100901],[10.9741267,54.363123101],[10.9735503,54.363137901],[10.9732607,54.363144501],[10.9727273,54.363150901],[10.9721625,54.363147401],[10.9716512,54.363137401],[10.9710913,54.363116201],[10.9705315,54.363082301],[10.9700127,54.363046201],[10.96951,54.362985801],[10.968934,54.362912601],[10.9684855,54.362840301],[10.9678991,54.362736001],[10.9673952,54.362624001],[10.9670692,54.362549501],[10.9667869,54.362476101],[10.9663678,54.362354201],[10.9659118,54.362206801],[10.9654306,54.362033501],[10.9650129,54.361868801],[10.9645733,54.361675001],[10.964149,54.361472501],[10.963746,54.361276501],[10.9633592,54.361059301],[10.9630884,54.360893701],[10.9627602,54.360689301],[10.962389,54.360443501],[10.9622357,54.360343701],[10.9619644,54.360143901],[10.9615884,54.359841501],[10.9614552,54.359736301],[10.9612337,54.359557201],[10.9608942,54.359263601],[10.960639,54.359029401],[10.9604397,54.358844601],[10.9601556,54.358569001],[10.9594019,54.357815001],[10.9586091,54.357039301],[10.9584808,54.356911601],[10.9572487,54.355693801],[10.9560767,54.354523201],[10.9542199,54.352698101],[10.9530701,54.351568401],[10.9523668,54.350870701],[10.9519728,54.350479901],[10.9503908,54.348918901],[10.9486223,54.347169701],[10.9475223,54.346067301],[10.9473344,54.345887701],[10.9456252,54.344212701],[10.9449641,54.343559201],[10.9447919,54.343395301],[10.9442575,54.342859601],[10.9430855,54.341692901],[10.9424146,54.341036501],[10.9416589,54.340285901],[10.9409861,54.339626301],[10.9398045,54.338457601],[10.9388438,54.337509901],[10.938358428,54.337026238]]},"startTime":"2026-09-27T22:00:00.000Z","endTime":"2026-10-05T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.523Z"},{"id":"6aa15c898cface7d44e974e6","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Neuenkirchen/Vörden","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 10:30 bis 12:30 Uhr\nA1: Osnabrück -> Bremen, zwischen 4.6 km hinter Bramsche und 4.1 km vor AS Neuenkirchen/Vörden\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Neuenkirchen/Vörden - Bramsche","lat":52.459993780882485,"lng":8.046598845241398,"geometry":{"type":"LineString","coordinates":[[8.046598845,52.459993781],[8.0468756,52.460400801],[8.04799979,52.462072068]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.402Z"},{"id":"6aa004008cface7d44e8476a","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de157","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)\nLänge: 0.21 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Dortmund/Unna)","locationText":"","lat":51.52190893619229,"lng":7.659413423443093,"geometry":{"type":"LineString","coordinates":[[7.659413423,51.521908936],[7.6594469,51.521894501],[7.6595906,51.521809401],[7.6596651,51.521724501],[7.6597201,51.521629701],[7.6597499,51.521515401],[7.6597279,51.521418701],[7.6596853,51.521321901],[7.6596227,51.521243801],[7.659553,51.521187501],[7.6594437,51.521123601],[7.6592894,51.521066301],[7.6591391,51.521033701],[7.6589708,51.521025601],[7.6587905,51.521034701],[7.6586346,51.521072801],[7.6584874,51.521123601],[7.6583768,51.521190201],[7.658299,51.521270201],[7.6582466,51.521370501],[7.658241851,51.521389529]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.585Z"},{"id":"6aa004008cface7d44e8476b","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de153","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der B1Abschnitt09Werl-DO\nLänge: 0.18 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.52118799943189,"lng":7.657037739894617,"geometry":{"type":"LineString","coordinates":[[7.65703774,51.521187999],[7.6568238,51.521123301],[7.6565265,51.521114801],[7.6562661,51.521165401],[7.6560755,51.521255901],[7.6559258,51.521376201],[7.6558384,51.521516201],[7.655827,51.521636101],[7.6558613,51.521767901],[7.6559557,51.521873501],[7.6560806,51.521961201],[7.65626,51.522041301],[7.656334475,51.5220575]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.587Z"},{"id":"6aa004008cface7d44e8476c","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de151","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)\nLänge: 0.23 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (aus Richtung Unna-Ost)","locationText":"","lat":51.52265863635305,"lng":7.656637595193168,"geometry":{"type":"LineString","coordinates":[[7.656637595,51.522658636],[7.6566291,51.522661201],[7.6565098,51.522715501],[7.6564116,51.522780601],[7.6563257,51.522851601],[7.6562306,51.522976501],[7.6561953,51.523200601],[7.6562706,51.523388701],[7.6563797,51.523495301],[7.6564952,51.523581501],[7.6566834,51.523660101],[7.6569292,51.523711501],[7.6571564,51.523728701],[7.6573565,51.523709501],[7.6575263,51.523670801],[7.6576853,51.523612901],[7.6578076,51.523532301],[7.65786755,51.523475531]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.588Z"},{"id":"6aa004008cface7d44e8476d","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de149","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nZufahrtsstraße B1Abschnitt09Werl-DO\nLänge: 0.26 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.524511703447295,"lng":7.658178051167977,"geometry":{"type":"LineString","coordinates":[[7.658178051,51.524511703],[7.6580854,51.524403201],[7.6578464,51.524241201],[7.6575034,51.524076201],[7.6571004,51.523942401],[7.6568238,51.523858201],[7.6565185,51.523755801],[7.6563249,51.523650701],[7.656175,51.523547201],[7.6560601,51.523422201],[7.6558954,51.523059801],[7.6557771,51.522870401],[7.655765926,51.522858306]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.590Z"},{"id":"6aa004008cface7d44e8476e","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de147","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nZufahrtsstraße B1Abschnitt09Werl-DO\nLänge: 0.08 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.5276312009855,"lng":7.657923962036867,"geometry":{"type":"LineString","coordinates":[[7.657923962,51.527631201],[7.6581479,51.527631201],[7.6584046,51.527594001],[7.6585595,51.527524301],[7.6587531,51.527409001],[7.658815902,51.52732032]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.592Z"},{"id":"6aa004008cface7d44e8476f","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de145","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)\nLänge: 0.1 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Kamen-Zentrum)","locationText":"","lat":51.528629318809365,"lng":7.659048306824232,"geometry":{"type":"LineString","coordinates":[[7.659048307,51.528629319],[7.65886,51.528429001],[7.6586489,51.528260801],[7.6584001,51.528113901],[7.6580902,51.527976401],[7.658043713,51.527959654]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.594Z"},{"id":"6aa014918cface7d44e8593c","source":"autobahn","sourceId":"2026-045911--vi-bs.2026-09-16_07-00-00-000.devi-zus.2026-09-14_07-00-00-000_002.de6","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Lüxem - Flussbach","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 07:00 bis 16:00 Uhr\nA1: Köln/Koblenz -> Trier, zwischen 3.4 km hinter Lüxem und 1.0 km vor Flussbach\nLänge: 0.9 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 von Mehren (AS) Fahrbahninstandsetzung","road":"A1","direction":"Köln/Koblenz -> Trier","locationText":"Flussbach - Lüxem","lat":50.00917179394379,"lng":6.933455725595512,"geometry":{"type":"LineString","coordinates":[[6.933455726,50.009171794],[6.9332412,50.008845401],[6.9328263,50.008197501],[6.9324565,50.007588901],[6.9319841,50.006758201],[6.9314886,50.005796301],[6.9311044,50.004991201],[6.9305729,50.003749301],[6.9305374,50.003656401],[6.929635865,50.001465923]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.226Z"},{"id":"6aa014918cface7d44e8593d","source":"autobahn","sourceId":"2026-045911--vi-bs.2026-09-15_07-00-00-000.devi-zus.2026-09-14_07-00-00-000_002.de4","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mehren - Udler","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 07:00 bis 16:00 Uhr\nA1: Köln/Koblenz -> Trier, zwischen 2.9 km hinter AS Mehren und 0.3 km vor Udler\nLänge: 0.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.75 m\nA1 von Mehren (AS) Fahrbahninstandsetzung","road":"A1","direction":"Köln/Koblenz -> Trier","locationText":"Udler - Mehren","lat":50.144336003801186,"lng":6.87414707187983,"geometry":{"type":"LineString","coordinates":[[6.874147072,50.144336004],[6.8740776,50.144267801],[6.8734677,50.143674201],[6.8730707,50.143302201],[6.8726579,50.142939501],[6.8724909,50.142799701],[6.8722815,50.142629401],[6.8719948,50.142404601],[6.8716574,50.142150901],[6.870869,50.141606401],[6.870712745,50.141510451]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.228Z"},{"id":"6aa014918cface7d44e8593e","source":"autobahn","sourceId":"2026-045911--vi-bs.2026-09-14_07-00-00-000.devi-zus.2026-09-14_07-00-00-000_002.de2","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Mehren - Udler","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 07:00 bis 16:00 Uhr\nA1: Köln/Koblenz -> Trier, zwischen 1.7 km hinter AS Mehren und 1.1 km vor Udler\nLänge: 0.75 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 von Mehren (AS) Fahrbahninstandsetzung","road":"A1","direction":"Köln/Koblenz -> Trier","locationText":"Udler - Mehren","lat":50.15371687280893,"lng":6.881983583409705,"geometry":{"type":"LineString","coordinates":[[6.881983583,50.153716873],[6.8819765,50.153677501],[6.8819041,50.153373001],[6.881801,50.152998701],[6.8816517,50.152613201],[6.8815006,50.152238601],[6.881426,50.152080501],[6.8812512,50.151751301],[6.8810626,50.151445601],[6.880849,50.151140001],[6.8806395,50.150845501],[6.8803784,50.150527501],[6.8800209,50.150124301],[6.8796558,50.149747701],[6.8782416,50.148355501],[6.8779993,50.148113401],[6.877582689,50.147705231]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.230Z"},{"id":"6aa014918cface7d44e8593f","source":"autobahn","sourceId":"2026-014896--vi-bs.2026-09-11_20-00-00-000.devi-zus.2026-03-27_21-00-00-000_003.de12","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Leverkusen - Wermelskirchen","description":"Zeitraum dieser Bauphase:\nBeginn: 11.09.26 um 20:00 Uhr\nEnde: 14.09.26 um 05:00 Uhr\n(Ende der Gesamtmaßnahme: 14.09.26)\nA1: Köln -> Dortmund, zwischen 9.6 km hinter AK Leverkusen und 5.6 km vor AS Wermelskirchen\nLänge: 2.7 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 Fahrbahninstandsetzung (AM Remscheid)","road":"A1","direction":"Köln -> Dortmund","locationText":"Wermelskirchen - Leverkusen","lat":51.08012038154936,"lng":7.128342539107613,"geometry":{"type":"LineString","coordinates":[[7.128342539,51.080120382],[7.1288184,51.080526401],[7.1291413,51.080827501],[7.1295191,51.081205001],[7.1299277,51.081636001],[7.1303928,51.082187601],[7.1308347,51.082758601],[7.1312254,51.083313901],[7.1314189,51.083585601],[7.1321553,51.084679501],[7.1332191,51.086222501],[7.1343284,51.087904701],[7.136064,51.090404501],[7.1371759,51.092022801],[7.1382263,51.093543901],[7.138938,51.094600601],[7.1397221,51.095748501],[7.1403884,51.096743701],[7.1406426,51.097146301],[7.1408369,51.097482001],[7.1409915,51.097746601],[7.1411499,51.098030101],[7.1413064,51.098366001],[7.141446,51.098689201],[7.1415681,51.099021001],[7.1416728,51.099375201],[7.1417282,51.099614201],[7.1417782,51.099825101],[7.1418345,51.100111601],[7.1418528,51.100446201],[7.1418681,51.100784801],[7.1418534,51.101349401],[7.1418074,51.102157401],[7.141765331,51.102645566]]},"startTime":"2026-09-11T18:00:00.000Z","endTime":"2026-09-14T05:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.244Z"},{"id":"6aa136a18cface7d44e94d58","source":"autobahn","sourceId":"2025-045882--vi-bs.2026-09-14_06-00-00-000.devi-zus.2025-11-23_00-00-00-000_001.de73","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Engelmannsbäke-Nord - Wildeshausen","description":"Zeitraum dieser Bauphase:\nBeginn: 14.09.26 um 06:00 Uhr\nEnde: 18.09.26 um 18:00 Uhr\n(Ende der Gesamtmaßnahme: 18.09.26)\nA1: Osnabrück -> Bremen, zwischen 3.2 km hinter Engelmannsbäke-Nord und 4.2 km vor Wildeshausen\nLänge: 2.72 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 Betonfeldsanierung zw. AD Stuhr und AS Gr. Ippener","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Wildeshausen - Engelmannsbäke-Nord","lat":52.896266253053945,"lng":8.329101921625426,"geometry":{"type":"LineString","coordinates":[[8.329101922,52.896266253],[8.3298086,52.896601601],[8.3308106,52.897075101],[8.3319042,52.897579001],[8.3328904,52.898030101],[8.3337605,52.898421601],[8.3350968,52.899001101],[8.3361671,52.899459901],[8.3377061,52.900094701],[8.3396019,52.900869201],[8.3408109,52.901339301],[8.3420058,52.901792601],[8.3454586,52.903060301],[8.347677,52.903822701],[8.3509046,52.904866401],[8.3539992,52.905819001],[8.3564805,52.906524301],[8.3589779,52.907219801],[8.3615749,52.907876601],[8.3637293,52.908414801],[8.36388315,52.90845]]},"startTime":"2026-09-14T04:00:00.000Z","endTime":"2026-09-18T18:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.463Z"},{"id":"6aa004008cface7d44e84769","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-09-17_20-00-00-000.devi-zus.2026-07-13_20-00-00-000.de159","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 17.09.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)\nLänge: 0.28 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (aus Richtung Unna-Ost)","locationText":"","lat":51.52243629833651,"lng":7.661983000399999,"geometry":{"type":"LineString","coordinates":[[7.661983,51.522436298],[7.6618388,51.522497501],[7.6616342,51.522637401],[7.6615188,51.522730901],[7.6613707,51.522865001],[7.6609424,51.523479701],[7.6607723,51.523625701],[7.6605871,51.523730201],[7.6603232,51.523829001],[7.660002,51.523892301],[7.6596458,51.523973301],[7.6594075,51.524075601],[7.659266823,51.524184878]]},"startTime":"2026-09-17T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.583Z"},{"id":"6aa15c898cface7d44e974e7","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 07:00 bis 10:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 0.2 km hinter Bramsche und 2.5 km vor AS Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Bramsche","lat":52.41869375563816,"lng":8.03093568527358,"geometry":{"type":"LineString","coordinates":[[8.030935685,52.418693756],[8.0309566,52.417907301],[8.0309677,52.417570001],[8.0309986,52.416912901],[8.031029334,52.416446866]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.403Z"},{"id":"6aa15c898cface7d44e974e8","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-16_11-30-00-000.devi-zus.2026-09-16_11-30-00-000.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neuenkirchen/Vörden - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 14:00 bis 16:30 Uhr\nA1: Bremen -> Osnabrück, zwischen 3.7 km hinter AS Neuenkirchen/Vörden und 5.0 km vor Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Neuenkirchen/Vörden","lat":52.465588699790906,"lng":8.05025910703976,"geometry":{"type":"LineString","coordinates":[[8.050259107,52.4655887],[8.048784941,52.463529534]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.416Z"},{"id":"6aa15c898cface7d44e974e9","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de11","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Dammer Berge - Fladderlohhausen","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 15:30 bis 17:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 3.2 km hinter Dammer Berge und 0.5 km vor Fladderlohhausen\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Fladderlohhausen - Dammer Berge","lat":52.56934176360487,"lng":8.111178329698784,"geometry":{"type":"LineString","coordinates":[[8.11117833,52.569341764],[8.110728502,52.57158143]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.421Z"},{"id":"6aa15c898cface7d44e974ea","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-17_07-00-00-000.devi-zus.2026-09-16_11-30-00-000.de9","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Dammer Berge - Fladderlohhausen","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 von 13:00 bis 15:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.2 km hinter Dammer Berge und 1.5 km vor Fladderlohhausen\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Fladderlohhausen - Dammer Berge","lat":52.55998306325471,"lng":8.113103087293359,"geometry":{"type":"LineString","coordinates":[[8.113103087,52.559983063],[8.1130786,52.560140201],[8.1129834,52.560613301],[8.1129413,52.560871301],[8.112675243,52.562208171]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.423Z"},{"id":"6aa15c898cface7d44e974eb","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-18_07-30-00-000.devi-zus.2026-09-16_11-30-00-000.de13","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Langwege-West - Lohne/Dinklage","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n18.09.26 von 07:30 bis 10:30 Uhr\nA1: Osnabrück -> Bremen, zwischen 1.1 km hinter Langwege-West und 4.0 km vor AS Lohne/Dinklage\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Lohne/Dinklage - Langwege-West","lat":52.622876764599084,"lng":8.135533562986952,"geometry":{"type":"LineString","coordinates":[[8.135533563,52.622876765],[8.1359003,52.623244301],[8.137449382,52.624798136]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.441Z"},{"id":"6aa15c898cface7d44e974ec","source":"autobahn","sourceId":"2026-046162--vi-bs.2026-09-16_11-30-00-000.devi-zus.2026-09-16_11-30-00-000.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Langwege-West - Lohne/Dinklage","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 11:30 bis 13:30 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.8 km hinter Langwege-West und 2.3 km vor AS Lohne/Dinklage\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8.5 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 46162","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Lohne/Dinklage - Langwege-West","lat":52.636146297959854,"lng":8.147993499812289,"geometry":{"type":"LineString","coordinates":[[8.1479935,52.636146298],[8.1495361,52.637958101],[8.149690537,52.638142989]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.443Z"},{"id":"6aa15c898cface7d44e974ed","source":"autobahn","sourceId":"2026-046175--vi-bs.2026-09-21_19-00-00-000_002.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Hollenstedt - Kalmoor","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\nJeden Montag, Dienstag, Mittwoch und Donnerstag zwischen dem 21.09.26 und dem 25.09.26 von 19:00 bis 00:00 Uhr.\nJeden Dienstag, Mittwoch, Donnerstag und Freitag zwischen dem 22.09.26 und dem 25.09.26 von 00:00 bis 05:00 Uhr.\nA1: Hamburg -> Bremen, zwischen 1.2 km hinter AS Hollenstedt und 2.2 km vor Kalmoor\nLänge: 5.99 km | Maximale Durchfahrtsbreite: 5.5 m\nA1 , Km 39,0-Km 45,0 RF HB, Sperrung HFS u.1. ÜFS für Deckenreparaturarbeiten als Wanderbaustelle","road":"A1","direction":"Hamburg -> Bremen","locationText":"Kalmoor - Hollenstedt","lat":53.35422512055768,"lng":9.694264571702874,"geometry":{"type":"LineString","coordinates":[[9.694264572,53.354225121],[9.6926487,53.353776201],[9.6910141,53.353322101],[9.6848518,53.351610201],[9.6808674,53.350503201],[9.6781119,53.349737701],[9.6764256,53.349269201],[9.6753451,53.348969001],[9.6694948,53.347343501],[9.6672807,53.346728301],[9.6669692,53.346641801],[9.6537088,53.342957301],[9.6502032,53.341983101],[9.6434784,53.340114401],[9.6400953,53.339174301],[9.6367539,53.338228601],[9.6342606,53.337529901],[9.6312682,53.336703901],[9.6310908,53.336654601],[9.6290755,53.336111801],[9.6265015,53.335396401],[9.6201752,53.333638201],[9.6129014,53.331616501],[9.612675007,53.331553045]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.485Z"},{"id":"6aa244208cface7d44ea3a33","source":"autobahn","sourceId":"2026-046260--vi-bs.2026-09-17_19-00-00-000_002.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bashake - Tecklenburger Land","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n17.09.26 19:00 bis zum 18.09.26 05:00 Uhr.\nA1: Münster -> Osnabrück, zwischen 1.0 km hinter Bashake und 0.5 km vor Tecklenburger Land\nLänge: 3 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 6.6 m\nA1 - Markierungsarbeiten - AkD 46260","road":"A1","direction":"Münster -> Osnabrück","locationText":"Tecklenburger Land - Bashake","lat":52.21074070687227,"lng":7.847166732950783,"geometry":{"type":"LineString","coordinates":[[7.847166733,52.210740707],[7.8472825,52.210759601],[7.8485149,52.210984101],[7.8494701,52.211159501],[7.850919,52.211457201],[7.8522737,52.211782801],[7.8533046,52.212053101],[7.8547892,52.212483101],[7.8558189,52.212796801],[7.8567307,52.213088501],[7.8585086,52.213730901],[7.8593944,52.214077401],[7.8602758,52.214432001],[7.8614664,52.214978401],[7.8620747,52.215270101],[7.8626565,52.215552401],[7.8631835,52.215818301],[7.8645995,52.216618501],[7.8656738,52.217248701],[7.867196,52.218222701],[7.8684005,52.219108301],[7.8697416,52.220161001],[7.8707129,52.221053301],[7.8714591,52.221757901],[7.872388,52.222719301],[7.8728142,52.223201701],[7.8732605,52.223747301],[7.8736688,52.224273601],[7.8740762,52.224802101],[7.8744721,52.225387701],[7.8749161,52.226048901],[7.8762141,52.228134101],[7.87683475,52.229047194]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.371Z"},{"id":"6aa2bf298cface7d44ea9ff6","source":"autobahn","sourceId":"2026-037949--vi-bs.2026-09-11_20-00-00-000.devi-zus.2026-08-14_20-00-00-000_001.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Wuppertal-Langerfeld - Klosterholz","description":"Zeitraum dieser Bauphase:\nBeginn: 11.09.26 um 20:00 Uhr\nEnde: 14.09.26 um 05:00 Uhr\n(Ende der Gesamtmaßnahme: 02.11.26)\nA1: Köln -> Dortmund, zwischen 2.3 km hinter AS Wuppertal-Langerfeld und 0.3 km vor Klosterholz\nLänge: 4.5 km | Maximale Durchfahrtsbreite: 6.5 m\nA1 - Vorarbeiten für den Ersatzneubau BW Gevelsberger Str. und BW Schwelmer Str. - AlD 37949","road":"A1","direction":"Köln -> Dortmund","locationText":"Klosterholz - Wuppertal-Langerfeld","lat":51.30314031589131,"lng":7.263021583133737,"geometry":{"type":"LineString","coordinates":[[7.263021583,51.303140316],[7.2631513,51.303890401],[7.2631899,51.304046801],[7.2633628,51.304739301],[7.2635829,51.305436001],[7.2638235,51.306049601],[7.2640616,51.306526001],[7.2644291,51.307168301],[7.2647818,51.307703001],[7.2652295,51.308271301],[7.2654521,51.308530001],[7.2661696,51.309283501],[7.2664319,51.309521501],[7.2667081,51.309772201],[7.2672848,51.310231701],[7.2677782,51.310597501],[7.2684209,51.311041301],[7.2693095,51.311597701],[7.2705089,51.312304301],[7.2721134,51.313206201],[7.2746359,51.314643401],[7.2765745,51.315730001],[7.2779499,51.316518001],[7.2782104,51.316660701],[7.2808842,51.318141001],[7.2817805,51.318610001],[7.2830765,51.319243901],[7.2836497,51.319514201],[7.2851798,51.320193901],[7.2868724,51.320876601],[7.2878165,51.321237601],[7.2891108,51.321702701],[7.2892994,51.321764501],[7.2913821,51.322445401],[7.292443,51.322751401],[7.2935183,51.323051701],[7.295211,51.323482101],[7.2966362,51.323816601],[7.2975287,51.324005501],[7.2988753,51.324280801],[7.2998665,51.324468701],[7.3007967,51.324627601],[7.3015064,51.324729201],[7.3033726,51.325011501],[7.3035732,51.325038201],[7.3053122,51.325306901],[7.3067101,51.325573701],[7.3076035,51.325763801],[7.3085281,51.325993901],[7.3095159,51.326279601],[7.3104364,51.326577501],[7.3110864,51.326806001],[7.311137135,51.326825156]]},"startTime":"2026-09-11T18:00:00.000Z","endTime":"2026-09-14T05:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.251Z"},{"id":"6aa38d3a8cface7d44eb585e","source":"autobahn","sourceId":"2026-046484--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_007.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Hermeskeil - Hochwald-Ost","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 18:00 Uhr\nA1: Saarbrücken -> Trier, zwischen AS Hermeskeil und 1.0 km vor Hochwald-Ost\nLänge: 2.97 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.25 m\nA1 von Hermeskeil (AS) nach Schweich (AS) Markierungsarbeiten","road":"A1","direction":"Saarbrücken -> Trier","locationText":"Hochwald-Ost - Hermeskeil","lat":49.658108570902485,"lng":6.922991372361914,"geometry":{"type":"LineString","coordinates":[[6.922991372,49.658108571],[6.9228556,49.658494201],[6.9226883,49.659105401],[6.9226042,49.659517801],[6.9225493,49.659831801],[6.9224814,49.660443201],[6.9224547,49.660958301],[6.9224751,49.661813501],[6.922501,49.662209101],[6.9225314,49.662499401],[6.9225657,49.662821501],[6.9225989,49.663085201],[6.9226376,49.663407701],[6.9227161,49.663966201],[6.9228997,49.665237901],[6.9229858,49.665964601],[6.9230243,49.667068901],[6.9230068,49.667390201],[6.9229186,49.668082901],[6.9227425,49.668798301],[6.9225178,49.669404001],[6.9222218,49.670013901],[6.9220546,49.670300701],[6.9216408,49.670911301],[6.9214139,49.671208601],[6.9209434,49.671742001],[6.9206284,49.672063801],[6.9202909,49.672381001],[6.9197714,49.672831601],[6.919469,49.673073601],[6.9192877,49.673218601],[6.9188342,49.673568101],[6.9183983,49.673896701],[6.9168974,49.675004601],[6.9163163,49.675435401],[6.915203,49.676284501],[6.9145909,49.676759401],[6.9144079,49.676905801],[6.9141664,49.677089401],[6.9119991,49.678829201],[6.9109215,49.679722101],[6.9098525,49.680623801],[6.9093329,49.681086801],[6.908614043,49.681709169]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.193Z"},{"id":"6a91d1d68cface7d44de9a92","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de130","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lennhof - Westhofener Kreuz","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Köln -> Dortmund, zwischen 1.6 km hinter Lennhof und 0.8 km vor AK Westhofener Kreuz\nLänge: 0.85 km | Maximale Durchfahrtsbreite: 8.7 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Köln -> Dortmund","locationText":"Westhofener Kreuz - Lennhof","lat":51.422153455948035,"lng":7.517196696489643,"geometry":{"type":"LineString","coordinates":[[7.517196696,51.422153456],[7.5177442,51.422599901],[7.5189228,51.423550401],[7.5194478,51.423944401],[7.5200009,51.424332601],[7.5206764,51.424742801],[7.5210379,51.424946401],[7.5213936,51.425133301],[7.5221184,51.425470101],[7.5225624,51.425659501],[7.5231492,51.425889001],[7.5237346,51.426101701],[7.5242819,51.426295501],[7.5251449,51.426593301],[7.5257139,51.426799201],[7.5262391,51.427005501],[7.526371575,51.427063137]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.253Z"},{"id":"6a856998989e2a5413f99b95","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de133","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)\nLänge: 0.22 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (aus Richtung Unna-Ost)","locationText":"","lat":51.52266864249473,"lng":7.656612750524089,"geometry":{"type":"LineString","coordinates":[[7.656612751,51.522668642],[7.6565098,51.522715501],[7.6564116,51.522780601],[7.6563257,51.522851601],[7.6562306,51.522976501],[7.6561953,51.523200601],[7.6562706,51.523388701],[7.6563797,51.523495301],[7.6564952,51.523581501],[7.6566834,51.523660101],[7.6569292,51.523711501],[7.6571564,51.523728701],[7.6573565,51.523709501],[7.6575263,51.523670801],[7.6576853,51.523612901],[7.6578076,51.523532301],[7.657851711,51.52349053]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.599Z"},{"id":"6a856998989e2a5413f99b96","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de131","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)\nLänge: 0.1 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Kamen-Zentrum)","locationText":"","lat":51.528629318809365,"lng":7.659048306824232,"geometry":{"type":"LineString","coordinates":[[7.659048307,51.528629319],[7.65886,51.528429001],[7.6586489,51.528260801],[7.6584001,51.528113901],[7.6580902,51.527976401],[7.658056175,51.527964144]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.601Z"},{"id":"6a856998989e2a5413f99b97","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de115","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nZufahrtsstraße B1Abschnitt09Werl-DO\nLänge: 0.32 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.52463063442813,"lng":7.658279607860961,"geometry":{"type":"LineString","coordinates":[[7.658279608,51.524630634],[7.6580854,51.524403201],[7.6578464,51.524241201],[7.6575034,51.524076201],[7.6571004,51.523942401],[7.6568238,51.523858201],[7.6565185,51.523755801],[7.6563249,51.523650701],[7.656175,51.523547201],[7.6560601,51.523422201],[7.6558954,51.523059801],[7.6557771,51.522870401],[7.6556521,51.522735101],[7.6554477,51.522639801],[7.655332445,51.522599272]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.603Z"},{"id":"6a856998989e2a5413f99b98","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de113","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nZufahrtsstraße B1Abschnitt09Werl-DO\nLänge: 0.3 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.526471328324014,"lng":7.655895591767716,"geometry":{"type":"LineString","coordinates":[[7.655895592,51.526471328],[7.6558411,51.526573901],[7.6558066,51.526684601],[7.6558277,51.526833801],[7.6558802,51.526933101],[7.6560169,51.527069301],[7.6562451,51.527220801],[7.6564641,51.527319801],[7.6567893,51.527438801],[7.6570977,51.527526101],[7.6574428,51.527589201],[7.6578692,51.527631201],[7.6581479,51.527631201],[7.6584046,51.527594001],[7.6585595,51.527524301],[7.6587531,51.527409001],[7.65881008,51.52732854]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.605Z"},{"id":"6a856998989e2a5413f99b99","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de109","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)\nLänge: 0.6 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Dortmund/Unna)","locationText":"","lat":51.52028602391985,"lng":7.657561507552269,"geometry":{"type":"LineString","coordinates":[[7.657561508,51.520286024],[7.6576086,51.520390901],[7.6582729,51.521997101],[7.6586281,51.522985501],[7.6590778,51.524865101],[7.659230946,51.525603953]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.607Z"},{"id":"6a856998989e2a5413f99b9a","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de107","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)\nLänge: 0.22 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Dortmund/Unna)","locationText":"","lat":51.521965127676644,"lng":7.659282205119793,"geometry":{"type":"LineString","coordinates":[[7.659282205,51.521965128],[7.6592841,51.521964701],[7.6594469,51.521894501],[7.6595906,51.521809401],[7.6596651,51.521724501],[7.6597201,51.521629701],[7.6597499,51.521515401],[7.6597279,51.521418701],[7.6596853,51.521321901],[7.6596227,51.521243801],[7.659553,51.521187501],[7.6594437,51.521123601],[7.6592894,51.521066301],[7.6591391,51.521033701],[7.6589708,51.521025601],[7.6587905,51.521034701],[7.6586346,51.521072801],[7.6584874,51.521123601],[7.6583768,51.521190201],[7.658299,51.521270201],[7.658249265,51.5213654]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.608Z"},{"id":"6a856998989e2a5413f99b9b","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de105","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der B1Abschnitt09Werl-DO\nLänge: 0.27 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.52344755950193,"lng":7.658938282755185,"geometry":{"type":"LineString","coordinates":[[7.658938283,51.52344756],[7.659018,51.523516201],[7.6591726,51.523607601],[7.659373,51.523682801],[7.6595189,51.523716201],[7.6597123,51.523744301],[7.6599196,51.523750101],[7.66011,51.523730801],[7.6602931,51.523692201],[7.6604384,51.523639601],[7.6606471,51.523525501],[7.6607839,51.523402801],[7.6608721,51.523263001],[7.6609099,51.523137501],[7.6609097,51.523022601],[7.6608698,51.522895301],[7.6607882,51.522767701],[7.6606509,51.522648701],[7.6605335,51.522573901],[7.6603688,51.522512601],[7.660323373,51.522498979]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.610Z"},{"id":"6a856998989e2a5413f99b9c","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de103","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)\nLänge: 0.16 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (aus Richtung Unna-Ost)","locationText":"","lat":51.527529391531615,"lng":7.659797206650032,"geometry":{"type":"LineString","coordinates":[[7.659797207,51.527529392],[7.659844,51.527604101],[7.6600033,51.527790801],[7.6601331,51.527914001],[7.6602954,51.528045601],[7.6605403,51.528199201],[7.6607721,51.528289901],[7.6610404,51.528351201],[7.6612807,51.528363601],[7.661424106,51.528345839]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.612Z"},{"id":"6a856998989e2a5413f99b9d","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de101","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A1: AS Unna (aus Richtung Dortmund/Unna)\nLänge: 0.24 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Dortmund/Unna)","locationText":"","lat":51.527686755377204,"lng":7.662480766791669,"geometry":{"type":"LineString","coordinates":[[7.662480767,51.527686755],[7.6623193,51.527920501],[7.6621435,51.528129701],[7.6619635,51.528255201],[7.6618172,51.528324601],[7.6616271,51.528386101],[7.6609004,51.528542101],[7.6606938,51.528614801],[7.6605377,51.528699401],[7.6604068,51.528821101],[7.6603288,51.528935501],[7.6602725,51.529090401],[7.660258302,51.529174835]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.614Z"},{"id":"6a856998989e2a5413f99b9e","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de99","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A44: AK Dortmund/Unna (aus Richtung Unna-Ost)\nLänge: 0.27 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (aus Richtung Unna-Ost)","locationText":"","lat":51.52248174068246,"lng":7.661875933051564,"geometry":{"type":"LineString","coordinates":[[7.661875933,51.522481741],[7.6618388,51.522497501],[7.6616342,51.522637401],[7.6615188,51.522730901],[7.6613707,51.522865001],[7.6609424,51.523479701],[7.6607723,51.523625701],[7.6605871,51.523730201],[7.6603232,51.523829001],[7.660002,51.523892301],[7.6596458,51.523973301],[7.6594075,51.524075601],[7.659275846,51.524177869]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.616Z"},{"id":"6a91d1d68cface7d44de9a91","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de98","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lennhof - Schwerte","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Köln -> Dortmund, zwischen 2.5 km hinter Lennhof und 2.8 km vor AS Schwerte\nLänge: 1.54 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.75 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Köln -> Dortmund","locationText":"Schwerte - Lennhof","lat":51.42706313686968,"lng":7.526371574958433,"geometry":{"type":"LineString","coordinates":[[7.526371575,51.427063137],[7.5266349,51.427177701],[7.5274863,51.427589401],[7.5280763,51.427906001],[7.5286344,51.428252301],[7.5291572,51.428603401],[7.5298408,51.429136801],[7.5301085,51.429364601],[7.5305409,51.429773701],[7.5308459,51.430091401],[7.5310242,51.430292301],[7.5312537,51.430574201],[7.5315416,51.430963801],[7.53177,51.431322801],[7.5319521,51.431637101],[7.5321431,51.432010601],[7.5322859,51.432301601],[7.5325047,51.432834701],[7.5329468,51.434058501],[7.5334926,51.435572901],[7.5341035,51.437268501],[7.5345557,51.438517101],[7.5348866,51.439429301],[7.534890554,51.439440614]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.257Z"},{"id":"6a856998989e2a5413f99b94","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de135","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der B1Abschnitt09Werl-DO\nLänge: 0.18 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.52118411722717,"lng":7.6570249024728145,"geometry":{"type":"LineString","coordinates":[[7.657024902,51.521184117],[7.6568238,51.521123301],[7.6565265,51.521114801],[7.6562661,51.521165401],[7.6560755,51.521255901],[7.6559258,51.521376201],[7.6558384,51.521516201],[7.655827,51.521636101],[7.6558613,51.521767901],[7.6559557,51.521873501],[7.6560806,51.521961201],[7.65626,51.522041301],[7.656307359,51.522051602]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.597Z"},{"id":"6a91d1d68cface7d44de9a93","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de122","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lennhof - Westhofener Kreuz","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Köln -> Dortmund, zwischen 1.2 km hinter Lennhof und 1.6 km vor AK Westhofener Kreuz\nLänge: 0.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Köln -> Dortmund","locationText":"Westhofener Kreuz - Lennhof","lat":51.41930879834791,"lng":7.513700513934048,"geometry":{"type":"LineString","coordinates":[[7.513700514,51.419308798],[7.5146331,51.420062901],[7.517196696,51.422153456]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.255Z"},{"id":"6a91d1d68cface7d44de9a94","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de120","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lennhof - Westhofener Kreuz","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Köln -> Dortmund, zwischen 0.6 km hinter Lennhof und 2.0 km vor AK Westhofener Kreuz\nLänge: 0.6 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Köln -> Dortmund","locationText":"Westhofener Kreuz - Lennhof","lat":51.41522723103798,"lng":7.508048620159812,"geometry":{"type":"LineString","coordinates":[[7.50804862,51.415227231],[7.5083858,51.415429601],[7.5100705,51.416539401],[7.5107445,51.417017801],[7.5114066,51.417494101],[7.5124012,51.418258101],[7.513700514,51.419308798]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.259Z"},{"id":"6a91d1d68cface7d44de9a95","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de132","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Westhofener Kreuz - Lennhof","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Dortmund -> Köln, zwischen 0.7 km hinter AK Westhofener Kreuz und 1.6 km vor Lennhof\nLänge: 0.85 km | Maximale Durchfahrtsbreite: 6.75 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Dortmund -> Köln","locationText":"Lennhof - Westhofener Kreuz","lat":51.42717750774363,"lng":7.526243828180401,"geometry":{"type":"LineString","coordinates":[[7.526243828,51.427177508],[7.5261404,51.427132201],[7.5256052,51.426920201],[7.5250604,51.426723201],[7.5241761,51.426419201],[7.523629,51.426224501],[7.5230882,51.426027701],[7.5224673,51.425784401],[7.5220164,51.425594601],[7.5212487,51.425238001],[7.5208898,51.425049201],[7.5205455,51.424857601],[7.5198485,51.424435501],[7.519293,51.424047101],[7.5187703,51.423656301],[7.5175772,51.422692101],[7.517019728,51.422238366]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.260Z"},{"id":"6a91d1d68cface7d44de9a96","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de124","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Westhofener Kreuz - Lennhof","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Dortmund -> Köln, zwischen 1.6 km hinter AK Westhofener Kreuz und 1.2 km vor Lennhof\nLänge: 0.4 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.75 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Dortmund -> Köln","locationText":"Lennhof - Westhofener Kreuz","lat":51.42223836605438,"lng":7.517019727815987,"geometry":{"type":"LineString","coordinates":[[7.517019728,51.422238366],[7.5144246,51.420126001],[7.513524596,51.41939357]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.262Z"},{"id":"6a91d1d68cface7d44de9a97","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de100","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Schwerte - Lennhof","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Dortmund -> Köln, zwischen 2.8 km hinter AS Schwerte und 2.5 km vor Lennhof\nLänge: 1.54 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Dortmund -> Köln","locationText":"Lennhof - Schwerte","lat":51.43947221539487,"lng":7.534662739298621,"geometry":{"type":"LineString","coordinates":[[7.534662739,51.439472215],[7.5343288,51.438546201],[7.5342333,51.438259101],[7.5322966,51.432906001],[7.5320745,51.432371101],[7.531932,51.432046401],[7.5317396,51.431674501],[7.5315585,51.431358301],[7.5313314,51.431017501],[7.5310449,51.430626501],[7.5308114,51.430345901],[7.5304039,51.429901801],[7.5301191,51.429622501],[7.5299272,51.429438301],[7.5296457,51.429205401],[7.5289686,51.428681101],[7.528477,51.428349401],[7.5279386,51.428021001],[7.5273535,51.427699501],[7.5265278,51.427301901],[7.526243828,51.427177508]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.268Z"},{"id":"6a91d1d68cface7d44de9a98","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de118","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Schwerte - Westhofener Kreuz","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nA1: Dortmund -> Köln, zwischen 2.1 km hinter AS Schwerte und 0.8 km vor AK Westhofener Kreuz\nLänge: 0.7 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 6.75 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"Dortmund -> Köln","locationText":"Westhofener Kreuz - Schwerte","lat":51.44560710889851,"lng":7.536926718624299,"geometry":{"type":"LineString","coordinates":[[7.536926719,51.445607109],[7.5367456,51.445189401],[7.5364609,51.444457601],[7.5357299,51.442430801],[7.5355416,51.441920501],[7.5349137,51.440169201],[7.5347235,51.439640701],[7.534662739,51.439472215]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.272Z"},{"id":"6a91d1d68cface7d44de9ac4","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de136","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAbfahrt von der A1: AK Westhofener Kreuz (aus Richtung Schwerte)\nLänge: 0.06 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Schwerte)","locationText":"","lat":51.43180409113053,"lng":7.53140775868195,"geometry":{"type":"LineString","coordinates":[[7.531407759,51.431804091],[7.5313314,51.431767201],[7.5311912,51.431730401],[7.5310521,51.431711601],[7.5309228,51.431706601],[7.5307939,51.431710101],[7.5305876,51.431734501],[7.530576091,51.431736796]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.536Z"},{"id":"6a91d1d68cface7d44de9ac5","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de134","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAbfahrt von der A45: AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)\nLänge: 0.04 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","locationText":"","lat":51.434164540289544,"lng":7.531724223218966,"geometry":{"type":"LineString","coordinates":[[7.531724223,51.43416454],[7.5317561,51.434159501],[7.5319349,51.434107701],[7.5320285,51.434059401],[7.5320987,51.434014701],[7.532140961,51.433982709]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.538Z"},{"id":"6a91d1d68cface7d44de9ac6","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de128","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAuffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Schwerte)\nLänge: 0.04 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Schwerte)","locationText":"","lat":51.42917702541557,"lng":7.529432794121831,"geometry":{"type":"LineString","coordinates":[[7.529432794,51.429177025],[7.5293616,51.429104001],[7.529121786,51.428845942]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.539Z"},{"id":"6a91d1d68cface7d44de9ac7","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de126","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAbfahrt von der A1: AK Westhofener Kreuz (aus Richtung Schwerte)\nLänge: 0.06 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Schwerte)","locationText":"","lat":51.43497206264831,"lng":7.532462017802579,"geometry":{"type":"LineString","coordinates":[[7.532462018,51.434972063],[7.5324097,51.434925601],[7.532262,51.434818701],[7.532094,51.434703301],[7.531926496,51.434609214]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.541Z"},{"id":"6a91d1d68cface7d44de9ac8","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de114","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAuffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)\nLänge: 0.08 km | Max. 40 km/h | Maximale Durchfahrtsbreite: 4.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof)","locationText":"","lat":51.43081011246132,"lng":7.533282141321935,"geometry":{"type":"LineString","coordinates":[[7.533282141,51.430810112],[7.532775,51.430988101],[7.5326056,51.431059001],[7.5324874,51.431124001],[7.5323902,51.431189101],[7.532363047,51.43121609]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.543Z"},{"id":"6a79f53bda24a2dabb861c28","source":"autobahn","sourceId":"2026-040751--vi-bs.2026-08-10_19-00-00-000_006.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Buchholzer Dreieck - Ostetal","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\nJeden Montag, Dienstag, Mittwoch und Donnerstag zwischen dem 10.08.26 und dem 02.10.26 von 19:00 bis 00:00 Uhr.\nJeden Montag, Dienstag, Mittwoch, Donnerstag und Freitag zwischen dem 11.08.26 und dem 02.10.26 von 00:00 bis 05:00 Uhr.\nA1: Hamburg -> Bremen, zwischen 3.3 km hinter AD Buchholzer Dreieck und 0.4 km vor Ostetal\nLänge: 19.71 km | Maximale Durchfahrtsbreite: 5.25 m\nFür Rissvergußarbeiten, Sperrung 1.u.2. ÜFS als Wanderbaustelle, zwischen Km 31,2 - 51,0 beide RF.","road":"A1","direction":"Hamburg -> Bremen","locationText":"Ostetal - Buchholzer Dreieck","lat":53.37126087314776,"lng":9.804786777748667,"geometry":{"type":"LineString","coordinates":[[9.804786778,53.371260873],[9.8026553,53.371194601],[9.8011105,53.371146501],[9.7972556,53.371026601],[9.7964175,53.371000601],[9.7942754,53.370933901],[9.7641648,53.369997301],[9.7579377,53.369794501],[9.7566836,53.369753601],[9.7545114,53.369678601],[9.753207,53.369598901],[9.7520745,53.369502501],[9.7507158,53.369344801],[9.749162,53.369122401],[9.7490222,53.369098101],[9.7478683,53.368901301],[9.7469524,53.368714501],[9.7466034,53.368637501],[9.7460354,53.368512901],[9.7453171,53.368337101],[9.7420489,53.367460001],[9.7389331,53.366590001],[9.7385793,53.366493301],[9.7353899,53.365621301],[9.735265,53.365586901],[9.7322759,53.364762801],[9.7248727,53.362713401],[9.7223235,53.361988601],[9.7221296,53.361933001],[9.7217403,53.361823901],[9.7186131,53.360973501],[9.7116578,53.359029901],[9.7090721,53.358312301],[9.7081121,53.358046001],[9.7068095,53.357684701],[9.7044568,53.357033001],[9.6954099,53.354543301],[9.6944578,53.354278801],[9.6926487,53.353776201],[9.6910141,53.353322101],[9.6848518,53.351610201],[9.6808674,53.350503201],[9.6781119,53.349737701],[9.6764256,53.349269201],[9.6753451,53.348969001],[9.6694948,53.347343501],[9.6672807,53.346728301],[9.6669692,53.346641801],[9.6537088,53.342957301],[9.6502032,53.341983101],[9.6434784,53.340114401],[9.6400953,53.339174301],[9.6367539,53.338228601],[9.6342606,53.337529901],[9.6312682,53.336703901],[9.6310908,53.336654601],[9.6290755,53.336111801],[9.6265015,53.335396401],[9.6201752,53.333638201],[9.6129014,53.331616501],[9.6046561,53.329305001],[9.6024393,53.328670101],[9.6009279,53.328201601],[9.5992574,53.327670701],[9.5975808,53.327094301],[9.5954794,53.326336101],[9.5935593,53.325595001],[9.5919503,53.324960201],[9.5889066,53.323658601],[9.5866417,53.322681801],[9.5827042,53.320982701],[9.5761559,53.318156901],[9.5744737,53.317430901],[9.5622498,53.312155301],[9.5518858,53.307681801],[9.550096,53.306909201],[9.5457392,53.305028501],[9.5399214,53.302517001],[9.5379658,53.301672701],[9.537919063,53.301652525]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.487Z"},{"id":"6a6bcb63aded52c38df04702","source":"autobahn","sourceId":"2026-034771--vi-bs.2026-08-15_00-00-00-000.devi-zus.2026-08-15_00-00-00-000.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A602 Arbeiten an Schutzeinrichtungen","description":"Zeitraum dieser Bauphase:\nBeginn: 15.08.26 um 00:00 Uhr\nEnde: 01.12.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 01.12.26)\nVon Auffahrt auf die A602: AD Moseltal (in Richtung Schweich) nach A602: Longuich -> Trier, zwischen AD Moseltal und 0.7 km vor AS Schweich\nLänge: 0.27 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA602 Arbeiten an Schutzeinrichtungen","road":"A1","direction":"AD Moseltal (in Richtung Schweich) nach A602","locationText":"","lat":49.812264651897564,"lng":6.757286524127881,"geometry":{"type":"LineString","coordinates":[[6.757286524,49.812264652],[6.7572559,49.812231001],[6.7571644,49.812144001],[6.757091,49.812090101],[6.7569947,49.812032801],[6.7569025,49.811991801],[6.7568345,49.811963001],[6.7567631,49.811938101],[6.7566796,49.811911601],[6.7565911,49.811888601],[6.7564945,49.811869501],[6.7564072,49.811858101],[6.7563014,49.811847901],[6.7562022,49.811844901],[6.7560773,49.811844201],[6.7559526,49.811854401],[6.7558334,49.811869601],[6.7556818,49.811900301],[6.7555291,49.811943301],[6.7553741,49.811999401],[6.7552594,49.812045801],[6.75513,49.812103201],[6.7549757,49.812176301],[6.754806,49.812219601],[6.7543602,49.812428601],[6.7541443,49.812514301],[6.753981328,49.812571137]]},"startTime":"2026-08-14T22:00:00.000Z","endTime":"2026-12-01T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.627Z"},{"id":"6a72e60aaded52c38d13227f","source":"autobahn","sourceId":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de71","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lichtendorf - Dortmund/Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 03.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 02.11.27)\nA1: Köln -> Münster, zwischen 6.1 km hinter Lichtendorf und 0.2 km vor AK Dortmund/Unna\nLänge: 1.2 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 6.1 m\nA1 - Ersatzneubau TB Liedbachtal - AlD 2834","road":"A1","direction":"Köln -> Münster","locationText":"Dortmund/Unna - Lichtendorf","lat":51.5097875598432,"lng":7.652391094260623,"geometry":{"type":"LineString","coordinates":[[7.652391094,51.50978756],[7.6533143,51.511717901],[7.6534855,51.512096701],[7.654352,51.513987601],[7.6556186,51.516605601],[7.6564619,51.518408701],[7.65715,51.519804401],[7.657294034,51.520115549]]},"startTime":"2026-08-03T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.277Z"},{"id":"6a72e60aaded52c38d132281","source":"autobahn","sourceId":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de69","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lichtendorf - Dortmund/Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 03.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 02.11.27)\nA1: Köln -> Münster, zwischen 5.4 km hinter Lichtendorf und 1.4 km vor AK Dortmund/Unna\nLänge: 0.75 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Ersatzneubau TB Liedbachtal - AlD 2834","road":"A1","direction":"Köln -> Münster","locationText":"Dortmund/Unna - Lichtendorf","lat":51.503755961757996,"lng":7.647698686659268,"geometry":{"type":"LineString","coordinates":[[7.647698687,51.503755962],[7.6481215,51.504093601],[7.6487583,51.504663701],[7.6494888,51.505422501],[7.6500717,51.506075301],[7.6504673,51.506563401],[7.6509764,51.507260101],[7.6512807,51.507713601],[7.6520465,51.509067001],[7.652391094,51.50978756]]},"startTime":"2026-08-03T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.281Z"},{"id":"6a72e60aaded52c38d132285","source":"autobahn","sourceId":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de73","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Dortmund/Unna - Lichtendorf","description":"Zeitraum dieser Bauphase:\nBeginn: 03.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 02.11.27)\nA1: Münster -> Köln, zwischen 0.2 km hinter AK Dortmund/Unna und 6.1 km vor Lichtendorf\nLänge: 1.2 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 6.1 m\nA1 - Ersatzneubau TB Liedbachtal - AlD 2834","road":"A1","direction":"Münster -> Köln","locationText":"Lichtendorf - Dortmund/Unna","lat":51.520152400910206,"lng":7.657091225707881,"geometry":{"type":"LineString","coordinates":[[7.657091226,51.520152401],[7.6569276,51.519805501],[7.6563094,51.518503501],[7.6554374,51.516639201],[7.6541855,51.514020701],[7.653588,51.512795701],[7.6532426,51.512083201],[7.6531403,51.511873501],[7.6530359,51.511659801],[7.652150531,51.509832657]]},"startTime":"2026-08-03T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.288Z"},{"id":"6a72e60baded52c38d132323","source":"autobahn","sourceId":"2023-002834--vi-bs.2026-08-03_20-00-00-000.devi-zus.2021-10-11_20-00-00-000.f_001.de75","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau TB Liedbachtal - AlD 2834","description":"Zeitraum dieser Bauphase:\nBeginn: 03.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\nDie Baustelle gilt nicht an folgenden Tagen:\n(Ende der Gesamtmaßnahme: 02.11.27)\nAbfahrt von der A44 O 1\nLänge: 0.11 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Ersatzneubau TB Liedbachtal - AlD 2834","road":"A1","direction":"","locationText":"","lat":51.52188597645663,"lng":7.654990681500012,"geometry":{"type":"LineString","coordinates":[[7.654990682,51.521885976],[7.6551359,51.521827901],[7.6553824,51.521681401],[7.6555478,51.521544401],[7.6558007,51.521283601],[7.6559728,51.521150201],[7.656046094,51.521113992]]},"startTime":"2026-08-03T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.525Z"},{"id":"6a731524aded52c38d1412ef","source":"autobahn","sourceId":"2026-039842--vi-fbm.2026-08-17_09-00-00-000.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Oldenburg i.H.-Nord - Oldenburg i.H.-Mitte","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n19.10.26 von 09:00 bis 15:00 Uhr\nA1: Fehmarn -> Lübeck, zwischen 0.7 km hinter AS Oldenburg i.H.-Nord und 0.3 km vor AS Oldenburg i.H.-Mitte\nLänge: 0.3 km | Maximale Durchfahrtsbreite: 7 m\nA1 von Oldenburg i.H.-Mitte Auf- und Abbau von Hinweistafeln","road":"A1","direction":"Fehmarn -> Lübeck","locationText":"Oldenburg i.H.-Mitte - Oldenburg i.H.-Nord","lat":54.29885180075875,"lng":10.8775599319541,"geometry":{"type":"LineString","coordinates":[[10.877559932,54.298851801],[10.8771506,54.298745001],[10.8766407,54.298596101],[10.8760976,54.298429501],[10.8752421,54.298107701],[10.8747998,54.297914401],[10.874246,54.297635501],[10.8737715,54.297384001],[10.8736806,54.297327685]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.517Z"},{"id":"6a738ed9aded52c38d1671d9","source":"autobahn","sourceId":"2023-004425--vi-bs.2026-08-20_20-00-00-000.devi-zus.2023-03-20_19-00-00-000_019.f.de47","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Hohe Heide - Davert","description":"Zeitraum dieser Bauphase:\nBeginn: 20.08.26 um 20:00 Uhr\nEnde: 20.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 07.12.26)\nA1: Dortmund -> Münster, zwischen 1.9 km hinter Hohe Heide und 1.1 km vor Davert\nLänge: 0.8 km | Maximale Durchfahrtsbreite: 5.85 m\nA1 - 6-streifige Ausbau zwischen Ascheberg und Hiltrup - AlD 4425","road":"A1","direction":"Dortmund -> Münster","locationText":"Davert - Hohe Heide","lat":51.826443112811155,"lng":7.604093823258132,"geometry":{"type":"LineString","coordinates":[[7.604093823,51.826443113],[7.596632422,51.831952365]]},"startTime":"2026-08-20T18:00:00.000Z","endTime":"2026-10-20T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.346Z"},{"id":"6a738ed9aded52c38d1671db","source":"autobahn","sourceId":"2023-004425--vi-bs.2026-08-20_20-00-00-000.devi-zus.2023-03-20_19-00-00-000_019.f.de49","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Hohe Heide - Münster-Hiltrup","description":"Zeitraum dieser Bauphase:\nBeginn: 20.08.26 um 20:00 Uhr\nEnde: 20.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 07.12.26)\nA1: Dortmund -> Münster, zwischen 2.7 km hinter Hohe Heide und 1.0 km vor AS Münster-Hiltrup\nLänge: 5.5 km | Maximale Durchfahrtsbreite: 5.85 m\nA1 - 6-streifige Ausbau zwischen Ascheberg und Hiltrup - AlD 4425","road":"A1","direction":"Dortmund -> Münster","locationText":"Münster-Hiltrup - Hohe Heide","lat":51.83195236543628,"lng":7.596632422305212,"geometry":{"type":"LineString","coordinates":[[7.596632422,51.831952365],[7.5963513,51.832159901],[7.5950638,51.833163501],[7.5947816,51.833381701],[7.5921947,51.835500401],[7.5907575,51.836792201],[7.5892257,51.838251901],[7.5874352,51.840139101],[7.5865048,51.841155401],[7.58564,51.842182301],[7.5848276,51.843176401],[7.5836109,51.844716601],[7.5834888,51.844896501],[7.5832234,51.845287501],[7.582132,51.846892801],[7.5808493,51.849087801],[7.5808271,51.849125801],[7.5796293,51.851426501],[7.5787448,51.853383101],[7.5784071,51.854182101],[7.5776504,51.856280501],[7.5772212,51.857740001],[7.5769721,51.858773301],[7.5766322,51.860453601],[7.5763992,51.861684701],[7.5763213,51.862311901],[7.5761921,51.863352701],[7.5760281,51.866129001],[7.576033,51.866646601],[7.576054,51.868883801],[7.5762018,51.871184701],[7.5762956,51.872645501],[7.5763709,51.874964401],[7.5763672,51.875214501],[7.5763684,51.875610001],[7.5763723,51.876360101],[7.576351,51.877691701],[7.576329118,51.878329689]]},"startTime":"2026-08-20T18:00:00.000Z","endTime":"2026-10-20T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.348Z"},{"id":"6a738ed9aded52c38d1671de","source":"autobahn","sourceId":"2023-004425--vi-bs.2026-08-20_20-00-00-000.devi-zus.2023-03-20_19-00-00-000_019.f.de45","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Münster-Süd - Hohe Heide","description":"Zeitraum dieser Bauphase:\nBeginn: 20.08.26 um 20:00 Uhr\nEnde: 20.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 07.12.26)\nA1: Münster -> Dortmund, zwischen 3.1 km hinter AK Münster-Süd und 2.5 km vor Hohe Heide\nLänge: 6.88 km | Maximale Durchfahrtsbreite: 7.25 m\nA1 - 6-streifige Ausbau zwischen Ascheberg und Hiltrup - AlD 4425","road":"A1","direction":"Münster -> Dortmund","locationText":"Hohe Heide - Münster-Süd","lat":51.88882498528408,"lng":7.574096209757649,"geometry":{"type":"LineString","coordinates":[[7.57409621,51.888824985],[7.5744998,51.887322601],[7.5749933,51.885462901],[7.5751752,51.884621101],[7.575304,51.884025501],[7.5754262,51.883460101],[7.5756958,51.881864501],[7.5758354,51.880981101],[7.5759192,51.880120801],[7.5759744,51.879483901],[7.5760337,51.878731401],[7.5760659,51.878253801],[7.5761786,51.876353901],[7.576192,51.875607501],[7.5761996,51.875203101],[7.576193,51.874952301],[7.5761838,51.874599801],[7.576123,51.872602801],[7.5760291,51.871190501],[7.5758728,51.868841201],[7.5758313,51.866651201],[7.575821,51.866107701],[7.5760367,51.863342001],[7.5761493,51.862309501],[7.576218,51.861679301],[7.5764423,51.860405601],[7.576753,51.858758801],[7.5770575,51.857723401],[7.5774865,51.856264501],[7.5782058,51.854155701],[7.5785491,51.853353101],[7.57942,51.851388901],[7.5806538,51.849111501],[7.5806876,51.849053001],[7.581953,51.846864201],[7.5833307,51.844857801],[7.5836969,51.844324401],[7.5848155,51.842918501],[7.5858209,51.841684101],[7.5863597,51.841081701],[7.5871726,51.840137501],[7.588486,51.838767601],[7.5889773,51.838275701],[7.5899778,51.837311201],[7.5906677,51.836620601],[7.5921049,51.835328901],[7.5945733,51.833357801],[7.5948354,51.833147501],[7.5962614,51.832003401],[7.598317859,51.830492877]]},"startTime":"2026-08-20T18:00:00.000Z","endTime":"2026-10-20T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.350Z"},{"id":"6a75c614851c1ca2121c32a9","source":"autobahn","sourceId":"2023-000357--vi-bs.2026-08-10_11-00-00-000.devi-zus.2024-10-01_00-00-00-000.f.de13","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Saarbrücken - Eppelborn","description":"Zeitraum dieser Bauphase:\nBeginn: 10.08.26 um 11:00 Uhr\nEnde: 10.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 10.10.26)\nA1: Saarbrücken -> Trier, zwischen 3.6 km hinter AK Saarbrücken und 0.3 km vor AS Eppelborn\nLänge: 4.87 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 Arbeiten an Schutzeinrichtungen A.05226.00","road":"A1","direction":"Saarbrücken -> Trier","locationText":"Eppelborn - Saarbrücken","lat":49.38191589297737,"lng":7.002339290843191,"geometry":{"type":"LineString","coordinates":[[7.002339291,49.381915893],[7.0025404,49.382234101],[7.0030646,49.383050301],[7.003294,49.383371301],[7.0036121,49.383786701],[7.0037842,49.384000601],[7.0041484,49.384432301],[7.0045984,49.384932201],[7.0050084,49.385358401],[7.0054214,49.385766301],[7.0066339,49.386977101],[7.0095378,49.389819301],[7.0098713,49.390177201],[7.0101051,49.390452501],[7.0103586,49.390770701],[7.0105626,49.391069301],[7.0107519,49.391389101],[7.0109066,49.391698401],[7.0110172,49.392001701],[7.0110786,49.392261701],[7.0111409,49.392570001],[7.0111539,49.393002201],[7.0111375,49.393360101],[7.0110737,49.393658101],[7.0109901,49.393934501],[7.010856,49.394260501],[7.0106656,49.394625401],[7.0104868,49.394910701],[7.01025,49.395231001],[7.0099274,49.395656401],[7.0095334,49.396160601],[7.0091473,49.396660101],[7.0088513,49.397115101],[7.0086603,49.397483901],[7.0085308,49.397798901],[7.0084038,49.398155901],[7.0083249,49.398478401],[7.0082782,49.398749201],[7.0082528,49.399073801],[7.0082528,49.399428801],[7.0082761,49.399746401],[7.0083164,49.400006101],[7.0083737,49.400285101],[7.0084756,49.400616601],[7.0086305,49.401002001],[7.0087897,49.401318301],[7.0089744,49.401629001],[7.0092121,49.401952201],[7.0094838,49.402278201],[7.00973,49.402547501],[7.0100101,49.402836201],[7.0104028,49.403210501],[7.0109949,49.403785001],[7.0113195,49.404118001],[7.011602,49.404434201],[7.0118248,49.404720001],[7.0120074,49.404997601],[7.0121326,49.405215901],[7.0122536,49.405464501],[7.0123342,49.405673001],[7.0124043,49.405910501],[7.0124701,49.406266901],[7.0125019,49.406686701],[7.012487,49.407022301],[7.0124191,49.407435201],[7.0123661,49.407657601],[7.0123024,49.407862001],[7.0122281,49.408066301],[7.0121496,49.408252801],[7.0120307,49.408524801],[7.0118885,49.408805201],[7.0116954,49.409138001],[7.0114789,49.409476301],[7.011094,49.410037601],[7.0107767,49.410461801],[7.0104204,49.410878601],[7.010123,49.411201101],[7.0096745,49.411645001],[7.0092669,49.412008801],[7.008871,49.412311101],[7.0085301,49.412534301],[7.0081396,49.412757501],[7.0076304,49.413016501],[7.0071724,49.413206101],[7.006707,49.413369101],[7.0062203,49.413510801],[7.0055318,49.413657501],[7.0050498,49.413734201],[7.0045442,49.413785401],[7.0039712,49.413820601],[7.0034307,49.413821301],[7.0028343,49.413791801],[7.0023385,49.413737901],[7.0018681,49.413672301],[7.0012617,49.413567801],[7.0000839,49.413305301],[6.9987554,49.413010501],[6.9979583,49.412861901],[6.9971447,49.412719501],[6.9965622,49.412641901],[6.9960326,49.412589801],[6.9954422,49.412557501],[6.9948881,49.412549201],[6.9941228,49.412565501],[6.993871225,49.412584984]]},"startTime":"2026-08-10T09:00:00.000Z","endTime":"2026-10-10T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.180Z"},{"id":"6a75c614851c1ca2121c32ad","source":"autobahn","sourceId":"2023-000357--vi-bs.2026-08-10_11-00-00-000.devi-zus.2024-10-01_00-00-00-000.f.de15","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Eppelborn - Saarbrücken","description":"Zeitraum dieser Bauphase:\nBeginn: 10.08.26 um 11:00 Uhr\nEnde: 10.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 10.10.26)\nA1: Trier -> Saarbrücken, zwischen 0.3 km hinter AS Eppelborn und 3.6 km vor AK Saarbrücken\nLänge: 4.87 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 Arbeiten an Schutzeinrichtungen A.05226.00","road":"A1","direction":"Trier -> Saarbrücken","locationText":"Saarbrücken - Eppelborn","lat":49.41249614631151,"lng":6.993855073238342,"geometry":{"type":"LineString","coordinates":[[6.993855073,49.412496146],[6.994109,49.412476501],[6.9948811,49.412454001],[6.9954639,49.412468201],[6.9960553,49.412496101],[6.9966026,49.412552701],[6.9972116,49.412634301],[6.9980136,49.412763401],[6.9988315,49.412923501],[7.0001733,49.413227801],[7.0013273,49.413479601],[7.0019244,49.413582301],[7.0023727,49.413648901],[7.0028581,49.413700901],[7.0034204,49.413724701],[7.0039541,49.413724701],[7.004517,49.413697001],[7.0050339,49.413638401],[7.0055034,49.413566001],[7.0061426,49.413429801],[7.0066252,49.413286601],[7.0071117,49.413115101],[7.007538,49.412939401],[7.0080449,49.412685401],[7.0084372,49.412464801],[7.0087646,49.412238401],[7.0091489,49.411950201],[7.0095525,49.411589201],[7.0100055,49.411134901],[7.0102843,49.410833001],[7.010646,49.410419701],[7.0109666,49.409986001],[7.0113469,49.409446801],[7.0115553,49.409107601],[7.0117426,49.408774001],[7.0118897,49.408486401],[7.0120169,49.408214301],[7.0120859,49.408035301],[7.0121667,49.407826801],[7.0122166,49.407632201],[7.0122718,49.407422601],[7.0123381,49.407001301],[7.0123462,49.406656001],[7.0123144,49.406264101],[7.012256,49.405917101],[7.0121833,49.405670301],[7.0121044,49.405480501],[7.0119825,49.405226701],[7.0118544,49.405014701],[7.0116674,49.404741701],[7.011451,49.404463801],[7.011183,49.404165901],[7.0108473,49.403812401],[7.010282,49.403269201],[7.0098867,49.402880501],[7.0096136,49.402604301],[7.0093633,49.402335101],[7.0090939,49.402004501],[7.0088598,49.401673001],[7.0086717,49.401355901],[7.0084991,49.401032101],[7.0083504,49.400669901],[7.0082341,49.400292401],[7.0081723,49.400020301],[7.008131,49.399760701],[7.0081045,49.399438801],[7.0081075,49.399075601],[7.0081399,49.398748001],[7.0081915,49.398463901],[7.0082709,49.398141501],[7.0083872,49.397796501],[7.0085359,49.397462801],[7.0087375,49.397086201],[7.0090299,49.396628501],[7.0094093,49.396120901],[7.0098126,49.395613201],[7.0101362,49.395191901],[7.0103665,49.394863901],[7.0105396,49.394595701],[7.0107405,49.394218401],[7.0108667,49.393901201],[7.0109447,49.393630601],[7.0109987,49.393335401],[7.0110223,49.392991601],[7.0110008,49.392562101],[7.0109448,49.392261701],[7.0108651,49.391983901],[7.0107671,49.391717801],[7.0106214,49.391408801],[7.0104332,49.391099501],[7.0102101,49.390788701],[7.0099768,49.390493501],[7.0097544,49.390233001],[7.009412,49.389869901],[7.0065228,49.387030801],[7.0053047,49.385825301],[7.0048922,49.385408501],[7.0044917,49.384982501],[7.0040282,49.384467601],[7.0036704,49.384038001],[7.0034773,49.383789401],[7.0031864,49.383405101],[7.0029557,49.383084601],[7.0024827,49.382386101],[7.0023942,49.382236701],[7.0022823,49.382047801],[7.002222137,49.381946964]]},"startTime":"2026-08-10T09:00:00.000Z","endTime":"2026-10-10T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.189Z"},{"id":"6a9866818cface7d44e2414e","source":"autobahn","sourceId":"2025-055308--vi-bs.2026-09-15_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de80","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Osnabrück-Nord - Wallenhorster Straße","description":"Zeitraum dieser Bauphase:\nBeginn: 15.09.26 um 06:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 24.09.26)\nA1: Osnabrück -> Bremen, zwischen 2.7 km hinter AS Osnabrück-Nord und 0.4 km vor Wallenhorster Straße\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 7.25 m\nA1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Wallenhorster Straße - Osnabrück-Nord","lat":52.3622960525851,"lng":8.04007625391459,"geometry":{"type":"LineString","coordinates":[[8.040076254,52.362296053],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.041756417,52.365745765]]},"startTime":"2026-09-15T04:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.384Z"},{"id":"6a82cb90989e2a5413f82bda","source":"autobahn","sourceId":"2025-058131--vi-bs.2026-06-22_09-00-00-000.de0","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Sittensen - Kalmoor","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 09:00 bis zum 15.10.26 24:00 Uhr.\n16.10.26 von 00:00 bis 18:00 Uhr\nA1: Bremen -> Hamburg, zwischen 1.7 km hinter AS Sittensen und 3.9 km vor Kalmoor\nLänge: 0.44 km | Maximale Durchfahrtsbreite: 10 m\nA1 Ostetal (Raststaette) RF HH Arbeiten an Parkplätzen","road":"A1","direction":"Bremen -> Hamburg","locationText":"Kalmoor - Sittensen","lat":53.29844740708683,"lng":9.530936519393629,"geometry":{"type":"LineString","coordinates":[[9.530936519,53.298447407],[9.536293812,53.300758791]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.483Z"},{"id":"6a856998989e2a5413f99b85","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de97","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Lichtendorf - Kamen-Zentrum","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Köln -> Münster, zwischen 7.3 km hinter Lichtendorf und 5.4 km vor AS Kamen-Zentrum\nLänge: 0.89 km | Maximale Durchfahrtsbreite: 7 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Köln -> Münster","locationText":"Kamen-Zentrum - Lichtendorf","lat":51.52011554894408,"lng":7.6572940343554805,"geometry":{"type":"LineString","coordinates":[[7.657294034,51.520115549],[7.6575551,51.520679501],[7.6579126,51.521477201],[7.658036,51.521790201],[7.6583571,51.522687401],[7.6585048,51.523145201],[7.6586696,51.523795401],[7.659594785,51.528021224]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.283Z"},{"id":"6a856998989e2a5413f99b86","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de129","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Unna - Kamen-Zentrum","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Dortmund -> Münster, zwischen 1.1 km hinter AS Unna und 3.8 km vor AS Kamen-Zentrum\nLänge: 0.65 km | Maximale Durchfahrtsbreite: 10.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Dortmund -> Münster","locationText":"Kamen-Zentrum - Unna","lat":51.53601311174806,"lng":7.661330731780595,"geometry":{"type":"LineString","coordinates":[[7.661330732,51.536013112],[7.6613998,51.536336501],[7.6617604,51.537943301],[7.6618199,51.538205101],[7.6623505,51.540680901],[7.6624322,51.541044101],[7.662594102,51.54181296]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.295Z"},{"id":"6a856998989e2a5413f99b87","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de111","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Unna - Kamen-Zentrum","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Dortmund -> Münster, zwischen 0.2 km hinter AS Unna und 4.5 km vor AS Kamen-Zentrum\nLänge: 0.9 km | Maximale Durchfahrtsbreite: 10.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Dortmund -> Münster","locationText":"Kamen-Zentrum - Unna","lat":51.528021224289745,"lng":7.659594784598197,"geometry":{"type":"LineString","coordinates":[[7.659594785,51.528021224],[7.6596232,51.528151001],[7.6599689,51.529711001],[7.6604344,51.531820701],[7.6608321,51.533678301],[7.661330732,51.536013112]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.297Z"},{"id":"6a856998989e2a5413f99b88","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de127","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Kamen-Zentrum - Lichtendorf","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Köln, zwischen 4.6 km hinter AS Kamen-Zentrum und 7.3 km vor Lichtendorf\nLänge: 1.64 km | Maximale Durchfahrtsbreite: 6.1 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Köln","locationText":"Lichtendorf - Kamen-Zentrum","lat":51.534697933083436,"lng":7.660792116765035,"geometry":{"type":"LineString","coordinates":[[7.660792117,51.534697933],[7.6606224,51.533943701],[7.6605195,51.533380101],[7.660249,51.532127501],[7.6601147,51.531467901],[7.659834,51.530173501],[7.6584509,51.523794501],[7.6582511,51.522961101],[7.6576962,51.521493601],[7.6573724,51.520748501],[7.657095294,51.520161026]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.311Z"},{"id":"6a856998989e2a5413f99b89","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de125","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Kamen-Zentrum - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Dortmund, zwischen 4.2 km hinter AS Kamen-Zentrum und 0.9 km vor AS Unna\nLänge: 0.45 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Dortmund","locationText":"Unna - Kamen-Zentrum","lat":51.53870589158548,"lng":7.661669793519102,"geometry":{"type":"LineString","coordinates":[[7.661669794,51.538705892],[7.6615908,51.538332901],[7.6615296,51.538071901],[7.6611478,51.536341501],[7.6609411,51.535369201],[7.6607967,51.534718301],[7.660792117,51.534697933]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.313Z"},{"id":"6a856998989e2a5413f99b8a","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de123","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Kamen-Zentrum - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Dortmund, zwischen 3.7 km hinter AS Kamen-Zentrum und 1.4 km vor AS Unna\nLänge: 0.5 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Dortmund","locationText":"Unna - Kamen-Zentrum","lat":51.543161175750306,"lng":7.662630148908579,"geometry":{"type":"LineString","coordinates":[[7.662630149,51.543161176],[7.6625776,51.542913201],[7.6621581,51.540988301],[7.6620714,51.540602101],[7.661669794,51.538705892]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.315Z"},{"id":"6a856998989e2a5413f99b8b","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de121","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Kamen-Zentrum - Unna","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nA1: Münster -> Dortmund, zwischen 3.1 km hinter AS Kamen-Zentrum und 1.9 km vor AS Unna\nLänge: 0.55 km | Maximale Durchfahrtsbreite: 9.6 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"Münster -> Dortmund","locationText":"Unna - Kamen-Zentrum","lat":51.54807762491685,"lng":7.66338581658675,"geometry":{"type":"LineString","coordinates":[[7.663385817,51.548077625],[7.663182,51.546327901],[7.6630105,51.545175201],[7.6626733,51.543364801],[7.662630149,51.543161176]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.317Z"},{"id":"6a856998989e2a5413f99b91","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de119","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der B1Abschnitt09Werl-DO\nLänge: 0.38 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"","locationText":"","lat":51.524436952405246,"lng":7.658399656508735,"geometry":{"type":"LineString","coordinates":[[7.658399657,51.524436952],[7.6582441,51.523742801],[7.6580498,51.523000401],[7.6579071,51.522646401],[7.6575484,51.521660301],[7.657292269,51.521079346]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.557Z"},{"id":"6a856998989e2a5413f99b92","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de117","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAbfahrt von der A1: AS Unna (aus Richtung Kamen-Zentrum)\nLänge: 0.15 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AS Unna (aus Richtung Kamen-Zentrum)","locationText":"","lat":51.52805270789929,"lng":7.6592031594792385,"geometry":{"type":"LineString","coordinates":[[7.659203159,51.528052708],[7.6589668,51.526958401],[7.658909433,51.526717872]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.559Z"},{"id":"6a856998989e2a5413f99b93","source":"autobahn","sourceId":"2026-005011--vi-bs.2026-08-19_05-00-00-000.devi-zus.2026-07-13_20-00-00-000.de137","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Umbau AK Dortmund-Unna - AlD 5011","description":"Zeitraum dieser Bauphase:\nBeginn: 19.08.26 um 05:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 25.11.28)\nAuffahrt auf die A44: AK Dortmund/Unna (in Richtung Unna-Ost)\nLänge: 0.16 km | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Umbau AK Dortmund-Unna - AlD 5011","road":"A1","direction":"AK Dortmund/Unna (in Richtung Unna-Ost)","locationText":"","lat":51.52045793852787,"lng":7.657985616904783,"geometry":{"type":"LineString","coordinates":[[7.657985617,51.520457939],[7.6582466,51.520596001],[7.6585864,51.520713001],[7.6591459,51.520852801],[7.6595101,51.520988501],[7.6597625,51.521133501],[7.659893536,51.52127993]]},"startTime":"2026-08-19T03:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.595Z"},{"id":"6a97fee18cface7d44e1f6ab","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de15","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Holdorf - Fladderlohhausen","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 14:30 bis 17:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 1.7 km hinter AS Holdorf und 0.4 km vor Fladderlohhausen\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Fladderlohhausen - Holdorf","lat":52.58209350177177,"lng":8.109608216337387,"geometry":{"type":"LineString","coordinates":[[8.109608216,52.582093502],[8.109562,52.581072601],[8.109555814,52.579846272]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.431Z"},{"id":"6a97fee18cface7d44e1f6a0","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de27","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Neuenkirchen/Vörden","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 11:30 bis 13:30 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.2 km hinter Bramsche und 6.5 km vor AS Neuenkirchen/Vörden\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Neuenkirchen/Vörden - Bramsche","lat":52.43953615795763,"lng":8.035224320463659,"geometry":{"type":"LineString","coordinates":[[8.03522432,52.439536158],[8.0357737,52.440919701],[8.036111802,52.441715621]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.398Z"},{"id":"6a97fee18cface7d44e1f6a1","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de21","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Neuenkirchen/Vörden","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 06:00 bis 09:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 5.5 km hinter Bramsche und 3.2 km vor AS Neuenkirchen/Vörden\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Neuenkirchen/Vörden - Bramsche","lat":52.467821749065834,"lng":8.052180801410579,"geometry":{"type":"LineString","coordinates":[[8.052180801,52.467821749],[8.0528956,52.468784401],[8.0535805,52.469667401],[8.053728055,52.469860265]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.400Z"},{"id":"6a97fee18cface7d44e1f6a2","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de29","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neuenkirchen/Vörden - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 14:00 bis 15:30 Uhr\nA1: Bremen -> Osnabrück, zwischen 6.5 km hinter AS Neuenkirchen/Vörden und 2.2 km vor Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Neuenkirchen/Vörden","lat":52.441750485514234,"lng":8.035896525141832,"geometry":{"type":"LineString","coordinates":[[8.035896525,52.441750486],[8.035561,52.440993401],[8.03498583,52.439571761]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.418Z"},{"id":"6a97fee18cface7d44e1f6a3","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de23","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neuenkirchen/Vörden - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 09:30 bis 11:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 3.2 km hinter AS Neuenkirchen/Vörden und 5.5 km vor Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Neuenkirchen/Vörden","lat":52.46992132468243,"lng":8.053516496133229,"geometry":{"type":"LineString","coordinates":[[8.053516496,52.469921325],[8.0531764,52.469484401],[8.0519897,52.467922101],[8.051960504,52.467883087]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.420Z"},{"id":"6a97fee18cface7d44e1f6a4","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de31","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neuenkirchen/Vörden - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 15:30 bis 17:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 2.0 km hinter AS Neuenkirchen/Vörden und 6.7 km vor Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Neuenkirchen/Vörden","lat":52.4791078268145,"lng":8.061050588569746,"geometry":{"type":"LineString","coordinates":[[8.061050589,52.479107827],[8.0599912,52.477891901],[8.059331693,52.477109016]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.411Z"},{"id":"6a97fee18cface7d44e1f6a5","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de25","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neuenkirchen/Vörden - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 11:30 bis 13:30 Uhr\nA1: Bremen -> Osnabrück, zwischen 6.5 km hinter AS Neuenkirchen/Vörden und 2.2 km vor Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Neuenkirchen/Vörden","lat":52.441750485514234,"lng":8.035896525141832,"geometry":{"type":"LineString","coordinates":[[8.035896525,52.441750486],[8.035561,52.440993401],[8.03498583,52.439571761]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.412Z"},{"id":"6a97fee18cface7d44e1f6a6","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de19","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Neuenkirchen/Vörden - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 06:00 bis 09:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 3.2 km hinter AS Neuenkirchen/Vörden und 5.5 km vor Bramsche\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Bramsche - Neuenkirchen/Vörden","lat":52.46992132468243,"lng":8.053516496133229,"geometry":{"type":"LineString","coordinates":[[8.053516496,52.469921325],[8.0531764,52.469484401],[8.0519897,52.467922101],[8.051960504,52.467883087]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.414Z"},{"id":"6a97fee18cface7d44e1f6a7","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-16_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de35","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Fladderlohhausen - Langwege-Ost","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 06:00 bis 09:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.2 km hinter Fladderlohhausen und 2.0 km vor Langwege-Ost\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Langwege-Ost - Fladderlohhausen","lat":52.595666752008434,"lng":8.113111226450432,"geometry":{"type":"LineString","coordinates":[[8.113111226,52.595666752],[8.1131864,52.595838501],[8.1134382,52.596384901],[8.1135921,52.596720601],[8.114181315,52.597827282]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.429Z"},{"id":"6a97fee18cface7d44e1f6a8","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de17","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Fladderlohhausen - Holdorf","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 14:30 bis 17:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 0.4 km hinter Fladderlohhausen und 1.7 km vor AS Holdorf\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Holdorf - Fladderlohhausen","lat":52.57984647709708,"lng":8.109791050797543,"geometry":{"type":"LineString","coordinates":[[8.109791051,52.579846477],[8.1097818,52.580870001],[8.109829212,52.58209018]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.425Z"},{"id":"6a97fee18cface7d44e1f6a9","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de13","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Fladderlohhausen - Holdorf","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 12:30 bis 14:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 0.7 km hinter Fladderlohhausen und 1.4 km vor AS Holdorf\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Holdorf - Fladderlohhausen","lat":52.582090180300035,"lng":8.10982921243119,"geometry":{"type":"LineString","coordinates":[[8.109829212,52.58209018],[8.1098727,52.583209301],[8.109984941,52.584341234]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.427Z"},{"id":"6a97fee18cface7d44e1f6aa","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de7","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Holdorf - Langwege-Ost","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 08:30 bis 10:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 1.5 km hinter AS Holdorf und 0.3 km vor Langwege-Ost\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Langwege-Ost - Holdorf","lat":52.60935691021895,"lng":8.122333490004248,"geometry":{"type":"LineString","coordinates":[[8.12233349,52.60935691],[8.1232019,52.610349101],[8.124129314,52.611318032]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.434Z"},{"id":"6a91d1d68cface7d44de9aca","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de104","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAbfahrt von der A1: AK Westhofener Kreuz (aus Richtung Lennhof)\nLänge: 0.07 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof)","locationText":"","lat":51.43048147399592,"lng":7.531816606999569,"geometry":{"type":"LineString","coordinates":[[7.531816607,51.430481474],[7.5318572,51.430498701],[7.5320147,51.430550801],[7.5321698,51.430585801],[7.5323002,51.430607601],[7.5324388,51.430625501],[7.5325712,51.430633901],[7.5327219,51.430636701],[7.532771724,51.430634832]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.547Z"},{"id":"6a97fee18cface7d44e1f6ac","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de11","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Holdorf - Fladderlohhausen","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 12:30 bis 14:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 1.4 km hinter AS Holdorf und 0.7 km vor Fladderlohhausen\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Fladderlohhausen - Holdorf","lat":52.584349211406334,"lng":8.109766238062871,"geometry":{"type":"LineString","coordinates":[[8.109766238,52.584349211],[8.1096619,52.583279301],[8.109608216,52.582093502]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.432Z"},{"id":"6a97fee18cface7d44e1f6ad","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Langwege-Ost - Holdorf","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 08:30 bis 10:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 0.3 km hinter Langwege-Ost und 1.5 km vor AS Holdorf\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Holdorf - Langwege-Ost","lat":52.6113825460931,"lng":8.123946634794535,"geometry":{"type":"LineString","coordinates":[[8.123946635,52.611382546],[8.1229805,52.610365201],[8.122140901,52.609419919]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.436Z"},{"id":"6a97fee18cface7d44e1f6ae","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de9","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Langwege-Ost - Holdorf","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 10:30 bis 12:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 1.2 km hinter Langwege-Ost und 0.6 km vor AS Holdorf\nLänge: 0.3 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Holdorf - Langwege-Ost","lat":52.60459181569556,"lng":8.118172240574777,"geometry":{"type":"LineString","coordinates":[[8.118172241,52.604591816],[8.1169624,52.602891501],[8.116440541,52.602107907]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.438Z"},{"id":"6a97fee18cface7d44e1f6af","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Langwege-West - Lohne/Dinklage","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 06:00 bis 08:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 3.3 km hinter Langwege-West und 1.8 km vor AS Lohne/Dinklage\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Lohne/Dinklage - Langwege-West","lat":52.639986288550965,"lng":8.151229996436438,"geometry":{"type":"LineString","coordinates":[[8.151229996,52.639986289],[8.1513633,52.640145901],[8.1527003,52.641858801],[8.152822546,52.642016297]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.440Z"},{"id":"6a97fee18cface7d44e1f6b0","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-16_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de37","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Langwege-West - Lohne/Dinklage","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n16.09.26 von 09:30 bis 11:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 2.7 km hinter Langwege-West und 2.3 km vor AS Lohne/Dinklage\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Lohne/Dinklage - Langwege-West","lat":52.63574722287069,"lng":8.147653739767932,"geometry":{"type":"LineString","coordinates":[[8.14765374,52.635747223],[8.149352718,52.637742725]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.445Z"},{"id":"6a97fee18cface7d44e1f6b1","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-14_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Lohne/Dinklage - Langwege-West","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 06:00 bis 08:00 Uhr\nA1: Bremen -> Osnabrück, zwischen 1.8 km hinter AS Lohne/Dinklage und 3.3 km vor Langwege-West\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Langwege-West - Lohne/Dinklage","lat":52.642070824338745,"lng":8.152629672345562,"geometry":{"type":"LineString","coordinates":[[8.152629672,52.642070824],[8.1525231,52.641929601],[8.15101457,52.640051546]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.447Z"},{"id":"6a9825c08cface7d44e2145c","source":"autobahn","sourceId":"2026-044946--vi-fbm.2026-08-14_20-00-00-000.devi-zus.2026-08-14_20-00-00-000_006.de5","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Osnabrück-Nord - Bramsche","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 20:00 bis zum 15.09.26 05:00 Uhr.\n17.09.26 20:00 bis zum 18.09.26 05:00 Uhr.\nA1: Osnabrück -> Bremen, zwischen 0.6 km hinter AS Osnabrück-Nord und 2.9 km vor AS Bramsche\nLänge: 2.85 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 7.75 m\nA1 - Auf- oder Abbau Verkehrsführung - Wanderbaustelle - AkD 44946","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Bramsche - Osnabrück-Nord","lat":52.34605331994314,"lng":8.026010318686724,"geometry":{"type":"LineString","coordinates":[[8.026010319,52.34605332],[8.0261903,52.346201001],[8.0274237,52.347258901],[8.0293076,52.348973701],[8.0317577,52.351365001],[8.0337778,52.353574301],[8.0355232,52.355641401],[8.0375078,52.358270501],[8.0388316,52.360216501],[8.0394197,52.361150301],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.0418412,52.365941101],[8.0421676,52.366810901],[8.0427704,52.368469501],[8.0429335,52.368999801],[8.043005909,52.369264475]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.378Z"},{"id":"6a9825c08cface7d44e2145e","source":"autobahn","sourceId":"2026-044946--vi-fbm.2026-08-21_20-00-00-000.devi-zus.2026-08-14_20-00-00-000_006.de15","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Bramsche - Osnabrück-Nord","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n21.09.26 20:00 bis zum 22.09.26 05:00 Uhr.\n24.09.26 20:00 bis zum 25.09.26 05:00 Uhr.\nA1: Bremen -> Osnabrück, zwischen 2.1 km hinter AS Bramsche und 3.1 km vor AS Osnabrück-Nord\nLänge: 1.2 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 4.25 m\nA1 - Auf- oder Abbau Verkehrsführung - Wanderbaustelle - AkD 44946","road":"A1","direction":"Bremen -> Osnabrück","locationText":"Osnabrück-Nord - Bramsche","lat":52.376432682226245,"lng":8.043692751185779,"geometry":{"type":"LineString","coordinates":[[8.043692751,52.376432682],[8.04372,52.375845001],[8.0436659,52.375133201],[8.0436536,52.374791701],[8.0435683,52.373431701],[8.0432265,52.371235301],[8.0426558,52.368887701],[8.0425156,52.368362201],[8.04174,52.366258301],[8.041520345,52.365775834]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.389Z"},{"id":"6a9866818cface7d44e2414c","source":"autobahn","sourceId":"2025-055308--vi-bs.2026-09-15_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de84","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Osnabrück-Nord - Bramsche","description":"Zeitraum dieser Bauphase:\nBeginn: 15.09.26 um 06:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 24.09.26)\nA1: Osnabrück -> Bremen, zwischen 3.1 km hinter AS Osnabrück-Nord und 2.9 km vor AS Bramsche\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 7 m\nA1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Bramsche - Osnabrück-Nord","lat":52.3657457651354,"lng":8.0417564165269,"geometry":{"type":"LineString","coordinates":[[8.041756417,52.365745765],[8.0418412,52.365941101],[8.0421676,52.366810901],[8.0427704,52.368469501],[8.0429335,52.368999801],[8.043005909,52.369264475]]},"startTime":"2026-09-15T04:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.380Z"},{"id":"6a9866818cface7d44e2414d","source":"autobahn","sourceId":"2025-055308--vi-bs.2026-09-15_06-00-00-000.devi-bs.2026-03-02_20-00-00-000.de82","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Osnabrück-Nord - Wallenhorster Straße","description":"Zeitraum dieser Bauphase:\nBeginn: 15.09.26 um 06:00 Uhr\nEnde: 17.09.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 24.09.26)\nA1: Osnabrück -> Bremen, zwischen 2.7 km hinter AS Osnabrück-Nord und 0.4 km vor Wallenhorster Straße\nLänge: 0.4 km | Maximale Durchfahrtsbreite: 7 m\nA1  - Baugrunduntersuchungen zw. OS-Hafen und AS Bramsche - AlD 55308","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Wallenhorster Straße - Osnabrück-Nord","lat":52.3622960525851,"lng":8.04007625391459,"geometry":{"type":"LineString","coordinates":[[8.040076254,52.362296053],[8.0403294,52.362737801],[8.0406998,52.363466701],[8.041158,52.364367001],[8.041756417,52.365745765]]},"startTime":"2026-09-15T04:00:00.000Z","endTime":"2026-09-17T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.382Z"},{"id":"6a9970c88cface7d44e2de4e","source":"autobahn","sourceId":"2026-045143--vi-bs.2026-09-15_08-00-00-000.devi-bs.2026-09-08_08-00-00-000_003.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Lichtendorf - Dortmund/Unna","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 08:00 bis 16:00 Uhr\n16.09.26 von 08:00 bis 16:00 Uhr\nA1: Köln -> Münster, zwischen 3.9 km hinter Lichtendorf und 3.4 km vor AK Dortmund/Unna\nLänge: 0.3 km | Maximale Durchfahrtsbreite: 9.5 m\nA1 - Arbeiten an Schutzeinrichtungen - AkD 45143","road":"A1","direction":"Köln -> Münster","locationText":"Dortmund/Unna - Lichtendorf","lat":51.49360069902362,"lng":7.633451527962491,"geometry":{"type":"LineString","coordinates":[[7.633451528,51.493600699],[7.6347494,51.494519701],[7.6352438,51.494867401],[7.636317642,51.495618527]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.279Z"},{"id":"6a97ce1e8cface7d44e1d58f","source":"autobahn","sourceId":"2026-044829--vi-bs.2026-09-14_09-00-00-000.devi-bs.2026-09-14_09-00-00-000_002.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamener Kreuz - Kamen-Zentrum","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\nA1: Münster -> Dortmund, zwischen 1.2 km hinter AK Kamener Kreuz und 1.8 km vor AS Kamen-Zentrum\nLänge: 0.18 km | Maximale Durchfahrtsbreite: 6.75 m\nA1 - Brückenwartung - AkD 44829","road":"A1","direction":"Münster -> Dortmund","locationText":"Kamen-Zentrum - Kamener Kreuz","lat":51.5904103740418,"lng":7.684357883504374,"geometry":{"type":"LineString","coordinates":[[7.684357884,51.590410374],[7.6842819,51.590205801],[7.6841741,51.589951201],[7.6838395,51.589274001],[7.683604348,51.588863526]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.321Z"},{"id":"6a91d1d68cface7d44de9ac9","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de112","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAuffahrt auf die A45: AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)\nLänge: 0.11 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Schwerte-Ergste)","locationText":"","lat":51.43358365013835,"lng":7.533664537434759,"geometry":{"type":"LineString","coordinates":[[7.533664537,51.43358365],[7.5337182,51.433587101],[7.5338245,51.433590101],[7.5339589,51.433580301],[7.534094,51.433553901],[7.5341967,51.433526301],[7.5342937,51.433487401],[7.5344014,51.433432101],[7.5344712,51.433381901],[7.534552,51.433326301],[7.5346194,51.433254601],[7.5346552,51.433199401],[7.5346764,51.433134101],[7.5346981,51.433051201],[7.534694237,51.43299665]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.545Z"},{"id":"6a91d1d68cface7d44de9acb","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de102","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAbfahrt von der A1: AK Westhofener Kreuz (aus Richtung Lennhof)\nLänge: 0.04 km | Maximale Durchfahrtsbreite: 4.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof)","locationText":"","lat":51.428578453686384,"lng":7.529398790884907,"geometry":{"type":"LineString","coordinates":[[7.529398791,51.428578454],[7.5294435,51.428607901],[7.529725223,51.428829745]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.549Z"},{"id":"6a91d1d68cface7d44de9acc","source":"autobahn","sourceId":"2026-043339--vi-bs.2026-08-31_00-00-00-000.devi-zus.2026-08-31_00-00-00-000_003.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"AS Bockel A1 Auffahrt ","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 00:00 Uhr\nEnde: 01.10.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 01.10.26)\nAuffahrt auf die A1: AS Bockel (aus Richtung Bockel)\nLänge: 0.22 km | Maximale Durchfahrtsbreite: 6.5 m\nAS Bockel A1 Auffahrt","road":"A1","direction":"AS Bockel (aus Richtung Bockel)","locationText":"","lat":53.19541469523498,"lng":9.28529306741471,"geometry":{"type":"LineString","coordinates":[[9.285293067,53.195414695],[9.2852924,53.195414301],[9.2851788,53.195330001],[9.2850937,53.195246701],[9.285013,53.195164501],[9.2849884,53.195102601],[9.284885,53.194944601],[9.2848481,53.194834901],[9.2848252,53.194714601],[9.2848133,53.194627101],[9.2848185,53.194499401],[9.2848352,53.194371601],[9.2848477,53.194250001],[9.2848465,53.194004201],[9.284786,53.193786201],[9.2847255,53.193676101],[9.2846445,53.193551701],[9.284637285,53.193544011]]},"startTime":"2026-08-30T22:00:00.000Z","endTime":"2026-10-01T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.550Z"},{"id":"6a91d1d68cface7d44de9acd","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de116","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAuffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 3.5 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof)","locationText":"","lat":51.43223270893842,"lng":7.5356413794895785,"geometry":{"type":"LineString","coordinates":[[7.535641379,51.432232709],[7.5355666,51.432322401],[7.5353204,51.432641601],[7.5346741,51.433468401],[7.5342217,51.434053901],[7.534059332,51.434271108]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.565Z"},{"id":"6a91d1d68cface7d44de9ace","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de108","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAuffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof)\nLänge: 0.06 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 7 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof)","locationText":"","lat":51.432204920147534,"lng":7.532430908990536,"geometry":{"type":"LineString","coordinates":[[7.532430909,51.43220492],[7.5324517,51.432247101],[7.532652826,51.432726191]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.566Z"},{"id":"6a91d1d68cface7d44de9ad1","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de110","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nVon Auffahrt auf die A1: AK Westhofener Kreuz (aus Richtung Lennhof) nach A1: Köln -> Dortmund, zwischen AK Westhofener Kreuz und 3.3 km vor AS Schwerte\nLänge: 0.09 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof) nach A1","locationText":"","lat":51.43390926867453,"lng":7.53294307848804,"geometry":{"type":"LineString","coordinates":[[7.532943078,51.433909269],[7.5329468,51.434058501],[7.533179462,51.434704068]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.623Z"},{"id":"6a91d1d68cface7d44de9ad2","source":"autobahn","sourceId":"2023-004560--vi-bs.2026-08-28_21-00-00-000.devi-zus.2024-05-11_21-00-00-000_001.f.de106","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","description":"Zeitraum dieser Bauphase:\nBeginn: 28.08.26 um 21:00 Uhr\nEnde: 30.09.26 um 21:00 Uhr\n(Ende der Gesamtmaßnahme: 09.01.30)\nAbfahrt von der A1: AK Westhofener Kreuz (aus Richtung Lennhof)\nLänge: 0.07 km | Max. 60 km/h | Maximale Durchfahrtsbreite: 4 m\nA1 - Ersatzneubau Kreuzungsbauwerk A1-A45 Westhofener Kreuz - AlD 4560","road":"A1","direction":"AK Westhofener Kreuz (aus Richtung Lennhof)","locationText":"","lat":51.43055314555193,"lng":7.531459338220203,"geometry":{"type":"LineString","coordinates":[[7.531459338,51.430553146],[7.5317116,51.430921601],[7.531848982,51.431143072]]},"startTime":"2026-08-28T19:00:00.000Z","endTime":"2026-09-30T21:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.625Z"},{"id":"6a935b9e8cface7d44df5d4f","source":"autobahn","sourceId":"2025-061946--vi-bs.2026-09-14_00-00-00-000.devi-zus.2026-09-14_00-00-00-000_003.de26","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bad Schwartau - Sereetzerfeld","description":"Zeitraum dieser Bauphase:\nBeginn: 14.09.26 um 00:00 Uhr\nEnde: 10.10.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 20.05.28)\nA1: Lübeck -> Fehmarn, zwischen 0.6 km hinter AS Bad Schwartau und 0.4 km vor Sereetzerfeld\nLänge: 3.28 km | Maximale Durchfahrtsbreite: 6.25 m\nA1, AK Bad Schwartau bis AS Ratekau, BW74, Brückenersatzneubau","road":"A1","direction":"Lübeck -> Fehmarn","locationText":"Sereetzerfeld - Bad Schwartau","lat":53.909533141905285,"lng":10.695663937525765,"geometry":{"type":"LineString","coordinates":[[10.695663938,53.909533142],[10.6961322,53.909768101],[10.6981565,53.910938401],[10.698684,53.911243001],[10.6992385,53.911542401],[10.6997301,53.911783301],[10.7002445,53.912019601],[10.700811,53.912265201],[10.7014146,53.912495701],[10.7017221,53.912613401],[10.7023914,53.912848501],[10.7030193,53.913044001],[10.7036686,53.913225101],[10.7043019,53.913390001],[10.7049495,53.913539301],[10.7061619,53.913780701],[10.7086299,53.914244401],[10.7108696,53.914669101],[10.7142141,53.915287301],[10.715586,53.915562501],[10.7161135,53.915681501],[10.7168773,53.915873501],[10.7175651,53.916067601],[10.7183787,53.916334701],[10.7190822,53.916598601],[10.719759,53.916882201],[10.7204483,53.917195901],[10.7208741,53.917416901],[10.7216412,53.917876001],[10.7220189,53.918107901],[10.7226058,53.918525901],[10.722984,53.918825901],[10.7234114,53.919189101],[10.7237037,53.919446701],[10.7239547,53.919726201],[10.7240473,53.919832501],[10.7244818,53.920343801],[10.7248557,53.920880101],[10.7249461,53.921026601],[10.7253859,53.921823201],[10.7256222,53.922419401],[10.7257481,53.922753201],[10.7258039,53.922946901],[10.7260957,53.923971901],[10.7265038,53.925293901],[10.7269404,53.926435501],[10.7272698,53.927159601],[10.7273404,53.927298101],[10.7278345,53.928162901],[10.7280998,53.928580101],[10.728257557,53.92879863]]},"startTime":"2026-09-13T22:00:00.000Z","endTime":"2026-10-10T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.507Z"},{"id":"6a935b9e8cface7d44df5d50","source":"autobahn","sourceId":"2025-061946--vi-bs.2026-09-14_00-00-00-000.devi-zus.2026-09-14_00-00-00-000_003.de28","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Sereetzerfeld - Bad Schwartau","description":"Zeitraum dieser Bauphase:\nBeginn: 14.09.26 um 00:00 Uhr\nEnde: 10.10.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 20.05.28)\nA1: Fehmarn -> Lübeck, zwischen 0.4 km hinter Sereetzerfeld und 0.6 km vor AS Bad Schwartau\nLänge: 3.28 km | Maximale Durchfahrtsbreite: 6.25 m\nA1, AK Bad Schwartau bis AS Ratekau, BW74, Brückenersatzneubau","road":"A1","direction":"Fehmarn -> Lübeck","locationText":"Bad Schwartau - Sereetzerfeld","lat":53.928842495690226,"lng":10.72808229032542,"geometry":{"type":"LineString","coordinates":[[10.72808229,53.928842496],[10.7279325,53.928632401],[10.7276513,53.928202801],[10.7274547,53.927884201],[10.7271562,53.927335201],[10.7270903,53.927193301],[10.7267544,53.926470601],[10.7263322,53.925333601],[10.7259295,53.924045901],[10.7255635,53.922803201],[10.7254564,53.922514101],[10.7252053,53.921854601],[10.7250705,53.921581401],[10.7249161,53.921268601],[10.7246931,53.920923401],[10.7243152,53.920393801],[10.7239358,53.919957701],[10.7237488,53.919744901],[10.7232493,53.919286501],[10.7228154,53.918881301],[10.7223259,53.918499701],[10.7217429,53.918106401],[10.7214612,53.917923801],[10.7206997,53.917492501],[10.7200846,53.917176601],[10.7190463,53.916722101],[10.7189113,53.916672901],[10.7182553,53.916433801],[10.7174757,53.916181301],[10.7167982,53.915990301],[10.7161241,53.915817501],[10.7156529,53.915711201],[10.7148591,53.915543301],[10.7140705,53.915390901],[10.7071307,53.914127601],[10.7048754,53.913680201],[10.7042,53.913526701],[10.7035328,53.913357501],[10.7032096,53.913270001],[10.7028863,53.913175801],[10.7022544,53.912977301],[10.7016732,53.912776301],[10.7010951,53.912565601],[10.7005642,53.912354401],[10.6997479,53.911990601],[10.6990276,53.911644401],[10.6981637,53.911169501],[10.6973466,53.910681701],[10.6966791,53.910284801],[10.6963277,53.910091101],[10.6959713,53.909900601],[10.695489567,53.909652668]]},"startTime":"2026-09-13T22:00:00.000Z","endTime":"2026-10-10T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.509Z"},{"id":"6a935b9e8cface7d44df5d51","source":"autobahn","sourceId":"2026-005834--vi-bs.2026-09-14_00-00-00-000.devi-zus.2026-06-08_00-00-00-000_002.de9","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Gremersdorf - B207","description":"Zeitraum dieser Bauphase:\nBeginn: 14.09.26 um 00:00 Uhr\nEnde: 21.09.26 um 00:00 Uhr\n(Ende der Gesamtmaßnahme: 10.10.26)\nA1: Lübeck -> Fehmarn, zwischen 0.5 km hinter AS Gremersdorf und B207\nLänge: 6.61 km | Maximale Durchfahrtsbreite: 3.25 m\nA1, AS Gremersdorf bis AS Heiligenhafen-Ost, B207, Instandsetzung der Deckschicht","road":"A1","direction":"Lübeck -> Fehmarn","locationText":"B207 - Gremersdorf","lat":54.335342153887304,"lng":10.936861454383255,"geometry":{"type":"LineString","coordinates":[[10.936861454,54.335342154],[10.9369989,54.335483501],[10.9389843,54.337444701],[10.9393983,54.337842301],[10.9399725,54.338417401],[10.9411016,54.339534401],[10.9415007,54.339929101],[10.9418038,54.340228901],[10.9426078,54.341025301],[10.9432216,54.341627301],[10.9434879,54.341883101],[10.9444324,54.342837901],[10.9451392,54.343532501],[10.9457518,54.344134901],[10.9474874,54.345834701],[10.9476833,54.346019501],[10.9488012,54.347151701],[10.9505402,54.348868301],[10.9521385,54.350442201],[10.9532086,54.351510601],[10.954345,54.352632101],[10.9555863,54.353845901],[10.956242,54.354499001],[10.9574032,54.355655001],[10.9586209,54.356859001],[10.958758,54.356996901],[10.9596395,54.357870501],[10.9598648,54.358095701],[10.9599928,54.358223601],[10.9602884,54.358501701],[10.9606134,54.358795901],[10.9609343,54.359086401],[10.9610045,54.359148901],[10.9613721,54.359473901],[10.961695,54.359751201],[10.9622198,54.360175501],[10.962462,54.360357801],[10.9626472,54.360481501],[10.9630765,54.360742901],[10.9632888,54.360873001],[10.9635,54.360991801],[10.963809,54.361164901],[10.9643416,54.361424601],[10.9647937,54.361637001],[10.9655105,54.361933201],[10.9659809,54.362105901],[10.9664593,54.362259301],[10.9669612,54.362405101],[10.967462,54.362530901],[10.9679978,54.362643301],[10.9684948,54.362732401],[10.9690378,54.362813901],[10.9696032,54.362888101],[10.9701737,54.362942801],[10.9707145,54.362984201],[10.9713061,54.363010801],[10.9720911,54.363040401],[10.9732632,54.363035801],[10.9747484,54.362984501],[10.9756306,54.362938501],[10.9766048,54.362875201],[10.9777012,54.362793001],[10.9779101,54.362776201],[10.9790065,54.362686301],[10.9793,54.362659701],[10.9819443,54.362431601],[10.9849542,54.362192701],[10.9852827,54.362166801],[10.9876401,54.362007101],[10.9889312,54.361926501],[10.9915456,54.361797201],[10.9932309,54.361711601],[10.9944291,54.361661901],[10.9957586,54.361614201],[10.9969218,54.361573001],[10.9976129,54.361557601],[10.9987597,54.361544401],[10.9993679,54.361547101],[10.9999338,54.361554101],[11.0005291,54.361565001],[11.0010142,54.361577301],[11.0015681,54.361602601],[11.0023265,54.361642601],[11.0027322,54.361669401],[11.0031989,54.361710701],[11.0039125,54.361778001],[11.0045369,54.361853801],[11.0050849,54.361926701],[11.0058552,54.362040301],[11.0061901,54.362097601],[11.0068881,54.362221101],[11.0076724,54.362371301],[11.0079786,54.362427201],[11.0084136,54.362500701],[11.0089722,54.362587701],[11.0096193,54.362685301],[11.0099401,54.362730901],[11.010485,54.362823501],[11.0120962,54.362987601],[11.0123387,54.363008638]]},"startTime":"2026-09-13T22:00:00.000Z","endTime":"2026-09-21T00:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.519Z"},{"id":"6a969dcb8cface7d44e12505","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de15","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Haus Reck - Fuchseggen","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nA1: Dortmund -> Münster, zwischen 3.0 km hinter Haus Reck und 0.4 km vor Fuchseggen\nLänge: 2.6 km | Maximale Durchfahrtsbreite: 6.05 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"Dortmund -> Münster","locationText":"Fuchseggen - Haus Reck","lat":51.64704884560705,"lng":7.684814477868672,"geometry":{"type":"LineString","coordinates":[[7.684814478,51.647048846],[7.684779,51.647215701],[7.6846185,51.647904401],[7.684414,51.648837101],[7.6842585,51.649589301],[7.6841358,51.650182801],[7.6840453,51.650605101],[7.6840178,51.650748901],[7.6838883,51.651457801],[7.6837144,51.652495901],[7.6836197,51.653096901],[7.6835069,51.653894401],[7.6834069,51.654686801],[7.6833527,51.655151101],[7.6833046,51.655596101],[7.6832381,51.656273401],[7.6830206,51.659226701],[7.6829551,51.660087601],[7.6828454,51.661524701],[7.6827849,51.662246501],[7.6827036,51.663081201],[7.6826898,51.663253601],[7.6825507,51.664389001],[7.6824323,51.665392601],[7.6823509,51.665874501],[7.6822741,51.666356601],[7.6822404,51.666529701],[7.6820635,51.667556501],[7.6817261,51.669120001],[7.6816862,51.669308801],[7.6815143,51.670058101],[7.681458474,51.670273905]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.328Z"},{"id":"6a969dcb8cface7d44e12507","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de27","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Fuchseggen - Haus Reck","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nA1: Münster -> Dortmund, zwischen 0.4 km hinter Fuchseggen und 3.0 km vor Haus Reck\nLänge: 2.59 km | Maximale Durchfahrtsbreite: 6.05 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"Münster -> Dortmund","locationText":"Haus Reck - Fuchseggen","lat":51.669820709066265,"lng":7.681378112089916,"geometry":{"type":"LineString","coordinates":[[7.681378112,51.669820709],[7.6815173,51.669221001],[7.6815399,51.669106101],[7.6815573,51.669028401],[7.6818696,51.667540301],[7.6820701,51.666494401],[7.6820984,51.666317601],[7.6821899,51.665681701],[7.6822689,51.665163901],[7.6823709,51.664366801],[7.6824992,51.663236901],[7.6827471,51.660043901],[7.6828032,51.659209601],[7.682879,51.658164101],[7.6828938,51.657959301],[7.6830295,51.656186801],[7.6831855,51.654876101],[7.6832755,51.654152901],[7.6833137,51.653888701],[7.6835065,51.652537901],[7.683618,51.651887101],[7.6836549,51.651672501],[7.6837202,51.651325001],[7.6838321,51.650730001],[7.684066,51.649545401],[7.68459,51.647177801],[7.684714765,51.646596194]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.332Z"},{"id":"6a969dcb8cface7d44e12506","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de13","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Haus Reck - Hamm/Bergkamen","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nA1: Dortmund -> Münster, zwischen 2.2 km hinter Haus Reck und 0.7 km vor AS Hamm/Bergkamen\nLänge: 0.77 km | Maximale Durchfahrtsbreite: 6.05 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"Dortmund -> Münster","locationText":"Hamm/Bergkamen - Haus Reck","lat":51.64015720119295,"lng":7.685748685857195,"geometry":{"type":"LineString","coordinates":[[7.685748686,51.640157201],[7.6857415,51.640334101],[7.6857015,51.640915801],[7.6856662,51.641606701],[7.6856027,51.642309701],[7.6855258,51.643011201],[7.6854411,51.643715901],[7.6853491,51.644312101],[7.6852419,51.644908601],[7.6850145,51.646108101],[7.684814478,51.647048846]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.330Z"},{"id":"6a97fee18cface7d44e1f69f","source":"autobahn","sourceId":"2026-044915--vi-bs.2026-09-15_06-00-00-000.devi-zus.2026-09-14_06-00-00-000_004.de33","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Bramsche - Neuenkirchen/Vörden","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n15.09.26 von 15:30 bis 17:00 Uhr\nA1: Osnabrück -> Bremen, zwischen 6.7 km hinter Bramsche und 2.0 km vor AS Neuenkirchen/Vörden\nLänge: 0.25 km | Max. 80 km/h | Maximale Durchfahrtsbreite: 8 m\nA1 - Arbeiten an Schutzeinrichtung - AkD 44915","road":"A1","direction":"Osnabrück -> Bremen","locationText":"Neuenkirchen/Vörden - Bramsche","lat":52.4770451104463,"lng":8.059535374515796,"geometry":{"type":"LineString","coordinates":[[8.059535375,52.47704511],[8.0601522,52.477779601],[8.061249103,52.479043441]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.396Z"},{"id":"6a97ce1e8cface7d44e1d58e","source":"autobahn","sourceId":"2026-044829--vi-bs.2026-09-14_09-00-00-000.devi-bs.2026-09-14_09-00-00-000_002.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamener Kreuz - Kamen-Zentrum","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\nA1: Münster -> Dortmund, zwischen 0.9 km hinter AK Kamener Kreuz und 1.9 km vor AS Kamen-Zentrum\nLänge: 0.27 km | Maximale Durchfahrtsbreite: 6 m\nA1 - Brückenwartung - AkD 44829","road":"A1","direction":"Münster -> Dortmund","locationText":"Kamen-Zentrum - Kamener Kreuz","lat":51.59279879102817,"lng":7.685089089246187,"geometry":{"type":"LineString","coordinates":[[7.685089089,51.592798791],[7.6850393,51.592602601],[7.6848811,51.592029801],[7.6848185,51.591782501],[7.6846605,51.591225101],[7.684358037,51.590410788]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.319Z"},{"id":"6a96ea558cface7d44e159a1","source":"autobahn","sourceId":"2026-044709--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_001.de1","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamen-Zentrum - Kamener Kreuz","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\nA1: Dortmund -> Münster, zwischen 1.8 km hinter AS Kamen-Zentrum und 1.2 km vor AK Kamener Kreuz\nLänge: 0.18 km | Maximale Durchfahrtsbreite: 6.75 m\nA1 - Brückenwartung - AkD 44709","road":"A1","direction":"Dortmund -> Münster","locationText":"Kamener Kreuz - Kamen-Zentrum","lat":51.588812588622055,"lng":7.68383351040684,"geometry":{"type":"LineString","coordinates":[[7.68383351,51.588812589],[7.6840631,51.589213401],[7.6844138,51.589907101],[7.6845223,51.590157901],[7.684601666,51.590365554]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.302Z"},{"id":"6a96ea558cface7d44e159a0","source":"autobahn","sourceId":"2026-044709--vi-bs.2026-09-14_09-00-00-000.devi-zus.2026-09-14_09-00-00-000_001.de3","service":"roadworks","type":"roadwork","category":"roadworks","subType":"SHORT_TERM_ROADWORKS","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 | Kamen-Zentrum - Kamener Kreuz","description":"Die Baustelle ist zu folgenden Zeiträumen gültig:\n14.09.26 von 09:00 bis 15:00 Uhr\nA1: Dortmund -> Münster, zwischen 1.8 km hinter AS Kamen-Zentrum und 1.2 km vor AK Kamener Kreuz\nLänge: 0.2 km | Maximale Durchfahrtsbreite: 6 m\nA1 - Brückenwartung - AkD 44709","road":"A1","direction":"Dortmund -> Münster","locationText":"Kamener Kreuz - Kamen-Zentrum","lat":51.588812588622055,"lng":7.68383351040684,"geometry":{"type":"LineString","coordinates":[[7.68383351,51.588812589],[7.6840631,51.589213401],[7.6844138,51.589907101],[7.6845223,51.590157901],[7.684668523,51.590540478]]},"startTime":null,"endTime":null,"severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.301Z"},{"id":"6a969dcb8cface7d44e1250d","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de17","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nAbfahrt von der A1: AS Hamm/Bergkamen (aus Richtung Fuchseggen)\nLänge: 0.12 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"AS Hamm/Bergkamen (aus Richtung Fuchseggen)","locationText":"","lat":51.65547194920269,"lng":7.682902276512507,"geometry":{"type":"LineString","coordinates":[[7.682902277,51.655471949],[7.682882,51.655391301],[7.6828249,51.655275001],[7.682732,51.655134501],[7.6826496,51.655031101],[7.6825588,51.654940901],[7.6824046,51.654834401],[7.6822427,51.654714301],[7.6820177,51.654571701],[7.681978468,51.654541941]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.637Z"},{"id":"6a969dcb8cface7d44e1250c","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de19","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nAuffahrt auf die A1: AS Hamm/Bergkamen (aus Richtung Fuchseggen)\nLänge: 0.11 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"AS Hamm/Bergkamen (aus Richtung Fuchseggen)","locationText":"","lat":51.6542224803139,"lng":7.681854554334097,"geometry":{"type":"LineString","coordinates":[[7.681854554,51.65422248],[7.6818835,51.654248201],[7.6820167,51.654312201],[7.6821301,51.654350001],[7.6822489,51.654378401],[7.6824192,51.654391301],[7.6825727,51.654379301],[7.6827305,51.654352001],[7.682864,51.654303501],[7.6829517,51.654258601],[7.683031,51.654205101],[7.6831103,51.654123001],[7.68312681,51.654097215]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.635Z"},{"id":"6a969dcb8cface7d44e1250b","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de21","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nAuffahrt auf die A1: AS Hamm/Bergkamen (aus Richtung Haus Reck)\nLänge: 0.07 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"AS Hamm/Bergkamen (aus Richtung Haus Reck)","locationText":"","lat":51.651904768115706,"lng":7.68487335719406,"geometry":{"type":"LineString","coordinates":[[7.684873357,51.651904768],[7.6848295,51.651896701],[7.6846978,51.651882001],[7.6845477,51.651880601],[7.6844143,51.651898101],[7.6842698,51.651936401],[7.6841261,51.652005101],[7.6840234,51.652078601],[7.683999656,51.652107422]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.633Z"},{"id":"6a969dcb8cface7d44e1250a","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de23","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nAbfahrt von der A1: AS Hamm/Bergkamen (aus Richtung Haus Reck)\nLänge: 0.09 km | Maximale Durchfahrtsbreite: 3.25 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"AS Hamm/Bergkamen (aus Richtung Haus Reck)","locationText":"","lat":51.650880732778326,"lng":7.684272599389587,"geometry":{"type":"LineString","coordinates":[[7.684272599,51.650880733],[7.6843067,51.650972701],[7.684395,51.651124401],[7.684477,51.651226701],[7.6846222,51.651364001],[7.6847623,51.651481401],[7.684864958,51.65154751]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.631Z"},{"id":"6a969dcb8cface7d44e12508","source":"autobahn","sourceId":"2025-057914--vi-bs.2026-08-31_20-00-00-000.devi-zus.2026-02-02_20-00-00-000_001.de25","service":"roadworks","type":"roadwork","category":"roadworks","subType":"ROADWORKS","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 | Hamm-Bockum/Werne - Hamm/Bergkamen","description":"Zeitraum dieser Bauphase:\nBeginn: 31.08.26 um 20:00 Uhr\nEnde: 05.10.26 um 20:00 Uhr\n(Ende der Gesamtmaßnahme: 15.01.27)\nA1: Münster -> Dortmund, zwischen 2.2 km hinter AS Hamm-Bockum/Werne und 1.9 km vor AS Hamm/Bergkamen\nLänge: 0.85 km | Maximale Durchfahrtsbreite: 6.05 m\nA1 - Vorarbeiten zum Ersatzneubau BW Datteln-Hamm-Kanal - AlD 57914","road":"A1","direction":"Münster -> Dortmund","locationText":"Hamm/Bergkamen - Hamm-Bockum/Werne","lat":51.67728790155803,"lng":7.678910068573603,"geometry":{"type":"LineString","coordinates":[[7.678910069,51.677287902],[7.6795555,51.675639601],[7.6797456,51.675198601],[7.6802548,51.673759201],[7.6807061,51.672327601],[7.6809138,51.671653301],[7.6813313,51.670022401],[7.681378112,51.669820709]]},"startTime":"2026-08-31T18:00:00.000Z","endTime":"2026-10-05T20:00:00.000Z","severity":2,"severityLabel":"low","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T14:51:21.001Z","updatedAt":"2026-09-13T14:51:21.341Z"},{"id":"6aa6beef8cface7d44ee19c8","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NI/r_LMS-NI/481775_D  NI LMS-NI  .0","service":"mobilithek_nrw_de_traffic","type":"obstruction","category":"obstruction","subType":"datex2-situation-publication","subCategory":"","roadworkPhase":"","roadworkPhaseLabel":"","title":"A1 Hamburg Richtung Bremen zwischen Horster Dreieck und Hittfeld Gefahr durch defektes Fahrzeug auf dem Standstreifen, Gefahr durch Personen auf der Fahrbahn A1 Hamburg Richtung Br","description":"A1 Hamburg Richtung Bremen zwischen Horster Dreieck und Hittfeld Gefahr durch defektes Fahrzeug auf dem Standstreifen, Gefahr durch Personen auf der Fahrbahn A1 Hamburg Richtung Bremen zwischen Horster Dreieck (37) und Hittfeld (41) mainCarriageway hardShoulder","road":"A1","direction":"Von A1 Hamburg nach Bremen","locationText":"A1 Hamburg Richtung Bremen zwischen Horster Dreieck und Hittfeld Gefahr durch defektes Fahrzeug auf dem Standstreifen, Gefahr durch Personen auf der Fahrbahn A1 Hamburg Richtung Br","lat":53.38115,"lng":10.00558,"geometry":null,"startTime":"2026-09-13T15:04:00.000Z","endTime":null,"severity":1,"severityLabel":"info","safetyRelated":true,"requiresProminentWarning":true,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:11.014Z"},{"id":"6aa6bb8a8cface7d44ee154d","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-SL/r_LMS-SL/18456_D SL LMS-SL.1","service":"mobilithek_nrw_de_traffic","type":"warning","category":"hazard","subType":"datex2-situation-publication","subCategory":"","roadworkPhase":"","roadworkPhaseLabel":"","title":"A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld und Nonnweiler-Braunshausen Gefahr durch Gegenstände auf der Fahrbahn, fahren Sie bitte besonders vorsichtig A1 Trier Ric","description":"A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld und Nonnweiler-Braunshausen Gefahr durch Gegenstände auf der Fahrbahn, fahren Sie bitte besonders vorsichtig A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld (134) und Nonnweiler-Braunshausen (137)","road":"A1","direction":"Von A1 Trier nach Saarbrücken","locationText":"A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld und Nonnweiler-Braunshausen Gefahr durch Gegenstände auf der Fahrbahn, fahren Sie bitte besonders vorsichtig A1 Trier Ric","lat":49.60682,"lng":6.96057,"geometry":null,"startTime":"2026-09-13T14:59:00.000Z","endTime":null,"severity":1,"severityLabel":"info","safetyRelated":true,"requiresProminentWarning":true,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:39.292Z"},{"id":"6aa6bb8a8cface7d44ee154c","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-SL/r_LMS-SL/18456_D SL LMS-SL.0","service":"mobilithek_nrw_de_traffic","type":"obstruction","category":"obstruction","subType":"datex2-situation-publication","subCategory":"","roadworkPhase":"","roadworkPhaseLabel":"","title":"A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld und Nonnweiler-Braunshausen Gefahr durch Gegenstände auf der Fahrbahn, fahren Sie bitte besonders vorsichtig A1 Trier Ric","description":"A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld und Nonnweiler-Braunshausen Gefahr durch Gegenstände auf der Fahrbahn, fahren Sie bitte besonders vorsichtig A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld (134) und Nonnweiler-Braunshausen (137)","road":"A1","direction":"Von A1 Trier nach Saarbrücken","locationText":"A1 Trier Richtung Saarbrücken zwischen Nonnweiler-Bierfeld und Nonnweiler-Braunshausen Gefahr durch Gegenstände auf der Fahrbahn, fahren Sie bitte besonders vorsichtig A1 Trier Ric","lat":49.60682,"lng":6.96057,"geometry":null,"startTime":"2026-09-13T14:59:00.000Z","endTime":null,"severity":1,"severityLabel":"info","safetyRelated":true,"requiresProminentWarning":true,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:39.288Z"},{"id":"6aa6b8018cface7d44ee10b7","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NI/r_LMS-NI/481773_D  NI LMS-NI  .0","service":"mobilithek_nrw_de_traffic","type":"accident","category":"accident","subType":"datex2-situation-publication","subCategory":"","roadworkPhase":"","roadworkPhaseLabel":"","title":"A1 Hamburg Richtung Bremen zwischen Elsdorf und Bockel Unfallaufnahme, Gefahr, 2 Fahrstreifen auf der rechten Seite gesperrt A1 Hamburg Richtung Bremen zwischen Elsdorf (48) und Bo","description":"A1 Hamburg Richtung Bremen zwischen Elsdorf und Bockel Unfallaufnahme, Gefahr, 2 Fahrstreifen auf der rechten Seite gesperrt A1 Hamburg Richtung Bremen zwischen Elsdorf (48) und Bockel (49)","road":"A1","direction":"Von A1 Hamburg nach Bremen","locationText":"A1 Hamburg Richtung Bremen zwischen Elsdorf und Bockel Unfallaufnahme, Gefahr, 2 Fahrstreifen auf der rechten Seite gesperrt A1 Hamburg Richtung Bremen zwischen Elsdorf (48) und Bo","lat":53.2320747,"lng":9.343342,"geometry":null,"startTime":"2026-09-13T14:45:00.000Z","endTime":null,"severity":1,"severityLabel":"info","safetyRelated":true,"requiresProminentWarning":true,"publicWarningText":"Unfallmeldung: Bitte vorsichtig fahren und offizielle Hinweise beachten.","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:36.377Z"},{"id":"6aa6ad8b8cface7d44ee050c","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NW/r_DE-NW-Straßen-NRW/S2375_D  NW LMS-NW.0","service":"mobilithek_nrw_de_traffic","type":"jam","category":"jam","subType":"datex2-situation-publication","subCategory":"","roadworkPhase":"","roadworkPhaseLabel":"","title":"A1 Münster Richtung Dortmund zwischen Kamen-Zentrum und Kreuz Dortmund/Unna 1 km Stau A1 Münster Richtung Dortmund zwischen Kamen-Zentrum (83) und Kreuz Dortmund/Unna mainCarriagew","description":"A1 Münster Richtung Dortmund zwischen Kamen-Zentrum und Kreuz Dortmund/Unna 1 km Stau A1 Münster Richtung Dortmund zwischen Kamen-Zentrum (83) und Kreuz Dortmund/Unna mainCarriageway 1000","road":"A1","direction":"Von A1 Münster nach Dortmund","locationText":"A1 Münster Richtung Dortmund zwischen Kamen-Zentrum und Kreuz Dortmund/Unna 1 km Stau A1 Münster Richtung Dortmund zwischen Kamen-Zentrum (83) und Kreuz Dortmund/Unna mainCarriagew","lat":51.57084,"lng":7.66713,"geometry":null,"startTime":"2026-09-13T13:53:00.000Z","endTime":null,"severity":1,"severityLabel":"info","safetyRelated":true,"requiresProminentWarning":false,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:53.189Z"},{"id":"6aa6a2d28cface7d44edf924","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NW/r_LMS-NW/1040689_D  NW LMS-NW.0","service":"mobilithek_nrw_de_traffic","type":"accident","category":"accident","subType":"datex2-situation-publication","subCategory":"","roadworkPhase":"","roadworkPhaseLabel":"","title":"A1 Blankenheim Richtung Euskirchen zwischen Mechernich und Wißkirchen Unfallaufnahme, Gefahr, Verkehr wird an der Unfallstelle vorbeigeführt A1 Blankenheim Richtung Euskirchen zwis","description":"A1 Blankenheim Richtung Euskirchen zwischen Mechernich und Wißkirchen Unfallaufnahme, Gefahr, Verkehr wird an der Unfallstelle vorbeigeführt A1 Blankenheim Richtung Euskirchen zwischen Mechernich (112) und Wißkirchen (111)","road":"A1","direction":"Von A1 Blankenheim nach Euskirchen","locationText":"A1 Blankenheim Richtung Euskirchen zwischen Mechernich und Wißkirchen Unfallaufnahme, Gefahr, Verkehr wird an der Unfallstelle vorbeigeführt A1 Blankenheim Richtung Euskirchen zwis","lat":50.57429,"lng":6.68645,"geometry":null,"startTime":"2026-09-13T13:14:00.000Z","endTime":null,"severity":1,"severityLabel":"info","safetyRelated":true,"requiresProminentWarning":true,"publicWarningText":"Unfallmeldung: Bitte vorsichtig fahren und offizielle Hinweise beachten.","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:08.925Z"},{"id":"6aa6326f8cface7d44ed843a","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:20240125T0916/DE-MIA/25690194-25711986-25711987-25711992.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Köln/Koblenz Richtung Trier zwischen Hasborn und Rastplatz Lüxem Fahrbahnerneuerung, linker Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 16","description":"A1 Köln/Koblenz Richtung Trier zwischen Hasborn und Rastplatz Lüxem Fahrbahnerneuerung, linker Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 16.09.2026 von 07:00 Uhr bis 16:00 Uhr A1 von Mehren (AS) Fahrbahninstandsetzung - A1 Fahrbahninstandsetzung - Lage-1, Fahrbahninstandsetzung A1 Köln/Koblenz Richtung Trier zwischen Hasborn (123) und Rastplatz Lüxem","road":"A1","direction":"Von A1 Köln/Koblenz nach Trier","locationText":"A1 Köln/Koblenz Richtung Trier zwischen Hasborn und Rastplatz Lüxem Fahrbahnerneuerung, linker Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 16","lat":50.00917,"lng":6.933456,"geometry":null,"startTime":"2026-09-16T07:00:00.000Z","endTime":"2026-09-16T14:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":true,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:36.218Z"},{"id":"6aa519228cface7d44eca1c8","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NW/r_20240125T0916/DE-MIA/25669736-25669738-25669741-25669742_D  NW LMS-NW.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Hansalinie, Osnabrück Richtung Dortmund zwischen Rastplatz Sandrup und Kreuz Münster-Süd Baustelle, 1 rechter Fahrstreifen gesperrt, Fahrbahn auf zwei Fahrstreifen verengt, am 1","description":"A1 Hansalinie, Osnabrück Richtung Dortmund zwischen Rastplatz Sandrup und Kreuz Münster-Süd Baustelle, 1 rechter Fahrstreifen gesperrt, Fahrbahn auf zwei Fahrstreifen verengt, am 15.09.2026 von 09:00 Uhr bis 15:00 Uhr A1 - Beschilderungsarbeiten - Wanderbaustelle - AkD 45779 - 2 Str FR Köln - 9h bis 15h - Lage-1, Beschilderungsarbeiten A1 Hansalinie, Osnabrück Richtung Dortmund zwischen Rastplatz Sandrup und Kreuz Münster-Süd (78)","road":"A1","direction":"Von Osnabrück nach Dortmund","locationText":"A1 Hansalinie, Osnabrück Richtung Dortmund zwischen Rastplatz Sandrup und Kreuz Münster-Süd Baustelle, 1 rechter Fahrstreifen gesperrt, Fahrbahn auf zwei Fahrstreifen verengt, am 1","lat":52.0104446,"lng":7.580049,"geometry":null,"startTime":"2026-09-15T09:00:00.000Z","endTime":"2026-09-15T13:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":true,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:25.736Z"},{"id":"6aa4fd068cface7d44ec8b7f","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NW/r_20240125T0916/DE-MIA/25676147-25676149-25676152-25676153_D  NW LMS-NW.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Dortmund Richtung Münster zwischen Hamm-Bockum/Werne und Rastplatz Hasenkämpe Baustelle, am 15","description":"A1 Dortmund Richtung Münster zwischen Hamm-Bockum/Werne und Rastplatz Hasenkämpe Baustelle, am 15.09.2026 von 09:00 Uhr bis 15:00 Uhr A1 - Beschilderungsarbeiten - AkD 45834 - 2-str. R HB - 9h bis 15h - Lage-1, Beschilderungsarbeiten A1 Dortmund Richtung Münster zwischen Hamm-Bockum/Werne (80) und Rastplatz Hasenkämpe","road":"A1","direction":"Von A1 Dortmund nach Münster","locationText":"A1 Dortmund Richtung Münster zwischen Hamm-Bockum/Werne und Rastplatz Hasenkämpe Baustelle, am 15","lat":51.7027969,"lng":7.66315,"geometry":null,"startTime":"2026-09-15T09:00:00.000Z","endTime":"2026-09-15T13:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:28.847Z"},{"id":"6aa4eee38cface7d44ec816f","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NW/r_20240125T0916/DE-MIA/25505008-25505443-25505444-25505450_000_D  NW LMS-NW.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Dortmund Richtung Köln zwischen Kreuz Dortmund/Unna und Raststätte Lichtendorf Nord Schutzplankenerneuerung, am 15","description":"A1 Dortmund Richtung Köln zwischen Kreuz Dortmund/Unna und Raststätte Lichtendorf Nord Schutzplankenerneuerung, am 15.09.2026 von 08:00 Uhr bis 16:00 Uhr A1 - Arbeiten an Schutzeinrichtungen - AkD 45143 - 3-str. R Köln - 15.9i.26, 16.9.26 je 8h bis 16h - Lage-1, Arbeiten an Schutzeinrichtungen A1 Dortmund Richtung Köln zwischen Kreuz Dortmund/Unna und Raststätte Lichtendorf Nord","road":"A1","direction":"Von A1 Dortmund nach Köln","locationText":"A1 Dortmund Richtung Köln zwischen Kreuz Dortmund/Unna und Raststätte Lichtendorf Nord Schutzplankenerneuerung, am 15","lat":51.4957161,"lng":7.63612,"geometry":null,"startTime":"2026-09-15T08:00:00.000Z","endTime":"2026-09-15T14:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":false,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:07.060Z"},{"id":"6aa4e4648cface7d44ec7922","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:20240125T0916/DE-MIA/25690194-25711880-25711881-25711886.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Köln/Koblenz Richtung Trier zwischen Mehren und Manderscheid Fahrbahnerneuerung, rechter Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 15","description":"A1 Köln/Koblenz Richtung Trier zwischen Mehren und Manderscheid Fahrbahnerneuerung, rechter Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 15.09.2026 von 07:00 Uhr bis 16:00 Uhr A1 von Mehren (AS) Fahrbahninstandsetzung - A1 Fahrbahninstandsetzung - Lage-1, Fahrbahninstandsetzung A1 Köln/Koblenz Richtung Trier zwischen Mehren (121) und Manderscheid","road":"A1","direction":"Von A1 Köln/Koblenz nach Trier","locationText":"A1 Köln/Koblenz Richtung Trier zwischen Mehren und Manderscheid Fahrbahnerneuerung, rechter Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 15","lat":50.1443367,"lng":6.874147,"geometry":null,"startTime":"2026-09-15T07:00:00.000Z","endTime":"2026-09-15T14:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":true,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:22.954Z"},{"id":"6aa38f678cface7d44eb5a40","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:20240125T0916/DE-MIA/25690194-25711824-25711825-25711830.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Köln/Koblenz Richtung Trier zwischen Rastplatz Schalkenmehren und Manderscheid Fahrbahnerneuerung, linker Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 14","description":"A1 Köln/Koblenz Richtung Trier zwischen Rastplatz Schalkenmehren und Manderscheid Fahrbahnerneuerung, linker Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 14.09.2026 von 07:00 Uhr bis 16:00 Uhr A1 von Mehren (AS) Fahrbahninstandsetzung - A1 Fahrbahninstandsetzung - Lage-1, Fahrbahninstandsetzung A1 Köln/Koblenz Richtung Trier zwischen Rastplatz Schalkenmehren und Manderscheid","road":"A1","direction":"Von A1 Köln/Koblenz nach Trier","locationText":"A1 Köln/Koblenz Richtung Trier zwischen Rastplatz Schalkenmehren und Manderscheid Fahrbahnerneuerung, linker Fahrstreifen gesperrt, Fahrbahn auf einen Fahrstreifen verengt, am 14","lat":50.153717,"lng":6.881984,"geometry":null,"startTime":"2026-09-14T07:00:00.000Z","endTime":"2026-09-14T14:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":true,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:21.263Z"},{"id":"6aa055418cface7d44e893f5","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:LMS-NW/r_TIC-WZEX/42/adb-vzd/19116612-23235025-25712686-25712690#RW_D  NW LMS-NW.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"active","roadworkPhase":"active","roadworkPhaseLabel":"aktiv","title":"A1 Richtung Dortmund zwischen Einfahrt Burscheid und Talbrücke Bruchermühle Fahrbahnerneuerung, Richtungsfahrbahn gesperrt, von 11","description":"A1 Richtung Dortmund zwischen Einfahrt Burscheid und Talbrücke Bruchermühle Fahrbahnerneuerung, Richtungsfahrbahn gesperrt, von 11.09.2026 20:00 Uhr bis 14.09.2026 05:00 Uhr A1 Fahrbahninstandsetzung (AM Remscheid) - WB 6 FR DO - Einfahrt AS Burscheid FR DO, Fahrbahninstandsetzung A1 Richtung Dortmund zwischen Einfahrt Burscheid (97) und Talbrücke Bruchermühle","road":"A1","direction":"Von A1 nach Dortmund","locationText":"A1 Richtung Dortmund zwischen Einfahrt Burscheid und Talbrücke Bruchermühle Fahrbahnerneuerung, Richtungsfahrbahn gesperrt, von 11","lat":51.0855255,"lng":7.133883,"geometry":null,"startTime":"2026-09-11T20:00:00.000Z","endTime":"2026-09-14T03:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":true,"publicWarningText":"","future":false,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:25.296Z"},{"id":"6a9a9eac8cface7d44e3b240","source":"mobilithek","sourceId":"mobilithek_nrw_de_traffic:TIC-WZEX/42/adb-vzd/25508490-25509816-25509836-25509839#RW.0","service":"mobilithek_nrw_de_traffic","type":"roadwork","category":"roadworks","subType":"datex2-situation-publication","subCategory":"planned","roadworkPhase":"planned","roadworkPhaseLabel":"geplant","title":"A1 Trier Richtung Köln/Koblenz Rastplatz Pohlbach Fahrbahnerneuerung, gesperrt, von 14","description":"A1 Trier Richtung Köln/Koblenz Rastplatz Pohlbach Fahrbahnerneuerung, gesperrt, von 14.09.2026 15:00 Uhr bis 18.09.2026 10:00 Uhr PP Salmrohr, Instandsetzung der Deckschicht, FR Trier - Abfahrt von der A1 Salmtal (aus Richtung Wittlich) Instandsetzung der Deckschicht - PP Pohlbach, Instandsetzung auf/an der Deckschicht A1 Trier Richtung Köln/Koblenz Rastplatz Pohlbach","road":"A1","direction":"Von A1 Trier nach Köln/Koblenz Rastplatz Pohlbach Fahrbahnerneuerung","locationText":"A1 Trier Richtung Köln/Koblenz Rastplatz Pohlbach Fahrbahnerneuerung, gesperrt, von 14","lat":49.91927,"lng":6.856924,"geometry":null,"startTime":"2026-09-14T15:00:00.000Z","endTime":"2026-09-18T08:00:00.000Z","severity":1,"severityLabel":"info","safetyRelated":false,"requiresProminentWarning":true,"publicWarningText":"","future":true,"fetchedAt":"2026-09-13T15:18:54.069Z","updatedAt":"2026-09-13T15:19:15.537Z"}],"counts":{"total":204,"jam":1,"roadwork":198,"closure":0,"warning":1,"hazard":0,"accident":2,"wrong_way_driver":0,"weather":0,"obstruction":2,"event":0,"other":0},"cacheFresh":false,"sync":null,"warning":"","lastRun":{"ok":true,"source":"autobahn","startedAt":"2026-09-13T15:23:35.292Z","finishedAt":"2026-09-13T15:23:35.716Z","durationMs":424,"roads":["A61"],"roadSync":{"fetchedAt":"2026-09-13T15:23:35.292Z","roadCount":107,"roads":["A1","A2","A3","A4","A5","A6","A7","A8","A9","A10","A11","A12","A13","A14","A15","A17","A19","A20","A21","A23","A24","A25","A26","A27","A28","A29","A30","A31","A33","A36","A37","A38","A39","A40","A42","A43","A44","A45","A46","A48","A49","A52","A57","A59","A60","A61","A62","A63","A64","A65","A66","A67","A70","A71","A72","A73","A81","A92","A93","A94","A95","A96","A98","A99","A100","A103","A111","A115","A117","A143","A210","A215","A226","A261","A270","A281","A293","A320","A352","A445","A448","A480","A485","A516","A524","A535","A553","A555","A559","A560","A562","A565","A571","A573","A602","A620","A640","A643","A648","A64A","A656","A659","A661","A671","A980","A995","A99A"]},"fetched":32,"upserted":32,"deactivated":183,"roadResults":[{"road":"A61","fetched":32,"upserted":32,"deactivated":183,"byType":{"jam":0,"roadwork":32,"closure":0,"warning":0}}]},"publishedEvents":[],"sources":{"autobahn":204,"published":0,"regionalHidden":15}}